4-I :[ r,
i U,
a l
GPU Nucleer. Inc.
(:
U.S. Route #9 South NUCLEAR -
Post Office Box 388 Forked River, NJ 08731-0388 Te1609-971-4000
('
July 13, 1998 1940-98-20374 U. S. Nuclear Regulatory Commission Attentioni Document Control Desk-l.
Washington,DC 20555
Dear Sir:
L
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 l
IR 98-080:. Notification of Delayed Corrective Action
. The purpose of this correspondence is to infonn you that the corrective actions for Violation 98-080-B(1), Calculation for the Anchorage of the Containment Spray Heat Exchanger, submitted May 22,1998, have been delayed.
During the design verification process it was recognized that additional analysis was required. ' An outside contractor has been retained for this purpose. This analysis is now expected to be completed by September 30,1998. As stated _ in our original response to this Notice of Violation, it is expected that the completed analysis will show the existing anchorage as acceptable.
l.
l Should you have any questions, please contact Ms. Brenda DeMerchant, Oyster Creek Licensing l
Engineer, at 609-971-4642.
[
j Sincerely, 11a$dbi%
)
Michael B. Roche j'
Vice President and Director L
Oyster Creek
- [.
b MBR/BDeM cc:
NRC Administrator, Region 1
- NRC Project Manager
. NRC Senior Resident Inspector 9907210307 990713 PDR ADOCK 05000219s G