Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/98-09
ML20236T154
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/22/1998
From: Johnson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
References
50-285-98-09, 50-285-98-9, NUDOCS 9807270465
Download: ML20236T154 (3)


See also: IR 05000285/1998009

Text

[ ' ' ~ ~

,

.,

.

l

p ># "'49

UNITED STATES

t

.

.f.i

. %

NUCLEAR REGULATORY COMMISSION

l

o

)

g

E'

REGION IV

%'s, . . . . 8[

(

611 RYAN PLAZA DRIVE, SUITE 400

AR LINGTON, TEXAS 760118064

'

l

JUL 2 21998

l

S. K. Gambhir, Division Manager

Engineering & Operations Support

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399

i

'

Hwy. 75 - North of Fort Calhoun

l

Fort Calhoun, Nebraska 68023-0399

SUBJECT:

NRC INSPECTION REPORT 50-285/98-09

Thank you for your letter of July 15,1998, in response to our June 25,1998, letter and

Notice of Violation concerning the failure to have an adequate procedure for performing an

activity that affected quality. Specifically, Procedure OP-3A, " Plant Shutdown," Revision 19,

l

directed operators to use pressurizer steam space temperature indication to monitor plant

cooldown when, in fact, pressurizer liquid space temperature should have been utilized. We

have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation.

We will review the implementation of your corrective actions during a future inspection to

determine that full compliance has been achieved and will be maintained.

-

'

Sincerely,

h

W.

. Johnson, Chief

Project Branch B

Division of Reactor Projects

Docket No.:

50-285

License No.: DPR-40

i

l

l

9807270465 980722

(

l

PDR

ADOCK 05000285

'

G

PM

E _ _ _ _ _ _ _

_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - . - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ . -

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - _ _

.

)

-

,

.,

Omaha Public Power District

-2-

cc:

James W. Tills, Manager

- Nuclear Licensing

'

. Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399 -

Hwy. 75 - North of Fort Calhoun

Fort Calhoun, Nebraska 68023-0399

James W. Chase, Manager

Fort Calhoun Station

-

P.O. Box 399

Fort Calhoun, Nebraska 68023

Perry D. Robinson, Esq.

Winston & Strawn

' 1400 L. Street, N.W.

.

Washington, D.C. 20005-3502

Chairman

Washington County Board of Supervisors

Blair, Nebraska 68008-

Cheryl Rogers, LLRW Program Manager

Environmental Protection Section

Nebraska Department of Health

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska 68509-5007

L

\\

!-

l.

!

k

O

_

- _ _ - _ _ - _ _ _ _ _ _ - _ _ _

- - _ - _ _

-

. _ -

._ _ -__ _ _ __ _ _ _ __ _ _ _ _ _ _ ___ _ __ _ _ - _ - _

.

. . .

.,

Omaha Public Power District

-3-

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

DRS-PSB

DRP Director

. MIS System

Branch Chief (DRP/B)

RIV File.

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

Resident inspector

t

i

'

!

.

.

C'l0050

l

DOCUMENT NAME: R:\\ FCS\\FC809AK.WCW

To receive copy of document, IEicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

L

' RIV:PE:DRP/A ..F

C:DRP/B / )

'

'

RVAzua;dj//W

WDJohnsfyri

7/21/98 V//

7W98 '

OFFICIAL RECORD COPY

.

______ _ ______.___ _

_ _ _ _ _ _ .

,,

0998

'

Omaha Pdk Power Ostner

aha,

aska i 2N7

JUL

July 15' 1998

LIC-98-0093

U.S. Nuclear Regulatory Commission

ATTN: Document Control Desk

Mail Station P1-137

Washington. DC 20555

References: 1.

Docket No. 50-285

2.

Letter from NRC (W. D. Johnson) to OPPD (S. K. Gambhir)

dated June 15, 1998

3.

