JPN-98-036, Forwards Application for Amend to DPR-59,revising Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14.Proprietary GE Addl Info Encl.Proprietary Info Withheld (Ref 10CFR2.790(b)(1))

From kanterella
(Redirected from JPN-98-036)
Jump to navigation Jump to search
Forwards Application for Amend to DPR-59,revising Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14.Proprietary GE Addl Info Encl.Proprietary Info Withheld (Ref 10CFR2.790(b)(1))
ML20236X768
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/03/1998
From: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138K589 List:
References
JPN-98-036, JPN-98-36, NUDOCS 9808100246
Download: ML20236X768 (3)


Text

. _ _ _ _. _ _ - _ _ _ _ _ _ _ _ _ _ - -

l g -

se 123 Man Sueet WMe Pimns, New York 10601 914 081 6050 l

014 28L3309 (Fad

  1. > NewWrkPtmer s- -

4# Authority s"%72a?:"'

l 1

August 3,1998 JPN-98-036

)

U. S. Nuclear Regulatory Cornmission ATTN: Document Control Desk i

Mail Station P1-137 Washington, DC 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Change to the Technical Specifications Regarding Minimum Critical Power Ratio Safetv Limit (JPTS-98-002)

Reference:

General Electric Letter, J. A. Baumgartner to P. Lemberg, " Cycle Specific SLMCPR for FitzPatrick Cycle 14," dated July 17,1998

Dear Sir:

This application for an amendment to the James A. FitzPatrick Technical Specifications (TS) proposes a revision to a note which will allow TS Section 1.1.A, regarding the Safety Limit Minimum Critical Power Ratio (SLMCPR), to be applicable during Cycle 14. TS Section 1.1.A is currently only applicable for Cycle 13.

The signed original of the Application for Amendment to the Operating License is enclosed for filing. Attachment I contains the proposed new TS page and Attachment 11 is the Safety Evaluation for the proposed change. A markup of the affected TS page is included as Attachment lil.

A General Electric letter (Reference) specifies that the SLMCPR limits for FitzPatrick, Cycle 14 remain unchanged compared to that approved by the NRC under Amendment 238. This letter is included in this submittal as Attachment IV. Information in Attachment IV is considered General Electric (GE) proprietary information and should be withheld from public disclosure in accordance with 10 CFR 9.17(a)(4) and 10 CFR 2.790(a)(4). An Affidavit, prepared in accordance with 10 CFR 2.790(b)(1), supporting this request is provided with Attschment IV. Attachment V contains the non-proprietary version of

[

Attachment IV.

The proposed TS changes are not applicable for Cycle 13. The Authority requests the Amendment specify that the changes may be implemented any time after the upcoming Refueling Outage 13 begins (Currently scheduled to begin on October 16,1998), but must f

be implemented prior to startup for Cycle 14.

G d C '-

o

( } aug L

9808100246 980803 r 4

J DR ADOCK 0500 g

I l

/

e A copy of this application and associated attachments is being provided to the.

designated New York State official in accordance with 10 CFR 50.91.

There are no commitments made by the Authority in this letter. If you have any questions, please contact Ms. C. D. Faison.

Very truly yo rs,

/

/.Knubel Senior Vice President and Chief Nuclear Officer att: as stated cc:

Regional Administrator U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. J. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects-l/Il U. S. Nuclear Regulatory Commission Mail Stop OWFN 14B2 Washington, DC 20555 Mr. F. William Valentino, President New York State Energy, Research and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 l