ML20236S641

From kanterella
Jump to navigation Jump to search
Revised Proposed Tech Spec 3.9.B.6.2.a,establishing 8 H Time Limit for Implementing Storage Tank Transfer
ML20236S641
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/18/1987
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20236S619 List:
References
NUDOCS 8711300014
Download: ML20236S641 (2)


Text

_ - - _ - - _ - _ - __

PBAPS

~

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.9.B (Cont'd) 6.

From and after the date that the fuel oil in one of the diesel generator main storage tanks does not conform with specification 4.9.A.l.f, either:

1.

Declare the associated diesel generator inoperable, or 2.

Implement the following actions:

a.

Isolate the main storage tank from the system, with the associated diesel generator being supplied from one of the remaining stora'ge tanks within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and l

b.

Establish and maintain a minimum of 104,000 gallons of l

diesel fuel oil in the l

other three main storage tanks within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and c.

Sample the fuel oil in the other three main storage tanks and confirm conformance with specifi-cation 4.9.A.1.f within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and d.

Replace the unacceptable fuel oil with acceptable fuel oil and return the storage tank to service within 7 days, cr place the reactor in Cold Shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Accelerated testing of the diesel generators and ECCS as specified in 4.5.F.1 is not required.

8711300014 071110 PDR ADOCK 05000277 PDR p

-220a-

COMMONWEALTH'OF, PENNSYLVANIA-ss.

COUNTY OF PHILADELPHIA J. S.'Kemper, being first duly. sworn, deposes and says:

'That he is Senior Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the foregoing Application for Amendment of Facility Operating Licenses and knows-the contents thereof; and that the statements and matters set forth.therein are true and correct to the best of his knowledge,.information and belief.

^

0 0 $// /=

I lor Vice President 1

i '

Subscribed and sworn to before me this6 day of Nu-1987

<G8M/. (YAn.L otary Public AAOfDf Y.FRApsums

% % PhNe PhNo. Co.

W Cormnission Empi,es July 28,1991 w

._