Licensee Event Report 50-285/1998-006, dated June 22. 1998

SUBJECT:

NRC Inspection Report No. 50-285/98-09. Reply to a Notice of

Violation

The subject report transmitted a Notice of Violation (NOV) resulting from a

NRC inspection conducted April 12 through May 23, 1998 at the Fort Calhoun

,

Station (FCS). Attached is the Omaha Public Power District (OPPD) response to

'

this NOV.

If you should have any questions, please contact me.

Sincerely.

$

fo'

S. K. Gambhir

Division Manager

Engineering and Operations Support

SKG/brh

Attachment

,

c:

E. W. Merschoff. NRC Regional Administrator Region IV

L. R. Wharton, NRC Project Manager

W. C. Walker. NRC Senior Resident Inspector

Winston and Strawn

cl$ -1 3 0 7

asia g g g

g

ruoyment -tn aa omnunity

u___-___-

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

..

<.

.

G

. Attachment

LIC-98-0093

Page 1

REPLY.T0 A NOTICE OF VIOLATION

Omaha P'ublic Power District

Docket No.:

50 285

Fort Calhoun Station

License No.: DPR 40

During an NRC inspection conducted on April 12 through May 23, 1998, one

violation of NRC requirements was identified.

In accordance with the " General

' Statement of Policy and Procedure for NRC Enforcement Actions," NUREG 1600,

the. violation is listed below:

1

j

-10'CFR'Part 50, Appendix B, Criterion V, states, in part, that

_

activities affecting quality shall be prescribed by documented

instructions,~ procedures, or drawings of_a type appropriate to the

.

circumstances and shall be accomplished in accordance with these

' instructions, procedures, or drawings.

Contrary to the above on April 2, 1998, it was determined that the

licensee did not have an adequate procedure for performing an activity

thet affected quality. Specifically, Procedure OP 3A, " Plant Shutdown,"

L

Revision 19 directed operators to use pressurizer ' steam space

temperature indication to monitor plant.cooldown_when, in fact.

pressurizer. liquid space temperature should have been utilized. This

l-

resulted in operations personnel allowing reactor coolant system

pressure to decrease below the minimum required pressure for maintaining

net positive suction head for the operating reactor coolant pump.

This is a Severity Level IV violation (Supplement 1)(50 285/9809 01).

l

.

0 PPD Resnonse

!

1.

Reason for the Violation

The reason for this violation was inadequate review of a procedure change.

L

The procedure change that incorporated using the steam space temperature

indication had been marked " stet" indicating that the change from liquid space

to steam space temperature should not be incorporated. The change was

incorporated and not discovered during subsequent reviews. Prior to this

. event ~ the practice was to only review those portions of the procedure that

1

,

individuals knew were being completed.

l

r

<

._.

_ _ _ _ _ _ _ _

_ _ _ _ _ _ _

______ _ _

i

.

..

.

Attachment

LIC-98-0093

Page 2

2.

Corrective Steps Taken and Results Achieved

l

l

Following this event. Operating Procedures and many of the Operating

l

Instructions were reviewed prior to use during the 1998 refueling outage.

l

This review was completed by a former Assistant Plant Manager-0perations, and

a Senior Nuclear Design Engineer, both previous Senior Reactor Operator

License holders at Fort Calhoun Station. Additionally, a side-by-side, draft-

to-final review of th; entire procedure is currently being conducted on

procedure changes.

3.

Corrective Steps That Will Be Taken To Avoid Further Violations

Procedure OP-3A will be revised to remove reference to the pressurizer staam

space temperature by August 1. 1998. This procedure is also being revised to

incorporate Emergency Core Cooling System equipment operability requirements

during shutdown modes as conmitted to in LER-1998-006 (Reference 3).

Conducting a complete. thorough, administrative and technical review of

procedure changes will be re-emphasized to typing reviewers. Qualified

Reviewers, and Responsible Department Heads by July 31, 1998.

Standing Order G-30. " Procedure Changes and Generation." is being rewritten to

improve the overall procedure change process and will be revised by August 31.

1998.

4.

The date when full compliance will be achieved

Fort Calhoun Station will be in full compliance by August 1.1998.

- - _ _ - _