ML20236Q604
| ML20236Q604 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/16/1998 |
| From: | Collins E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20236Q606 | List: |
| References | |
| 50-313-98-05, 50-313-98-5, 50-368-98-05, 50-368-98-5, NUDOCS 9807200361 | |
| Download: ML20236Q604 (4) | |
See also: IR 05000313/1998005
Text
.. ..
._
_ _ _ _ _ _ . _ _
- _ - - . _ - _ _ _ _ _ _ _ _ - - - - _ _ _ _ _ _ - - _ _ _ _ _ _ - _ _ - - _ _ _ _- - _
. - - -
.
f""CW
UNITED STATES
g
$ '
. ~ , '. 't
NUCLEAR REGULATORY COMMISSION
f.
.
- ,
.
q
g
REGION IV
..
1
..
,
S'
8
611 RYAN PLAZA DRIVE, SulTE 400
. ~'
D9....8
'
Jll i 61998
C. Randy Hutchinson, Vice President
Operations
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333
Russellville, Arkansas 72801-0967
SUBJECT: NRC INSPECTION REPORT 50-313/98-05; 50-368/98-05
Dear Mr. Hutchinson:
From May 10 through June 20,1998, a routine resident inspection was conducted at your
Arkansas Nuclear One, Units 1 and 2, reactor L cilities. The enclosed report presents the scope
and results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Arkansas
Nuclear One facility was generally characterized by safety-conscious operations, sound
engineering and maintenance practices, and appropriate radiological controls.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
o
Elmo E. Collins, Chief
Project Branch C
Division of Reactor Projects
Docket Nos.: 50-313
50-368
License Nos.: DPR-51
NPF-6
Enclosure:
NRC Inspection Report
50-313/98-05;50-368/98-05
-
9807200361 980716
i
ADOCK 05000313
,
G
S
.
- - - .
_- -__- ___-__--___-________-_ _
- _ _ _ _ _ _ _ _ _ _ _ _ - _
_ - - - _ _ - _
d'
.
Entergy Operations, Inc.
-2-
cc w/ enclosure:
Executive Vice President
& Chief Operating Officer,
l
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice Preoident
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286
Manager, Washington Nielear Operations
,
ABB Combustion Engineering Nuclear -
'
Power
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
i
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
,
David D. Snellings, Jr., Director
Division of Radiation Control and
Emergency Management
i
!
4815 West Markham Street, Mail Slot 30
Little Rock, Arkansas 72205-3867
Manager
Rockville Nuclear Licensing
Framatome Technologies
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
!-
I
,
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _
.
.
Entergy Operations, Inc.
-3-
Jll I 61998
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director .
MIS System
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\_ANO\\AN805RP.KMK
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
! -
RIV:RI
RIV:RI
RIV: SRI
C:DP/C,
SCBurton
JFMelfi
KMKennedy
EE6d$iss
7/2/98
7/2/98
7/2/98
7/lkf98
OFFICIAL RECORD COPY
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
_-_ _ _ - _______ _ _ __
-_-_-_
e
.
Entergy Operations, Inc.
-3-
JUL I 61998
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (r
1 DESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distnb. by RIV:
Regional Administrator
Resident inspector
DRP Director
MIS System
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
l
DOCUMENT NAME: R:\\_ANO\\AN805RP.KMK
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
[
RIV:RI
l
RIV:RI
l
RIV: SRI
l
C:DFF/C,
l
l
SCBurton
JFMelfi
KMKennedy
EEC3filfis
7/2/98
7/2/98
7/2/98
7/\\ b98
OFFICIAL RECORD COPY
Ca002l
1
_ - - - - - - - - - -