ML20236M803
| ML20236M803 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 07/31/1987 |
| From: | Kintner L Office of Nuclear Reactor Regulation |
| To: | Kingsley O SYSTEM ENERGY RESOURCES, INC. |
| References | |
| GL-83-28, TAC-53986, NUDOCS 8708110241 | |
| Download: ML20236M803 (2) | |
Text
_
July 31,'1987 Docket No. 50-416 DISTRIBUTION Docket @em ACRS(10)
NRC#& Local:PDRs DLasher PD22 Rdg TConlon Mr. Oliver D. Kingsley, Jr.
SVarga JMauck i
Vice President, Nuclear Operations Glainas System Energy Resources, Inc.
0GC-Beth P.O. Box 23054 DMiller Jackson, Mississippi 39205 LKintner EJordan
Dear Mr. Kingsley:
JPartlow l
SUBJECT:
GRAND GULF NUCLEAR STATION (GGNS), UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 83-28, POSITION 4.5, REACTOR TRIP SYSTEM RELIABILITY (TAC.NO.-53986)
By letter dated September 11, 1984, the licensee (Mississippi Power & Light Company prior to December 20, 1986, Systems Energy Resources, Inc. on and after that date) provided information regarding the backup scram system for GGNS Unit I pursuant to Position 4.5 of Generic letter (GL) 83-28.
The NRC staff is reviewing the infonnation and finds that additional information is needed to complete its review. The September 11, 1984 submittal stated that on-line functional testing of the backup scram valves, as recommended by GL 83-28, Position 4.5, is not feasible because on-line testing would result in a reactor scram. The staff concludes that modifications to the system to allow on-line testing are not required. However, the staff further concludes that testing of the backup scram valves, including initiating circuitry, during each refueling outage, is appropriate. You are requested to describe, within 30 days of the receipt of this letter, procedures for testing the operability of the backup scram valves that will be performed off-line at each refueling outage.
The reporting and/or recordkeeping requirements contained in this letter l
l affect fewer than 10 respondents; therefore, OMB clearance is not required j
under P.L.96-511.
I Sincerely, Lester L. Kintner, Project Manager Project Directorate 11-2 l
Division of Reactor Projects-I/II I
l cc: See next page f.PD322
- M ('
l JMa[u'$SB Li.W SC I D:PD22 DF er LKintner ck LRubenstein 7/p 87 7/g}/87 ZAS/87 7/ /87 8708110241 870731 PDR ADOCK 05000416 P
pyn j
1
___ _C
_________________________u-
y, uJ Mr. Oliver D. Kingsley, Jr.
System Energy Resources, Inc.
Grand Gul' Nuclear Station (GGNS) cC*
Mr. Ted H. Cloninger Vice President, Nuclear Engineering Mr. C. R. Hutchinson
}
and Support GGNS General Manager System Energy Resources, Inc.
System Energy Resources, Inc.
j Post Office Box 23054 Post Office Box 756
{
Port Gibson, Mississippi 39150 Jackson, Mississippi 39205 i
Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, Steen ano Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Nicholas S. Reynolds, Esquire Baton Rouge, Louisiana 70804 l
Bishop, Liberman, Cook, Purcell and Reynolds Office of the Governor 120017th Street, N.W.
State of Mississippi Washington, D. C.
20036 Jackson, Mississippi 39201 Mr. Ralph T. Lally Attorney General Manager of Quality Assurance Gartin Building Middle South Utilities System Jackson, Mississippi 39205 Services, Inc.
P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mr. John G. Cesare Mississippi Department of Natural desources Director, Nuclear Licensing and Safety Bureau of Pollution Control System Energy Resources, Inc.
P.O. Box 23054 Post Office Box 10385 Jackson, Mississippi 39205 Jackson, Mississippi 39209 i
Mr. R. W. Jackson, Project Engineer Alton B. Cobb, M.D.
i Bechtel Power Corporation State Health Officer 15740 Shady Grove Road State Board of Health P.O. Box 1700 Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher Senior Resident Inspector President
\\
U.S. Nuclear Regulatory Comission Claiborne County Board of Supervisors Route 2 Box 399 Port Gibson, Mississippi 39150 Port Gibson, Mississippi 39150 Recional Administrator, Region II U.S. Nuclear Regulatory Commission b3 l
a a,
r a Mr. James E. Cross GGNS Site Director System Energy Resources, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150
-