November 17, 1987 Docket No. 50-458 Mr.
James C. Deddens Senior Vice President, (RBNG)
Gulf States Utilities P. O. Box 220 St. Francisville, LA 70775 ATTN:
Nuclear Licensing l
Dear Mr. Deddens:
SUBJECT:
TECHNICAL SPECIFICATIONS REGARDING THE ULTIMATE HEAT SINK TEMPERATURE - RIVER BEND STATION, UNIT NO. 1 By letter dated September 28, 1987, the NRC staff informed you that the proposed temperature monitoring system for the River Bend Station ultimate heat sink, as described in your June 29, 1987 letter, is acceptable.
Our letter requested that you provide proposed technical specifications for this system for staff review and approval.
This request was in accordance with Section 9.2.5 of Supplement No. 3 of the Safety Evaluation Report related to the operation of River Bend Station (NUREG-0989).
By letter dated November 13, 1987, you provided proposed Technical Specification changes which are being reviewed by the staff.
License condition 2(c)(9) of Facility Operating License NPF-47 requires that 1
prior to startup following the first refueling outage Gulf States Utilities shall have installed and operational in the ultimate heat sink a permanent i
temperature monitoring system acceptable to the NRC staff and Technical Speci-fication modifications as required.
Current Technical Specification 3/4.7.1.2 provides the limiting condition for operation and surveillance requirements for the ultimate heat sink.
This current Technical Specification specifies the minimum basin water level, maximum basin water temperature and minimum number of operable cooling tower fans per division.
It is the staff's judgment that these current technical specifications provide an acceptable level of safety to permit operation following restart from the first refueling outage during the time that the staff is completing its review of your proposed technical specification change.
Sincerely, lb Jose A. Calvo, Director 8712020157 871117 Project Directorate - IV PDR ADO 4' 05000458 Division of Reactor Projects - III, P
PDR IV, V and Special Projects 1
cc:
See next page DISTRIBUTION
< Docket File NRC PDR Local PDR PD4 Reading DR4A J. Calvo P. Noonan Project Manager OGC-Bethesda E. Jordan J. Partlow ACRS (10)
PD4 Plant File J. Craig i
PNoon %
Pj PD4/D k PDUL MP WP son:sr i JCraig JCalvo 11//h/87 11/g/87 11S/87 11/17/87 i
i
November 17, 1987 Docket No. 50-458 Mr.
James C. Deddens Senior Vice President, (RBNG)
Gulf States Utilities P. O. Box 220 St. Francisville, LA 70775 ATTN:
Nuclear Licensing
Dear Mr. Deddens:
SUBJECT:
TECHNICAL SPECIFICATIONS REGARDING THE ULTIMATE HEAT SINK TEMPERATURE - RIVER BEND STATION, UNIT NO. 1 By letter dated September 28, 1987, the NRC staff informed you that the proposed temperature monitoring system for the River Bend Station ultimate heat sink, as described in your June 29, 1987 letter, is acceptable.
Our letter requested that you provide proposed technical specifications for this system for staff review and approval.
This request was in accordance with Section 9.2.5 of Supplement No. 3 of the Safety Evaluation Report related to the operation of River Bend Station (NUREG-0989).
By letter dated November 13, 1987, you provided proposed Technical Specification changes which are being reviewed by the staff.
License condition 2(c)(9) of Facility Operating License NPF-47 requires that prior to startup following the first refueling outage Gulf States Utilities shall have installed and operational in the ultimate heat sink a permanent temperature monitoring system acceptable to the NRC staff and Technical Speci-fication modifications as required.
Current Technical Specification 3/4.7.1.2 provides the limiting condition for operation and surveillance requirements for the ultimate heat sink.
This current Technical Specification specifies the minimum basin water level, maximum basin water temperature and minimum number of operable cooling tower fans per division.
It is the staff's judgment that these current technical specifications provide an acceptable level of safety to permit operation following restart from the first refueling outage during the time that the staff is completing its review of your proposed technical specification change.
Sincerely, l.$
Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects cc:
See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading I
DR4A J. Calvo P. Noonan Project Manager l
OGC-Bethesda E. Jordan J. Partlow ACRS (10)
PD4 Plant File J. Craig i
PD4/Lk P
A PD4/D PNoonM \\'
WP son:sr i JCraig JCalvo 11//)/87 11/g/87 114L,/87 11/I7/87
Mr. James C. Deddens
)
Gulf States Utilities Company River Bend Nuclear Plant I
CC:
Troy B. Conner, Jr., Esq.
Mr. J. E. Booker i
Conner and Wetterhahn Manager-River Bend Oversight 1747 Pennsylvania Avenue, NW P. O. Box 2951 Washington, D.C.
20006 Beaumont, TX 77704
)
l Mr. Eddie Grant Mr. William H. Spell, Administrator j
Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Office of Environmental Affairs j
P. O. Box 220 P. O. Box 14690
)
St. Francisville, LA 70775 Baton Rouge, Louisiana 70898 i
Richard M. Troy, Jr., Esq.
l Assistant Attorney General in Charge Mr. J. David McNeill, III State of Louisiana Department of Justice William G. Davis, Esq.
i 234 Loyola Avenue Department of Justice I
New Orleans, Louisiana 70112 Attorney General's Office 7434 Perkins Road Resident Inspector Baton Rouge, Louisiana 70808 P. O. Box 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive Gretchen R. Rothschild Baton Rouge, Louisiana 70806 Louisianians for Safe Energy, Inc.
1659 Glenmore Avenue Baton Rouge, Louisiana 70775 President of West Feliciana Police Jury Regional Administrator, Region IV P. O. Box 1921 U.S. Nuclear Regulatory Commission St. Francisville, Louisiana 70775 Office of Executive Director for Operations Mr. Frad J. Uddo 611 Ryan Plaza Drive, Suite 1000 Uddo & Porter Arlington, Texas 76011 6305 Elysian Fields Avenue Suite 400 Philip G. Harris New Orleans, Louisiana 70122 Cajun Electric Power Coop. Inc.
10719 Airline Highway P. O. Box 15540 Baton Rouge, LA 70895
_- -