Text

{{#Wiki_filter:Wi!58. 'J ' ,s ggf;;[u .g} T[h[.,j d,,_; y["C One First N tional Plaza, Chicago, Illinois -b r j 4, So Ecommon :eelth Edison 1 0mm -w n!\\ v Address Fleply to: Post Offics Box 767 : t Mp$"l1 ' Ny ' Chicago, lllinois 60690 - 0767 y .j i

3'y. p.
n.,.

-n . '.s zjy y, v November 17,'1987 b g f ,.1 ,y ,b U.S. Nuclhar-Regulatiory Commission-IAttn:) Document: Control' Desk' ~ Mashington,L DC-20555 'i M1 i jf sd b y.. g.

Subject:

LaSalle County. Station. Unit 2 Proposed. Amendments to Technical. 7/,X ,' Specifications.for Facility Operating; I ' License NPF, High Density. Spent: Fuel. Racks. !NRC Docket No. 50-374 TAC No. 62832 --{ . L.' i References'(a): 'LaSalle County _ Station UFSAR~ M af v .Section 9.1,: Fuel. Storage and Handling } (b): Federal Register Vol. 51 No.'.44 dated Thursday, March 6, 1986. Pt (c)i. Letter dated September 19, 1986 transmitting 7 proposed amendment to allow use of High s l { Density Fuel Racks ((d):l" Request for. additional'information from R.G..Adensam dated November 28, 1986. (e): ' Response.to request.for, additional information from C.M.LAllen dated August 18, 1987-t (f):.' Acknowledgement'.of Request for additional information 'from October 16, 1987 telecom dated November 5, 1987 t ,+

from C.M.: Allen l

Dear' Sir' :

4 This lettier provides response to the request for additional !information'(Reference (f)) regarding a proposed Technical Specification fchange.to.. allow use of high density fuel racks in. Unit 2 (Reference'(c)). 'Rnclosed'is the response to each of the questions discussed in the

October'16', 1987. telephone' conference. These questions related to materials-

'g { provided:in' reference (e). -The drawings of the lifting and' handling rigs will.be'sent under: separate l cover. N l D n m u-y f 1 L s' i \\ f. ' : L=_ -

n- .T i

i. w F

commonwealth Edison is notifying the State of Illinois of our ' response by transmitting a copy of thisLletter and attachments to the designated state official. =' ,If you have'any additional questions regarding this matter, please j - contact this office. j l very truly yours, 4 ,7 C. M. Allen Nuclear Licensing Administrator ) Attachments j cc: Paul Shemanski - NRR' Regional Administrator - RIII NRC Resident Inspector - LSCS I M.'C. Parker - IDNS + I' 3853K c C_____._.m_____

(n,y -7,-- p w ^ e b. 's ENCLOSURE-L Questions'specifically requested additional information regarding h ','7 ( August-18, 1987 letter from CECO to NRR.regarding the High Density Spent 4 N Fuel Racks. JITEM'li-LRegarding' Question #7 g (a)- Provide' drawings of each of the, lifting and handling rigs. j ?(b)L Provide statement to effect'that,'"all the lifting and handling 11 rigs are-single failure proof."- L[r

Response

3 O ;fa < US Tool and Die"drawin'gs'which detail the lifting and handling rigs I will-be transmitted under a separate letter. The lifting and handling rigs H have.been: designed.in accordance with NURBG-0612.and as such are single failure proof. U ; l ITEM'2 - Regarding Question #10 [:

Provide drawings' r' reference FSAR figures which can be read to (a) o define the transport path of.the racks through the reactor

'~ . buildings to their; installation or storage location (s). (b). Provide discussion about why Figure 10-2 shows two load paths. L (c) Identify. obstacles over which the racks will have to be lifted such .that they are more than two feet above the refuel floor. (d) For these obstacles, identify how much clearance will be provided and what this height will be from the floor itself.

Response

Reference:

'UPSAR Vol.'X drawings M5, M15, M25 0

The racks will be received at LaSalle through the bomb-bay doors located on the Unit 1 side of the station..This entry is positioned between -column' rows 14 and 15 on row A. From this point, the racks will be lifted r L. to.the refuel floor through the equipment hatch directly west of the " bomb-bay doors. Once on the refuel floor, the modules will be installed or ' ~ stored depending.upon shipment schedules and installation progress. If the 7 ' racks cannot.be immediately installed, they will be moved into Unit 1 as ^ shown by path 1 on figure 10-2 to a suitable temporary storage location. s; . Racks to'beLinstalled will follow load path 2. During the movement of the p[ racks along.either. path 1 or 2, there are no obstacles over which the racks will have to.be lifted. -The normal height above the floor while a module is l traveling will bel limited to 1 to 2 feet. L

res r i

- 2:--

1 .c. e aN 'ITEPl 3 - Regarding Question #13 A

(a)
Provide. commitment.to verify training of personnel who will be lifting these racks to each item of the requirements specified in p

NURifG-0612. L' ' -a, f 'h! Response:. CBCo will verify that personnel who will be lifting.these racks .have been trained to the requirements specified in NUREG-0612. -In addition, a briefing'will be held.with'the crane operators to discuss load path . restrictions.du' ing the movement of the fuel racks. r .n- ,jfl- ,V 'I f J. / fi g 1 i I '- I.- in 3853K-r. i 1 \\ t...}}