Forwards Safety Insp Rept 50-483/87-15 on 870504-0722 & Notice of Violation.Two Deficiencies in 10CFR50.49 Program Noted
ML20236N614
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/06/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20236N617 List:
References
RTR-NUREG-0588, RTR-NUREG-588, RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8708120030
Download: ML20236N614 (2)


See also: IR 05000483/1987015

Text

___ _

.

.

AUG 6 1987

Docket No. 50-483

Union Electric Company

ATTN: Mr, Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

Gentlemen:

This refers to the special safety inspection conducted by Mr. Anil S. Gautam

and other NRC representatives of this office on May 4 through July 22, 1987,

of activities at the Callaway Nuclear Power Plant authorized by NRC License

No. NPF-30 and to the discussion of our findings with Mr. D. E. Shafer at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, one of your activities appeared to be in violation of

NRC requirements, as described in the enclosed Notice. The inspection verified

that action had been taken to correct the identified violation and to prevent

recurrence. Our understanding of your corrective actions are described in

Paragraph 2a of the enclosed inspection report. Consequently no reply to the

violation is required and we have no further questions regarding this matter at

this time.

Although the inspection determined that you have implemented a program to meet

the requirements of 10 CFR 50.49, two significant deficiencies in the program

implementation were observed. These findings are in regard to the

environmental qualification of the Marathon and Kulka terminal blocks, and are

classified as Potentially Enforceable / Unresolved Items. An ongoing NRC review

is being performed to evaluate these findings in regard to possible future

enforcement action. Further responses to these items are required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

s

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-11.

1

8100030 870006

O ADOCK 05000403

PDR

_ - _ _ _

f l{

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

Union Electric Company 2 AUG 6 1987

We will be glad to discuss any questions you have concerning this inspection. >

Sincerely,

.

Original Sign d by J. J. !!arria .

J. J. Harrison, Chief

Engineering Branch

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-483/67015(DRS)

cc w/ enclosures:

J. D. Blosser, Plant

Manager

A. P. Neuhalfen, Manager Quality

Assurance

Gary L. Randolph, General Manager,

Nuclear Operations -

DCS/RSB (RIDS) ,

Licensing Fee Management Branch

Resident Inspector, RIII

T. Alexion, Licensing Project

Manager

U. Potapovs, NRR

V. Nicolette, Sandia

J. Farringer, INEL

M. Kopp, RIII

Region IV ,

Resident Inspector, Wolf Creek

K. Drey

Chris R. Rogers, P.E.

Utility Division, Misscuri

Public Service Commission

SNUPPS

...

RIII '

RIII RIII R g

Afer

inds

Rh

Gard 6er ris

Gautam/abl H 1

6 *(pnU

?5g7  % 4 41 kJd' O