Forwards List of Addl NRC Questions Discussed in 871016 Telcon Re Review of Proposed Amends to License NPF-18. Responses to Questions Will Be Provided within 2 Wks
ML20236L595
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/05/1987
From: Allen C
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
3811K, TAC-62832, NUDOCS 8711100443
Download: ML20236L595 (2)


Text

..

Ccmm:nwrzith Edlasn 4

$j One First National Plaza, Chicago, Illinois v.

Address Reply to: Post Office Box 767 Chicago, Illinois 60090 0767 November 5, 1987 U.S. Nuclear. Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

LaSalle County Station Unit 2 Proposed Amendments to Technical Specification for Facility Operating License NPF-18 High Density Spent Fuel Racks NRC Docket No. 50-374 TAC No. 62832 References (a): Letter dated September 19, 1986 from C.M. Allen to H.R. Denton

~(b): Letter dated August 18, 1987 from '.:.M. Allen to US NRC Gentlemen:

Pursuant to 10 CFR 50.90, Commonwealth Edison proposed to amend Appendix A, Technical Specification. to Facility Operating License NPF-18 in reference (a). That proposal was amended by reference (b).

During review of that revised proposal your staff had additional questions discussed in a telecom held on October 16, 1987. These questions are enclosed in Attachment A.

Responses to these questions will be provided within 2 weeks.

Very truly yours, C. M. Allen Nuclear Licensing Administrator Cs Attachment cc: Region III Inspector - LSCS P. Shemanski - NRR M. C. Parker - IDNS

\\

b 3811K

\\ \\

8711100443 G71105 PDR ADOCK 05000374 P

PDR

r.

=

Wij -

T,

-g p

1 e

Qs

?;l-.

i

(

.,7 m

'J,

'd x

s 9

S. :

.f s

f. [

[

ATTACHMENT A i'

J i 3 1

i j

l!uf

' Questions from'telecom held' october 16,:1987,~between CECO and NRR h

.. Questions specifically' request additional information:regarding.

August 18,fl98'l letter from CECO to NRR regarding the'High Density Spent-x

Fuel'RacksD TAC #62832

,.. ITEM 1.- Regarding Question #7.

... (a) Provide drawings of each of the< lifting and handling rigs.-

'I h

(b)l Provide'.statementito effect that,."all the lifting and handling;

. rigs are single failure proof."

l ITEM 2 - Regarding-Question #10; 3

1 1(a).. Provide draw'ings or; reference FSAR figures which can be read to.

1 define the transport path of the racks through'the reactor' buildings,to their~ installation.or storage locations (s).

l

~

(b)' Provide discussion'about'why Figure 10-2 shows two. load paths.

i

.(c), Identify obstacles.over which the' racks will have to be lifted'such that they.are more than two feet'above the refuel floor.

h

,(d)' For'these' obstacles, identify.how much clearance will be provided 3~ -

and what this ~ hei<;ht will be from the floor 'itself.

n 3

ITEM 3'

,RegardingQuestf.on'#13 l

(a): Ptovide' commitment to each item'of the requirements specified in R

NUREG-0612..

j i

i o

j i

l a