Forwards Info Updating Licensee Implementation Dates for Multiple Plant Action Items Found on Sys Issues Mgt Sys List,Per NRC Mar 1987 Request
ML20236N049
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/04/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8708110353
Download: ML20236N049 (14)


Text

- - _

.., ; ) '.

. TENNESSEE. VALLEY AUTHORITY CHATTANOOG A. TENNESSEE 37401 SN 157B Lookout Place E AU6 041987

.U.S. Nuclear Regulatory Commission

. ATTN: Document Control Desk

Washington, D.C. 20555 Gentlemen:

'In the Matter of ) Docket Nos. 50-327 Tennessee' Valley Authority ) 50-328 SEQUOYAH. NUCLEAR PLANT (SQN) - UPDATE Ob' THE SAFETY ISSUES MANAGEMENT SYSTEM (SIMS)

The enclosed information provides updated licensee implementation dates .

for multiple plant action items found on NRC's SIMS list. Enclosure 1 {

contains unit 1.information, and enclosure 2 contains unit 2

, ~information. This information was informally requested by NRC through conversations that occurred in March 1987.

'please note that, for those SIMS items in the enclosure that are not

' complete, the date is either a date that is a previous TVA commitment or the date is a projected date for completion. The projected dates are not considered as new commitment dates. TVA will keep NRC informed of changes to these dates in order to keep your database up to date. '

Very truly yours, TENNESSEE V LEY AUTHORITY R. ridley, irector Nuclear Safe y and Licensing Enclosures cc: See page 2 1

8708110353 DR 870B04 O ADOCK 05000327 PDR

\

p\

An Equal Opportunity Employer

U.S. Nuclear Regulatory Commission A JG 041987 cc (Enclosures):

Mr. G. G. Zech, Assistant Director for Inspection Programs Office of Special Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NK, Suite 2900 Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistaat Director for Projects Division of TVA Projects Office of Special Frojects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

ENCLOSURE 1 This enclosure contains those unit 1 items found on NRC's SIMS computer listing, which NRC informally provided to SQN in March 1987. NRC requested that SQN_ verify and update, as required, the licensee implementation dates and status field for each of these SIMS items. Dates with an asterisk (*)

indicate when presently installed equipment will meet the requirements as committed to under our Regulatory Guide 1.97 program. Provided below is a definition of each status letter used in the enclosure as defined by NRC.

C - Completion of implementation as indicated by the licensee.

L - An estimate / projection made by the licensee at the time the safety evaluation is closed and updated as needed before completing implementation. (Note: Based on discussions with 4 NRC, all future dates to which SQN has previously made a j commitment have been given this status.)  !

R - A rough estimate that will be entered by the project manager based on a template / historical experience in absence of better information. (Note: Based on discussions with NRC, all future dates to which SQN has not made a. commitment will be given this status.)

l l

s v

______.M

f' P, _,

,~2-MULTIPLE PLANT LICENSEE

' ACTION- IMPLEMENTATION

, -TAC NO. (MPA) NO. TITLE DATE STATUS

'M51133 A-17 "SEQUOYAH 1 - INSTRUMENTATION TO 1/5/90 L FOLLOW THE COURSE OF AN ACCIDENT (RG I.97)"

M55740 A-18 "SEQUOYAH 1 - TECH. SPECS. . 11/23/84 C

[, 'AFFECTED BY.50.72 AND 50.73 (GL 83-43)"'

M59141' A-20 "SEQUOYAH 1 CFR 50.62 7/21/89 L OPERATING REACTOR REVIEWS"

-M59983 E A--21 - "SEQUOYAH 1 - 10CFR50.61 4/20/87 C PRESSURIZED. THERMAL SHOCK RULE 4

, REQUIREMENTS, PHASE 1" a M12173 'B-16 "SEQUOYAH 1 - EMERGENCY PLAN 8/5/80 C REVIEW" i

M42535 B-60 "SEQUOYAH.1 - ENVIRONMENTAL. 12/27/87 L QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT (80-CLI-21)"

M43950 B-63 "SEQUOYAH 1 - STATION BLACKOUT 11/19/81 C PROCEDURES & TRAINING" M51789 B-66 "SEQUOYAH 1 - NATURAL CIRCULATION 10/4/84 C C00LDOWN" M46857' ~ B-69 "SEQUOYAH 1 - PWR MSLB WITH 5/11/82 'C

