TAC:10837
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
| From | |
MONTHYEARML20236X9731978-09-22022 September 1978
[table view]Proposed Tech Specs 3.2.3 Re Nuclear Enthalpy Hot Channel Factor & 4.2.2.2 Re Radial Peaking Factor ML20244A4651978-09-22022 September 1978 Application for Amend to License DPR-66,changing Tec Spec 3.2.3 Re Nuclear Enthalpy Hot Channel Factor,Tech Spec 4.2.2.2 Re Radial Peaking Factor & Removing Imposition of Rod Bow Linear Power Penalty for Region Average Burnups ML20071G1291978-12-14014 December 1978 Forwards Addl Info Re Lic Amend Appl Covering Eval of Low Feedwater Flow Reactor Trip Setpoint Change ML19263C2871979-02-0808 February 1979 Forwards Addl Info Re Proposed Tech Spec Change to Allowable Valves of Unit 1 Reactor Core Radial Peaking Factor (Fxy) ML19242B7491979-07-23023 July 1979 Forwards Approval of Tech Spec Changes,Reflecting New Experimental Data from Westinghouse on Fuel Rod Bowing. W/O Encl 1978-09-22 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:10837&oldid=4857208"