)DA O}/JAntt Qy (AW D fMb!t.p' ' l PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE

.5,

(' . September 12, 1975 2

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-90 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 1:00 p.m. on the date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS

~

NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO i "BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT I

.%. .. ., NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY j WILL BE ISSUED IF WARRANTED. I I

Facility: Zion Unit 1 (Commonwealth Edison Company) l

.:4 (

Subject:

INADVERTENT CONTAINMENT SPRAY EVENT l J

The Co m onwealth Edison Company notified the Chicago Regional Office on September 12, 1975, that the containment spray system sprayed the ,

containment for a 2 minute period at 0237 hours0.00274 days <br />0.0658 hours <br />3.918651e-4 weeks <br />9.01785e-5 months <br /> during the conduct of a I planned surveillance test due to an incorrectly positioned ma,nual valve.

_ Af ter receiving erroneous rod position indications, the operator manually

==gr-scramed the reactor. No other anomalies were noted prior to the scram. l g~ Subsequent to the scram, random DC grounds were observed. The licensee

( estimates that 2000 gallons of borated water were sprayed into containment.

No personnel were in containment during the event. No releases occurred I outside of containment. The licensee is reviewing corrective action for {

any damage which may have occurred as a result of the spray actuation. l A Region III inspector has been dispatched to the site. );

I Region III received notification of this occurrence by telephone from G. Wagner, Assistant Plant Superintendent, at 1040 hours0.012 days <br />0.289 hours <br />0.00172 weeks <br />3.9572e-4 months <br /> September 12, 1975.

Contact:

RWarnick, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541  %/

Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden '

G. F. Murphy, JCAE ,

Commissioner Kennedy C. C . Kamerer , CA O

~

L. V. Gpseick, EDO - D. F. Knuth, IE J. A. Harris, PA B. C. Rusche, NRR H. H. Brown, ISP T. J. McTiernah,~AIA K. R. Chapman, NMSS H. K. Shapar, ELD I Transmitted: P Bldg ,2 h. ; E St). ,O

MNBB 3 M ; Luge me d r i I

].-..;. PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE

(.

l I 9807310247 780912 l PDR IsrE PDR PN-75-090 I

L_-_-----__------- _ _ - - - -