-CONTINUED FEEDWATER ADDITION" M49758 B-72 "SEQUOYAH 1 'NUREG 0737 TECH 1/7/83 C SPECS (GENERIC-LETTER 82-16 82-16 OR 83-02)'"

M52800 .B-76 "SEQUOYAH 1 - ITEM 1.1 - POST 5/21/85 C TRIP REVIEW PROGRAM DESCRIPTION AND PROCEDURES"

^ M52881 B-77 "SEQUOYAH 1 - ITEM 2.1 - 3/1/87 C EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS"

.M52962 B-78 "SEQUOYAH 1 - ITEMS 3.1.1 & 3.1.2 10/30/87 R

- POST MAINTENANCE TESTING PROCEDURES / VENDOR" l

l 1

L______.______.__._m_ _ . . _ . , _ . _ _ ,

f "

-l

. 1 .

I MULTIPLE ,

PLANT LICENSEE l ACTION IMPLEMENTATION I TAC NO. (MPA) NO. TITLE DATE ' STATUS )

JM53043 :B-79' "SEQUOYAH 1-ITEM 3.1.3 11/7/83 C

-POST-MAINTENANCE TESTING-CHANGES TO TECH" I

.M53098 -B-80 "SEQUOYAH ,l' -- REACTOR TRIP. SYSTEM 3/31/88 R RELIABILITY - VENDOR RELATED MODIFICATIONS" l M53151 B-81 "SEQUOYAH 1 - ITEMS 4.2.1 & 4.2.2 6/27/86 C _

- PREVENTATIVE MAINT PROGRAM FOR REACTOR' TRIP BREAKERS" M53195' B-82 ' "SEQUOYAH 1 - ITEM 4.3 - 8/26/86 C AUTM0ATIC ACTUATION OF SHUNT

. TRIP ATTACHMENT FOR W AND B & W" M54569 B-83 "SEQUOYAH 1 - TECHNICAL- 1/14/88 R SPECIFICATIONS COVERED BY l GENERIC LETTERS 83-36, 83-37 FOR" M53633 -B-85 "SEQUOYAH 1 - ITEM 1.2 - POST 8/31/87 R i TRIP REVIEW-DATA AND INFORMATION CAPABILITY" M53716 : B-86 -"SEQUOYAH 1 - ITEM 2.2 - 7/29/88 R EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR" M53799 'B-87 "SEQUOYAH 1 - ITEMS 3.2.1 & 3.2.2 10/31/89- R

- POST-MAINT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS - ALL"

.M53882 B-88 "SEQUOYAH l'- ITEM 3.2.3 - 3/23/87 C POST-MAINTENANCE TESTING

-CHANGES TO TECH. SPEC. - ALL SR"

.M53938 B-89 "SEQUOYAH 1 - ITEMS 4.2.3 & 5/22/86 C

.4.2.4-PREVENTATIVE MAINTENANCE PROGRAM FOR RX TRIP BREAKERS" M55377. B-90 "SEQUOYAH 1 - ITEM 4.3(TS) - 8/31/87 R AUTOMATIC ACTUATION OF SHUNT TRIP FOR W AND B&W PLANTS - TECH" M54109 B-92 "SEQUOYAH 1 - ITEM 4.5.1 - 5/14/86 C REACTOR SYSTEM FUNCTIONAL l TESTING - DIVERSE TRIP FEATURES" i l

-_w___u.--

MULTIPLE PLANT LICENSEE ACTION IMPLEMENTATION TAC NO. (MPA) NO. TITLE __

DATE STATUS M54026 B-93 "SEQUOYAH 1 - ITEMS 4.5.2 & 4.5.3 12/30/88 R

- REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVES & TEST" l

M47130 C-10 7/1/92 "SEQUOYAH 1 - CONTROL OF HEAVY R LOADS AT NUCLEAR POWER PLANTS (NUREG 0612)"

M43675 C-14 "SEQUOYAH 1 - SEISMIC 3/1/82 C QUALIFICATION OF THE AUXILIARY FEEDWATER SYSTEM" M52271 C-15 "SEQUOYAH 1 - CONTROL OF HEAVY 3/26/85 C LOADS - PHASE II (FOLLOWUP OF MPA#C-10)"

