ML20236N312

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-457/87-40 on 871028.No Violations Noted
ML20236N312
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 11/12/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20236N317 List:
References
NUDOCS 8711160111
Download: ML20236N312 (2)


See also: IR 05000457/1987040

Text

_-_

.

.

f-

i

NOV 1 2 1987

r

Docket No. 50-457

Commonwealth Edison Company

ATTH: Mr. Cordell Reed

Senior Vice Presideist

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. K. D. Ward of

this office on October 28, 1987, of activities at the Braidwood Station, Unit

2, authorized by NRC Construction Permit No. CPPR-133 and to the discussion of

our findings with Mr. C. Barrett and others of your staff at the conclusion of

!

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures'and representative records, observations, and

(

interviews with personnel.

No viciations of NRC requirements were identified during the course of this

'

inspection.

1

In accordance with 10 CFR 2.790 of the Conmission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public ' v ment Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

i

vig.ia sg.cu ut

J..

J., nuuma

j

i

J. J. Harrison, Chief

!

Engineering Branch

Enclosure:

Inspection Report

No. 50-87040(DRS)

See Attach _ed Distribution

f

+'

RIII

RIII

RIII

RII

obYhY

o8W8

ard/abl

Danielson

nds

rison

ydp

n/n.)y]

u-n U

8711160111 871112

g

gDR

ADOCK 050

7

jg/

i

.. .

.

- _ -

l

- _ __ _ _-_____ __

. _ _ _ _ _ .

..

.

NOV 121987

Commonwealth Edison Company

2

i

Distribution:

cc w/ enclosure:

l

T. J. Maiman, Vice President,

l

PWR Operations

';

'

D. Butterfield, Nuclear

. Licensing Manager

M. Wallace, Manager of Projects

l

D. Shamblin, Project Manager

l

W. Vahle, Construction

l

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

DCD/DCB (RIDS)pervisor

Assurance Su

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

G. Berry, 0GC

J. Stevens, NRR

The Honorable A. Dixon Ca11ihan, ASLB

The Honorable Richard F. Cole, A3LB

The Honorable Ivan W. Smith, A k B

-

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

l

l

_ _ ____.