ML20236T522
| ML20236T522 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 11/20/1987 |
| From: | Johnston W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bird R BOSTON EDISON CO. |
| Shared Package | |
| ML20236T524 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8712010333 | |
| Download: ML20236T522 (2) | |
See also: IR 05000293/1987032
Text
_
- - _
_
_
l
'
.
-o
.
NOV 2 01987
Docket No.
50-293
Boston Edison Company
ATTN: Ralph G. Bird
Senior Vice President - Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Special Safety Inspection Report No. 50-293/87-32
.This refers to the special safety inspection conducted by Mr. N. Blumberg of
this office on August
3-7,
10-14, and 20, 1987, at Pilgrim Nuclear Power
Station, Plymouth, Massachusetts; Boston Edison Engineering Offices, Braintree,
,
Massachusetts; and Pilgrim Training Center, Chiltonville, Massachusetts of
activities authorized by NRC License No. DPR-35 and to the discussions of our
i
findings at a preliminary exit mee;ing at Pilgrim Station held on August 14,
!
1987, by Mr. Blumberg with Mr. K. Roberts and other members of your staff at
the conclusion of the inspection activities.
Additional discussions of our
findings were held at a final exit meeting at NRC Region I offices, King of
Prussia, Pennsylvania on August 20, 1986, between Mr. J. Durr of our staff and
Mr. R. Swanson and other members of your staff.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
{
inspection consisted of selective examinations of procedu~es and representative
j
records, interviews with personnel, and observations by the inspector,
j
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the " General Statement of
Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C
You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
,
required by the Paperwork Reduction Act of 1980, PL 96-511.
l
8712010333 871120
1
ADOCK 05000293
G
\\<s
l
OFFICIAL RECORD COPY
IR PILGRIM 87-32 - 0001.0.0
i
L
11/12/87
L
.-
- - - - - - - - - - - - - - - -
-
.
Boston Edison Company
2
.
Your cooperation with us in this matter is appreciated.
,
Sincerely,
Origins 1 Signed ??!
t
William V. Johnston, Acting Director
Division of Reactor Safety
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report Number 50-293/87-32
cc w/ encl:
K. P. Roberts, Nuclear Operations Manager
Paul Levy, Chairman, Department of Public Utilities
Chairman, Board of Selectmen
Plymouth Civil Defense Director
J. D. Keyes, Boston Edison Regulatory Affairs and Programs
E. D. Robinson, Nuclear Information Manager
R. N. Swanson, Nuclear Engineering Department Manager
The Honorable E. J. Markey
Senator Edward P. Kirby
The Honorable Peter V. Forman
Sharon Pollard, Secretary of Energy Resources
Rachel Shimshak, MASSPIRG
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
Robert J. Bores, DRSS
W. Raymond, SRI, Millstone
H. Eichenholz, SRI, Vermont Yankee
Sam Collins, DRP
R :DRS
R DRS
R
S
Blumberg
Anderson
Blough
o
Johnston
11// '87
11)(h/87
11/20/87
11/l7/87
11//7/87
0FFICIALRECORDCOP)Y
IR PILGRIM 87-32 - 0002.0.0
11/13/87
_ - - _ _ -