M58089 C-16 "SEQUOYAH 1 - STEAM GENERATOR 12/1/87 R GENERIC REVIEW CONCERNING STEAM GENERATORS (GL 85-02)"

M55903 D-19 "SEQUOYAH 1 - DIESEL GENERATOR 3/23/87 C RELIABILITY TECH. SPECS. (GL 84-15)"

i M44058 F- 01 "SEQUOYAH 1 - NUREG-0737 I.A.1.1 8/26/81 C STA LONG TERM REQUIREMENTS" M44200 F-03 "SEQUOYAH 1 - NUREG-0737 7/25/80 C I.A.2.1.4, UPGRADING OF R0 AND SR0 TRAINING" M44271 F-04 "SEQUOYAH 1 - NUREG-0737 10/4/84 C I.C.1.2.A, INADEQUATE CORE COOLING GUIDELINES" M44341 F-05 "SEQUOYAH 1 - PROCEDURES 1/13/86 C GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)"

M47254 F-06' "SEQUOYAH 1 - FEEDBACK OF 7/28/81 C OPERATING EXPERIENCE (AP I.C.5)"

M51203 F-08 "SEQUOYAH 1 - I.D.1.1 - DETAILED 6/9/83 C CONTROL ROOM DESIGN REVIEW PROGRAM PLAN F-08" l

l i

e

MULTIPLE PLANT LICENSEE ACTION- IMPLEMENTATION TAC NO. (MPA) NO. TITLE DATE STATUS M51283 F "SEQUOYAH 1 - I.D.2. SAFETY 9/30/85 C i PARAMETER DISPLAY SYSTEM" '

M44408 F-10 "SEQUOYAH 1 - NUREG-0737 II.B.1, 1/14/88 R RCS HIGH POINT VENTS"  !

M44479 F-12 "SEQUOYAH 1 - NUREG-0737 3/24/84 C 1 II.B.3.2, POST ACCIDENT SAMPLING J MODIFICATIONS" M44550 F-13 "SEQUOYAH 1 - NUREG-0737 5/5/81 C II.B.4.1, TRAINING FOR [

MITICATING CORE" M44621 F-14 "SEQUOYAH 1 - RV AND SV TESTING" 12/27/87 L M44653 F-15 "SEQUOYAH 1 - NUREG-0737 4/5/82 C II.E.1.1, AFW SYSTEM EVALUATION" M44732 F-17 "SEQUOYAH 1 - NUREG-0737 12/9/80 C II.E.1'.2.2, AFW SAFETY GRADE l

FLOW INDICATION" M44818 F-18 "SEQUOYAH 1 - NUREG-0737 12/10/80 C II.E.4.1.2, DEDICATED HYDROGEN PENETRATIONS" M44889 F-19 "SEQUOYAH 1 - NUREG-0737 5/26/81 C II.E.4.2, CONTAINMENT ISOLATION DEPENDABILITY" M44960 F-20 "SEQUOYAH 1 - NUREG-0737 1/14/88 R II.F.1.1, NOBLE GAS MONITOR" M45031 F-21 "SEQUOYAF ' - NUREG-0737 1/14/86 C II.F.1.2, 10 DINE / PARTICULATE SAMPLING"

, M45102 F-22 "SEQUOYAH 1 - NUREG-0737 1/5/90* L i

II.F.1.3, CONTAINMENT HIGH RANGE MONITOR" L M47638 F-23 "SEQUOYAH 1 - NUREG 0737 ITEM II 1/5/90* L F1.4 CONTAINMENT PRESSURE INSTRUMENT" M47709 F-24 "SEQUOYAH 1 - NUREG 0737 ITEM II 1/5/90* L F1.5 CONTAINMENT WATER LEVEL MONITOR" h ____mm___u______m__..__________ _ _ _ _ _ _ _ _

