i__.____.___.__.________.___._._______._________._____._________
Omaha Public Power District 1623 Harney Omaha. Nebraska 68102-2247 402/536 4000 November 20, 1987 LIC-87-777 U. S. Nuclear Reaulatory Commission ATTN:
Document Control' Desk Washington, DC 20555
References:
1.
Docket No., 50-285 2.
Generic Letter 87-12, " Loss of Residual Heat Removal (RHR)
While the Reactor Coolant System (RCS) is Partially Filled,"
dated July 9, 1987 3.
Letter R. L. Andrews (OPPD) to Document Control Desk (NRC) dated September 21, 1987 (LIC-87-593)
Gentlemen:
SUBJECT:
Schedule for Completion of Response to NRC Generic Letter 87-12 As stated in Reference 3, OPPD is providing a schedule for the completion of our response to Items 5 and 9 of NRC Generic Letter 87-12.
OPPD is negotiating with Combustion Engineering to perform a series of plant spec-ific analyses of the postulated loss of RHR scenarios.
These analyses will help determine how Fort Calhoun's Reactor Coolant System will respond to a loss of RHR event and provide information that will be of assistance in determining the appro-priate actions to be taken to prevent or mitigate the consequences of such an event.
It is anticipated that this effort will be completed by February 5, 1988.
Upon receipt of the information identified above, OPPD will be able to provide a complete response to Items 5 and 9 of Reference 2 by March 15, 1988.
If you have any questions please contact us.
S'ncerel
. L. Andrews Division Manager Nuclear Production RLA/rh c:
LeBoeuf, Lamb, Leiby & MacRae A. Bournia, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector em mar o