l
p ># "'49
UNITED STATES
t
.
.f.i
. %
NUCLEAR REGULATORY COMMISSION
l
o
)
g
- E'
REGION IV
%'s, . . . . 8[
(
611 RYAN PLAZA DRIVE, SUITE 400
'
l
JUL 2 21998
l
S. K. Gambhir, Division Manager
Engineering & Operations Support
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
i
'
Hwy. 75 - North of Fort Calhoun
l
Fort Calhoun, Nebraska 68023-0399
SUBJECT:
NRC INSPECTION REPORT 50-285/98-09
Thank you for your letter of July 15,1998, in response to our June 25,1998, letter and
Notice of Violation concerning the failure to have an adequate procedure for performing an
activity that affected quality. Specifically, Procedure OP-3A, " Plant Shutdown," Revision 19,
l
directed operators to use pressurizer steam space temperature indication to monitor plant
cooldown when, in fact, pressurizer liquid space temperature should have been utilized. We
have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation.
We will review the implementation of your corrective actions during a future inspection to
determine that full compliance has been achieved and will be maintained.
-
'
Sincerely,
h
W.
. Johnson, Chief
Project Branch B
Division of Reactor Projects
Docket No.:
50-285
License No.: DPR-40
i
l
l
9807270465 980722
(
l
ADOCK 05000285
'
G
E _ _ _ _ _ _ _
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - . - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ . -
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - _ _
.
)
-
,
.,
Omaha Public Power District
-2-
cc:
James W. Tills, Manager
- Nuclear Licensing
'
. Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399 -
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
James W. Chase, Manager
Fort Calhoun Station
-
P.O. Box 399
Fort Calhoun, Nebraska 68023
Perry D. Robinson, Esq.
Winston & Strawn
' 1400 L. Street, N.W.
.
Washington, D.C. 20005-3502
Chairman
Washington County Board of Supervisors
Blair, Nebraska 68008-
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
Nebraska Department of Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
L
\\
!-
l.
!
k
O
_
- _ _ - _ _ - _ _ _ _ _ _ - _ _ _
- - _ - _ _
-
. _ -
._ _ -__ _ _ __ _ _ _ __ _ _ _ _ _ _ ___ _ __ _ _ - _ - _
- .
. . .
.,
Omaha Public Power District
-3-
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
DRS-PSB
DRP Director
. MIS System
Branch Chief (DRP/B)
RIV File.
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector
t
i
'
!
.
.
C'l0050
l
DOCUMENT NAME: R:\\ FCS\\FC809AK.WCW
To receive copy of document, IEicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
L
' RIV:PE:DRP/A ..F
C:DRP/B / )
'
'
RVAzua;dj//W
WDJohnsfyri
7/21/98 V//
7W98 '
OFFICIAL RECORD COPY
.
______ _ ______.___ _
_ _ _ _ _ _ .
,,
0998
'
Omaha Pdk Power Ostner
aha,
aska i 2N7
JUL
July 15' 1998
LIC-98-0093
U.S. Nuclear Regulatory Commission
ATTN: Document Control Desk
Mail Station P1-137
Washington. DC 20555
References: 1.
Docket No. 50-285
2.
Letter from NRC (W. D. Johnson) to OPPD (S. K. Gambhir)
dated June 15, 1998
3.
Licensee Event Report 50-285/1998-006, dated June 22. 1998
SUBJECT:
NRC Inspection Report No. 50-285/98-09. Reply to a Notice of
Violation
The subject report transmitted a Notice of Violation (NOV) resulting from a
NRC inspection conducted April 12 through May 23, 1998 at the Fort Calhoun
,
Station (FCS). Attached is the Omaha Public Power District (OPPD) response to
'
this NOV.
If you should have any questions, please contact me.
Sincerely.
$
fo'
S. K. Gambhir
Division Manager
Engineering and Operations Support
SKG/brh
Attachment
,
c:
E. W. Merschoff. NRC Regional Administrator Region IV
L. R. Wharton, NRC Project Manager
W. C. Walker. NRC Senior Resident Inspector
Winston and Strawn
cl$ -1 3 0 7
asia g g g
g
ruoyment -tn aa omnunity
u___-___-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
..
<.
.
G
. Attachment
LIC-98-0093
- Page 1
REPLY.T0 A NOTICE OF VIOLATION
Omaha P'ublic Power District
Docket No.:
50 285
Fort Calhoun Station
License No.: DPR 40
During an NRC inspection conducted on April 12 through May 23, 1998, one
- violation of NRC requirements was identified.
In accordance with the " General
' Statement of Policy and Procedure for NRC Enforcement Actions," NUREG 1600,
the. violation is listed below:
1
j
-10'CFR'Part 50, Appendix B, Criterion V, states, in part, that
_
activities affecting quality shall be prescribed by documented
instructions,~ procedures, or drawings of_a type appropriate to the
.
circumstances and shall be accomplished in accordance with these
' instructions, procedures, or drawings.
Contrary to the above on April 2, 1998, it was determined that the
licensee did not have an adequate procedure for performing an activity
thet affected quality. Specifically, Procedure OP 3A, " Plant Shutdown,"
L
Revision 19 directed operators to use pressurizer ' steam space
temperature indication to monitor plant.cooldown_when, in fact.
pressurizer. liquid space temperature should have been utilized. This
l-
resulted in operations personnel allowing reactor coolant system
pressure to decrease below the minimum required pressure for maintaining
net positive suction head for the operating reactor coolant pump.
This is a Severity Level IV violation (Supplement 1)(50 285/9809 01).
l
.
- 0 PPD Resnonse
!
1.
Reason for the Violation
The reason for this violation was inadequate review of a procedure change.
L
The procedure change that incorporated using the steam space temperature
indication had been marked " stet" indicating that the change from liquid space
to steam space temperature should not be incorporated. The change was
incorporated and not discovered during subsequent reviews. Prior to this
. event ~ the practice was to only review those portions of the procedure that
1
,
individuals knew were being completed.
l
r
<
._.
_ _ _ _ _ _ _ _
_ _ _ _ _ _ _
______ _ _
i
.
..
.
Attachment
LIC-98-0093
Page 2
2.
Corrective Steps Taken and Results Achieved
l
l
Following this event. Operating Procedures and many of the Operating
l
Instructions were reviewed prior to use during the 1998 refueling outage.
l
This review was completed by a former Assistant Plant Manager-0perations, and
a Senior Nuclear Design Engineer, both previous Senior Reactor Operator
License holders at Fort Calhoun Station. Additionally, a side-by-side, draft-
to-final review of th; entire procedure is currently being conducted on
procedure changes.
3.
Corrective Steps That Will Be Taken To Avoid Further Violations
Procedure OP-3A will be revised to remove reference to the pressurizer staam
space temperature by August 1. 1998. This procedure is also being revised to
incorporate Emergency Core Cooling System equipment operability requirements
during shutdown modes as conmitted to in LER-1998-006 (Reference 3).
Conducting a complete. thorough, administrative and technical review of
procedure changes will be re-emphasized to typing reviewers. Qualified
Reviewers, and Responsible Department Heads by July 31, 1998.
Standing Order G-30. " Procedure Changes and Generation." is being rewritten to
improve the overall procedure change process and will be revised by August 31.
1998.
4.
The date when full compliance will be achieved
Fort Calhoun Station will be in full compliance by August 1.1998.