n MULTIPLE PLANT LICENSEE __

ACTION IMPLEMENTATION TAC NO. (MPA) NO. TITLE ___DATE STATUS M47780 F-25 "SEQUOYAH 1 - NUREG 0737 ITEM II 1/5/90* L F1.6 CONTAINMENT HYDROGEN MONITOR" M45172 F-26 "SEQUOYAH 1 - NUREG-0737 7/21/89* L II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION" M46902 F-30 "SEQUOYAH 1 - II K2.13 THERMAL 2/16/82 C MECHANICAL REPORT" M47820 F-33 "SEQUOYAH 1 - NUREG 0737 ITEM II 12/18/81 C K2.17 POTENTIAL FOR VOIDING IN RCS" M45250 F-36 "SEQUOYAH 1 - NUREG-0737 4/3/81 C II.K.3.1, AUTO PORV ISOLATION" M45296 F-37 "SEQUOYAH 1 - NUREG-0737 4/3/81 C II.K.3.2, REPORT ON PORV FAILURES" M45382 F-38 "SEQUOYAH 1 - NUREG-0737 5/81 C II.K.3.3, REPORT ON RV/SV FAILURES" M45413 F-39 "SEQUOYAH 1 - NUREG-0737 11/30/87 R II.K,3.5, AUTO TRIP OF RCPS" M45462 F-40 "SEQUOYAH 1 - NUREG-0737 7/18/80 C II.K.3.9, PID CONTROLLER" M45492 F-41 "SEQUOYAH 1 - NUREG-0737 5/13/81 C II.K.3.10, ANTICIPATORY TRIP MODIFICATIONS" M45522 F-42 "SEQUOYAH 1 - NUREG-0737 7/18/80 C II.K.3.12. ANTICIPATORY TRIP ON TURBINE TRIP" M45865 F-57 "SEQUOYAH 1 - NUREG-0737 9/25/85 C II.K.3.30, SB LOCA OUTLINE" M48204 F-58 "SEQUOYAH 1 - NUREG 0737 II.K.3.31 7/30/86 C COMPLIANCE WITH 10 CFR 50.46" M45984 F-63 "SEQUOYAH 1 - NUREC-0737 9/30/85 C III.A.l.2, TECHNICAL SUPPORT CENTER"

1'

...- 2 g ' MULTIPLE

. PLANT: LICENSEE ACTION IMPLEMENTATION TAC NO. (MPA) NO. TITLE DATE STATUS' M46055 F-64~ "SEQUOYAH 1 -'NUREG-0737. 3/15/83 C m

'III.A.1.2, OPERATIONAL SUPPORT CENTEx"'

M46127 :F-65 "SEQUOYAH 1 - NUREG-0737 3/15/83 C l,

III.A.1.2, EMERGENCY OPERATIONS FACILITY"

' M'46199 'F-66 "SEQUOYAH'1 III.A.2 NUCLEAR 6/2/81 C ',

DATA LINK DATA" '

'M46271 F-67 "SEQUOYAH:1 - III.A.2.1 EMERGENCY .12/30/81 C. i PLAN UPGRADE TO MEET RULE MEET l

-RULE"~

M46343 :F-68 '"SEQUOYAH 1 - NUREG-0737 8/28/84' C III.A.2.2, METEOROLOGICAL DATA-UPGRADE" M46414 -F-69 "SEQUOYAH 1 - NUREG-0737 1/25/80 C III.D.3.3, INPLANT RADIATION MONITORING" M46483' F-70 "SEQUOYAH 1 - NUREG-0737 1/13/81 C

'III.D.3.4, CONTROL ROOM )

HABITABILITY" M56165L F-71 "SEQUOYAH l'- I.D.1.2 DETAILED 11/26/86 C CONTROL ROOM DESIGN REVIEW

SUMMARY

REPORT - F-71" M49634 G-01 "SEQUOYAH 1.- REACTOR COOLANT 11/30/87 R PUMP TRIP" LLM:EBD 1486h i

A-__.__--___-_____ _ . _ _ . _ . _ . , ,

l

~

ENCLOSURE 2 This enclosure contains those unit 2 items found on NRC's SIMS computer listing, which NRC informally provided to SQN in March 1987. hPC requested that SQN verify and update,'as required, the licensee implementation dates and status field for each of these SIMS items. Dates with an asterisk (*)

indicate when presently installed equipment will meet the requirements as committed to under our Regulatory Guide 1.97 program. Provided below is a definition of each status letter used in the enclosure as defined by NRC. l C - Completion of implementation as indicated by the licensee.

