Text
..
Ccmm:nwrzith Edlasn 4
$j One First National Plaza, Chicago, Illinois v.
Address Reply to: Post Office Box 767 Chicago, Illinois 60090 0767 November 5, 1987 U.S. Nuclear. Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
LaSalle County Station Unit 2 Proposed Amendments to Technical Specification for Facility Operating License NPF-18 High Density Spent Fuel Racks NRC Docket No. 50-374 TAC No. 62832 References (a): Letter dated September 19, 1986 from C.M. Allen to H.R. Denton
~(b): Letter dated August 18, 1987 from '.:.M. Allen to US NRC Gentlemen:
Pursuant to 10 CFR 50.90, Commonwealth Edison proposed to amend Appendix A, Technical Specification. to Facility Operating License NPF-18 in reference (a). That proposal was amended by reference (b).
During review of that revised proposal your staff had additional questions discussed in a telecom held on October 16, 1987. These questions are enclosed in Attachment A.
Responses to these questions will be provided within 2 weeks.
Very truly yours, C. M. Allen Nuclear Licensing Administrator Cs Attachment cc: Region III Inspector - LSCS P. Shemanski - NRR M. C. Parker - IDNS
\\
b 3811K
\\ \\
8711100443 G71105 PDR ADOCK 05000374 P
r.
=
Wij -
T,
-g p
1 e
Qs
?;l-.
i
(
.,7 m
'J,
'd x
s 9
S. :
.f s
- f. [
[
- ATTACHMENT A i'
J i 3 1
i j
l!uf
' Questions from'telecom held' october 16,:1987,~between CECO and NRR h
.. Questions specifically' request additional information:regarding.
August 18,fl98'l letter from CECO to NRR regarding the'High Density Spent-x
- Fuel'RacksD TAC #62832
,.. ITEM 1.- Regarding Question #7.
... (a) Provide drawings of each of the< lifting and handling rigs.-
'I h
(b)l Provide'.statementito effect that,."all the lifting and handling;
. rigs are single failure proof."
l ITEM 2 - Regarding-Question #10; 3
1 1(a).. Provide draw'ings or; reference FSAR figures which can be read to.
1 define the transport path of the racks through'the reactor' buildings,to their~ installation.or storage locations (s).
- l
~
(b)' Provide discussion'about'why Figure 10-2 shows two. load paths.
- i
.(c), Identify obstacles.over which the' racks will have to be lifted'such that they.are more than two feet'above the refuel floor.
h
,(d)' For'these' obstacles, identify.how much clearance will be provided 3~ -
and what this ~ hei<;ht will be from the floor 'itself.
n 3
ITEM 3'
,RegardingQuestf.on'#13 l
(a): Ptovide' commitment to each item'of the requirements specified in R
j i
i o
j i
l a
3811x i