ML20236Q757
| ML20236Q757 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/17/1987 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20236Q759 | List: |
| References | |
| NUDOCS 8711200272 | |
| Download: ML20236Q757 (2) | |
See also: IR 05000498/1987058
Text
.
= - -
-
--
-
. _ - - _ .
,, ,
n)l >:
s
In Reply Refer To:
Dockets:
50-498/87-58
NOV I 7 lgg7
50-499/87-58
+
'
~
' Houston Lighting & Power Company
ATTN: .J. H. Goldberg,
' Group Vice' President,. Nuclear
P. O.' Box 1700
'
-Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by. Messrs..C. E. Johnson and .
.
.
.
D. L. Garrison of this office during the period September 7 through October 16,
1987, of activities authorized'by.NRC'0perating License NPF-71 and Construction
-
Permit CPPR-129, for.the South Texas Project, Units 1 and 2, respectively, and
'to the discussion lof'our findings with Mr. J.:T. Westermeier-and other members
of your staff at'.the' conclusion of the inspection.
Areas examined"durin'g the' inspection included site tours; piping. systems.
'
'
as-built verification; . reactor. pressure boundary piping; safety-related piping;
pipe supports and restraints; structural masonry construction; concrete..
' expansion anchors; safety-related components; and. pressurizer code safety valve
misalignment. ;Within these. areas, the. inspection consisted of selective-
-examination of procedures and representative' records, interviews with personnel,.
and observationsiby the NRC inspectors.
The inspection findings.are documented
.in the enclosed inspection' report.
.Within the scope of the inspection, no violations or deviations were identified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status.of these items is identified in.
paragraph 3 of,the enclosed report.
Should you have any questions'concerning this inspection, we will be pleased to
discuss them with you.
I
Sincerely,
Original Signed By
A. B. Deach
L
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
(see next page)
,
RIV:SRdff
PS/$
DRS/E
C PS) .
D:$f
.CEJohnson/1r-
DLGarrison
RGTaylo
GLConstable
JCarlan
. // //(p /87
/>//&/87
// //f/87
a/u/87
lt /t1/87
gO /
8711200272 871117
ADOCK 05000490
0
l
g
]
g
i
-_____
.
.
l
Houston Lighting & Power Company
-2-
.
Enclosure:
Appendix - NRC Inspection Report
50-498/87-58
50-498/87-58
cc w/ enclosure:
.
l
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Houston Lighting & Power Company
j
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P. O. Box 1700
Houston, Texas
77001
Central Power & Light Company
ATTN:
R. L. Range /R. P. Verret
'
l
'
P. O. Box 2121
Corpus Christi, Texas
78403
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P. O. Box 1771
San Antonio, Texas
78296
City of Austin
'
ATIN:
M. B. Lee /J. E. Malaski
P. O. Box 1088
78767-8814
Texas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
R. D. Martin, RA
- RRI-0PS
- Section Chief (DRP/D)
- RRI-CONST.
- MIS System
RPSB-DRSS
- Lisa Shea, RM/ALF
- RIV File
R. Bachmann, 0GC
- RSTS Operator
- P. Kadambi, NRR Project Manager
- H.
Bundy
- TSS
- R. Taylor
- R. Hall
- w/766
-
_ _ _ _ _ - - -