L - An estimate / projection made by the licensee at the time the safety evaluation is closed and updated as needed before completing implementation. (Note: Based on discussions with NRC, all future dates to which SQN has previously made a commitment have been given this status.)

R - A rough estimate that will be entered by the project manager based on a template / historical experience in absence of better information. (Note: Based on discussions with NRC, all future dates to which SQN has not made a commitment will be given this status.)

l i

MULTIPLE PLANT LICENSEE ACTION IMPLEMENTATION TAC NO. (MPA) NO. TITLE DATE STATUS M51134 'A-17 "SEQUOYAH 2 - INSTRUMENTATION TO 1/5/90 L FOLLOW THE COURSE OF AN ACCIDENT (RG 1.97)"

M55741 A-18 "SEQUOYAH 2 - TECH. SPECS. 4/20/84 C AFFECTED BY 50.72 AND 50.73 (GL 83-43)"

M59142 A-20 "SEQUOYAH 2 - 10 CFR 50.62 1/5/90 L OPERATING REACTOR REVIEWS" M59984' A-21 "SEQUOYAH 2 - 10CFR50.61 4/20/87 C PRESSURIZED THERMAL SHOCK RULE REQUIREMENTS, PHASE 1" M51790 B-66 "SEQUOYAH 2 - NATURAL CIRCULATION 10/4/84 C C00LDOWN" M52801 B-76 "SEQUOYAH 2 - ITEM 1.1 - POST 5/21/85 C TRIP REVIEW PROGRAM DESCRIPTION AND PROCEDURES"

'M52882 B-77 "SEQUOYAH 2 - ITEM 2.1 - 3/1/87 C EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS" M52963 B-78 "SEQUOYAH 2 - ITEMS 3.1.1 & 3.1.2 10/30/87 R

- POST MAINTENANCE TESTING PROCEDURES / VENDOR" M53044 B-79 "SEQUOYAH 2-ITEM 3.1.3 11/7/83 C

-POST-MAINTENANCE TESTING-CHANGES TO TECH" M53099 B-80 "SEQUOYAH 2 - REACTOR TRIP SYSTEM 3/31/88 R

. RELIABILITY - VENDOR RELATED MODIFICATIONS" M53152 'B-81 "SEQUOYAH 2 - ITEMS 4.2.1 & 4.2.2 6/27/86 C I

- PREVENTATIVE MAINT PROGRAM FOR REACTOR TRIP BREAKERS "

. i r

i U-1 ^'

l MULTIPLE

. PLANT LICENSEE iACTION IMPLEMENTATION TAC NO. '{MPA)~NO. TITLE- DATE STATUS M53196 B-82 "SEQUOYAH 2 - ITEM 4.3 - 8/26/86 C AUT0AMTIC ACTUATION OF SHUNT

.., TRIP ATTACHMENT FOR W AND B & W" M54570 B-83 "SEQUOYAH 2 - TECHNICAL ~ 1/14/88- R SPECIFICATIONS COVERED BY.

GENERIC LETTERS 83-36, 83-37 FOR"

.M536341 'B-85 "SEQUOYAH 2 - ITEM'1.2 POST 8/31/87 R TRIP REVIEW-DATA AND INFORMATION CAPABILITY" l

M53717 B-86 "SEQUAYAH 2 - ITEM 2.21- 7/29/88 R.

l EQUIPMENT. CLASSIFICATION AND VENDORiINTERFACE -!ALL SR"

~

M53800 B-87. "SEQUOYAH 2- ITEMS 3.2.1 & 3.2.2 10/31/89 R

- POST-MAINT TESTING PROCEDURES

! AND VENDOR ~ RECOMMENDATIONS - ALL" M53883 ~ B-88 "SEQUOYAH 2 - ITEM 3.2.3 - 3/23/87 C POST-MAIN *ENANCE TESTING.

