ML20236N641
| ML20236N641 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 11/12/1987 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20236N642 | List: |
| References | |
| NUDOCS 8711160263 | |
| Download: ML20236N641 (2) | |
See also: IR 05000267/1987028
Text
,
_.
_-_
. _ _ - _ - -
_ _ _ _ _ _
- - _ _ - _ .
_ _ _ _ _ _ _ _ - .
,
1
(
I
~'
.
i
'
NOV i _
mi
t
In Reply Refer To:
'
Docket:
50-267/87-28
,
Public Service Company.of Colorado
ATTN:
Robert.-0. Williams', Jr.
4
Vice President, Nuclear Operations
_
";
2420 W. 26th Avenue, Suite 15c
Denver, Colorado
60211
-l
l
Gentlemen:
j
.
.
-t
This' refers'to.the' inspection crmducted by Messrs. J. B. Baird and W. L. Fisher
of this office during .the period October 7-8,11987, of activities authorized by
j
NRC Operating Licente DPR-34, for the Fort St. Vrain Nuclear Generating Station,
'q
and to the discussion of our. findings with you and other members-of your staff
at the conclusion of the inspection.
1
Areas examined during'the inspection included implementation of the emergency
!
plan and procedures in response to the fire of October 2, 1987.
Within these
areas, the -inspection. consisted of selective examination of procedures and
,
representative records, interviews with personnel, and observations by the NRC
i
inspectors.
The inspection findings are documented in the enclosed inspection.
report.
The operational aspects of your response to this event are addressed in the NRC;
Augmented Inspection Team (AIT) report (50-267/87-26).
The AIT and this
inspection verified that adequate steps were taken in response to the fire.
However, during this inspection,:it was found that certain of your activities
appeared to deviate from a commitment made to the NRC.
This item and references
I
to the commitment are identified in the enclosed Notice of Deviation.
You are
requested to. respond to this deviation in writing.
Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office o'f Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
]
Should you have any questions concerning this inspection, we will be pleased to
,
discuss them with you.
Sincerely,
.
Original Signed Ey
g 11 h$63 h 00267
cW
L. J. Callan, Director
j
G
Division of Reactor Projects
1
Enclosures:
(see next pagp)
RIV:TA k
C:NMEPBb
D:0
3
EO [
C:PS/B
0:
JBBaird/de
WLFisher
RLBf art
DAPowers TFWesterman
LJCallan
q
U / T/87
n/5/87
0/of/87
a /1/87 \\f /10 /87
(I llO/87
h\\
[# $l
- _ _ _ - _ - _ _ _ - _ _ -
_
__ _ _ _ _
_- -
c.
- l
.
.
..
)
,
!
Public Service Company of Colorado
-2-
,
t
- Enclosures:
'
1.
Appendix A - Notice'of, Deviation
2.
Appendix B - NRC Inspection Report
50-267/87-28
.
'
cc w/ enclosures:
Manager, Nuclear Production Division
Fort St. Vrain Nuclear Station
16805 WCR 19 -
Platteville, Colorado
80651
P. Tom 1inson, Manager, Qu'ality
Assurance Division
(same. address)
. Dr. F. Shoemaker, Education Specialist
FEMA Region 8.
~
j
Denver Federal Center Bldg. 710
-
Box 25267 .
. - Denver, Colorado 80225-0267
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bcc to DMB (IE35)
,
bec distrib. by RIV:
- '
~ *RPS/B
- RRI
R. D. Martin, RA
- Section Chief (RPB/B)
~* Project Engineer, RPS/B
RPSB-DRSS
- L.
Shea, RM/ALF
- MIS System
- RSTS Operator
- K.'Heitner,NRRProjectManager. *RIV File
'*R. Hall
NMEPB
- Inspector (s)-
- W. L. Fisher
R. L. Bangart
D. B. Matthews, NRR
- R. E. Hall
D. A. Powers
J. Gilliland
G. Sanborn
'..
- w/766-
'
'
.
l
.
h________
_ _ _ _ . . _