-CHANGES TO TECH.' SPEC. - ALL SR" M53939 B-89 ."SEQUOYAH 2 -~ ITEMS 4.2.3 & 5/22/86 C 4.2.4-PREVENTATIVE MAINTENANCE-

-PROGRAM FOR RX TRIP BREAKERS "

M55378 B-90 "SEQUOYAH 2 - ITEM 4.3(TS) - 8/31/87 R AUTOMATIC ACTUATION.0F SHUNT TRIP FOR.W-AND B&W PLANTS - TECH" M54110 B-92 "SEQUOYAH 2 - ITEM 4.5.1 - 5/14/86 .c REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE TRIP FEATURES" M54027 B-93 "SEQUOYAH 2 - ITEMS 4.5.2 & 4.5.3 12/30/88 R-

- REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVES & TEST" M51442 C-10 "SEQUOYAH 2 - HEAVY LOADS"' 7/1/92 R

'M52272 0-15 "SEQUOYAH 2 - CONTROL OF HEAVY 3/26/85 C LOADS - PHASE II (FOLLOWUP 0F MPA#C-10)"

MULTIPLE PLANT LICENSEE ACTION IMPLEMENTATION TAC NO. (MPA) NO. TITLE DATE STATUS M58090 C-16 "SEQUOYAH 2 - STEAM GENERATOR 12/1/87 R GENERIC REVIEW CONCERNING STEAM >

GENERATORS (GL 85-02)"

I M55904 D-19 "SEQUOYAH 2 - DIESEL GENERATOR 3/23/87 C RELIABILITY TECH. SPECS. (GL 84-15)"

M51447 F-04 "SEQUOYAH 2 - INADEQUATE CORE 10/4/84 C COOLING GUIDELINES (I.C.1.2.A)"

M51448 F-05 "SEQUOYAH 2 - PROCEDURES 1/13/86 C GENERATION PACKAGE REVIEW (N" REG 0737 SUPP/1)"

. M51456 F-06 "SEQUOYAH 2 - FEEDBACK OF 7/28/81 C OPERATING EXPERIENCE (I.C.5)"

M51204 F-08 "SEQUOYAH 2 - I.D.1.2 - DETAILED 6/9/83 C CONTROL ROOM DESIGN REVIEW PROGRAM PLAN F-08" M51284 F-09 "SEQUOYAH 2 - I.D.2. SAFETY 10/31/85 C PARAMETER DISPLAY SYSTEM" M51449 F-10 "SEQUOYAH 2 - RCS HIGH POINT 1/14/88 R VENTS (II.B.1)"

M51451 F-14 "SEQUOYAH 2 - RV AND SV TESTING" 7/17/88 L M51452 F-21 "SEQUOYAH 2 - IODINE / PARTICULATE 1/14/86 C (II.F.1.2)"

M49458 F-26 "SEQUOYAH 2 - INSTRUMENTS FOR 1/5/90* L DETECTION ON INADEQUATE CORE COOLING (II.F.2)"

M54984. F-30 "SEQUOYAH 2, II.K.2.13, THERMAL 2/16/82 C MECHANICAL REPORT" M51444 F-33 "SEQUOYAH 2 - POTENTIAL FOR 12/18/81 C VOIDING IN RCS (II.K.2.17)"

M49114 F-39 "SEQUOYAH 2 - NUREG-0737 11/30/87 R II.K.3.5, AUTO TRIP OF RCPS" mm-.-__-___.-.__._mm.__

MULTIPLE PLANT LICENSEE ACTION IMPLEMENTATION TAC NO. (MPA) NO. TITLE DATE STATUS M51453 F-57 "SEQUOYAH 2 - SB LOCA OUTLINE 9/25/85 C (II.K.3.30)"

M48205 F-58 "SEQUOYAH 2 - NUREG 0737 II.K.3.31 7/30/86 C COMPLIANCE WITH 10 CFR 50.46" M51445 F-58 "SEQUOYAH 2 - COMPLIANCE WITH 7/30/86 C 10CFR 50.46 (II.K.3.31)"

M51454 F-63 "SEQUOYAH 2 - TECHNICAL SUPPORT 10/31/85 C CENTER (III.A.1.2)"

M51455 F-67 "SEQUOYAH 2 - EMERGENCY PLAN 12/30/81 C UPGRAGE (III.A.2.1)"

M56166 F-71 "SEQUOYAH 2 - I.D.1.2 DETAILED 11/26/86 C CONTROL ROOM DESIGN REVIEW

SUMMARY

REPORT - F-71" M51528 G-01 "SEQUOYAH 2 - REACTOR COOLANT 11/30/87 R PUMP TRIP (II.K.3.5)"