MONTHYEARML20199D6161999-01-0404 January 1999 Notice of Violation from Insp on 981025-1205.Violation Noted:Its Requirements for Valve Position Verifications Not Met as Evidenced by Listed Examples ML20249A2941998-06-0808 June 1998 Notice of Violation from Insp on 980322-0509.Violation Noted:As of 980423,licensee Had Not Complied W/Requirements of Procedure CP-111,in That,Only Two of Discrepancies Identified in Ioc NL97-0262,had Been Documented ML20216H8871998-04-0808 April 1998 Notice of Violation from Insp on 980208-0321.Violation Noted:On 980220,Axial Power Imbalance Alarm Was Inoperable for Approx 3.5 Hours & Axial Power Imbalance Was Not Verified to Be within Acceptable Operating Limits ML20248L6171998-03-16016 March 1998 Notice of Violations from Insp on 980126-30.Violations Noted:Test Program for ECCS Operating in Piggyback Mode Did Not Demonstrate That Sys Would Perform Satisfactorily in Service ML20216E9291998-03-0404 March 1998 Notice of Violation from Insp on 980104-0207.Violations Noted:On 980203 Licensee Failed to Accomplish Required Posting of Bulletin Boards ML20203F5561998-02-23023 February 1998 Notice of Violation from Insp on 971021-24,1208-12 & 980105-09.Violations Noted:Implementation of Validation Program Did Not Adequately Demonstrate Usability of Emergency Procedures ML20199G6761998-01-16016 January 1998 Notice of Violation from Insp on 971201-16.Violation Noted: as of 971211,licensee Health Physics Supervisors Failed to Identify & Correct Personnel Contamination Repts That Were Not Completed IAW Requirements of Procedure HPP-104 ML20198N6211997-12-29029 December 1997 Notice of Violation from Insp on 971026-1129.Violation Noted:On 971105,licensee Failed to Perform Adequate Se,Per 10CFR50.59 for Functional Test Procedure for B Emergency Diesel Generator Power Upgrade & Radiator Replacement Mods ML20203A1911997-12-0404 December 1997 Notice of Violation from Insp on 971006-24.Violation Noted:Work Request Numbers 333797 & 333798,issued in Mar 1997 to Install Stem Protectors on Actuators Were Closed W/O Performing Work ML20202D7301997-11-24024 November 1997 Notice of Violation from Insp on 970921-1025.Violation noted:10CFR50.59 SE Had Not Been Performed as Required within 90 Days on Wds Piping non-conforming Condition ML20212B9061997-10-16016 October 1997 Notice of Violation from Insp on 970817-0920.Violations Noted:Scaffolding Control Program Does Not Contain Measures to Assure That Deviations from Design Quality Std for safety-related Equipment Installed Have Adequate Control ML20211Q2581997-10-14014 October 1997 Notice of Violation from Insp on 970922-26.Violation Noted:On 970820,individual Was Terminated & Authorized Access Was Not Removed from Plant Security Computer Until 970905 ML20211E4891997-09-12012 September 1997 Notice of Violation from Insp on 970713-0816.Violations Noted:On 970728,licensee Personnel Performed quality-related Work to Restore once-through SGs During Reduced RCS Inventory Operation Without Written & Approved Procedure ML20210V5241997-09-0505 September 1997 NOV from Insp on 970602-20.Violation Noted:Licensee Made Change to Facility,W/O Prior Commission Approval,That Involved USQ ML20216E3961997-09-0505 September 1997 Errata to NOV from Insp on 970804-06.Violation Noted: Licensee Failed to Have Adequate Assessment of 10 Zones to Facilitate Response to Detection of Penetration of Protected Area Perimeter & Assessment of Existence of Threat ML20210R9221997-08-27027 August 1997 Notice of Violation from Insp on 970804-06.Violation Noted: Licensee Failed to Have Adequate Assessment of 10 Zones to Facilitate Response to Detection of Penetration of Protected Area Perimeter & Assessment of Existence of Threat ML20210M5681997-08-11011 August 1997 Notice of Violation from Insp on 970608-0712.Violation Noted:Licensee CAs for NRC NOV EA 97-094 Inadequate in That Rev 1 of Procedure CP-151 Inadequate to Prevent Repetition of Violation ML20149G1061997-07-0707 July 1997 Notice of Violation from Insp on 970504-0607.Violation Noted:Security Staff Failed to Understand Adequately & Develop Guidance Properly to Address Multiple Temporary Losses of Power to Central Alarm Station Computers ML20148P8991997-06-0606 June 1997 Notice of Violation from Insp on 970127-0321.Violation Noted:Licensee Failed to Report Condition That Was Outside Design Basis of Plant,Unanalyzed Condition That Compromised Plant Safety & Vulnerability in Safeguard Sys ML20140E7741997-06-0505 June 1997 Notice of Violation from Insp on 970319-21.Violation Noted:Licensee Made Changes to Facility & Procedures Described in FSAR That Involved USQs Based on Inadequate SE ML20140D2681997-06-0202 June 1997 Notice of Violation from Insp on 970330-0503.Violation Noted:On 970327,red Tags from Released Electronic Clearance Order (Eco) 96-012-98 Found on 4160 Volt Breaker Cubicles for a & B Makeup Pumps ML20140F0461997-05-29029 May 1997 Notice of Violation from Insp on 970317-21.Violation Noted: on 970116,outdated Physical Security & Training & Qualification Plans & 1990 Safeguards Info Insp Repts & LERs Were Left Unattended & Not Locked in Secured Area ML20138J4041997-04-21021 April 1997 Notice of Violation from Insp on 970223-0329.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Procedures to Control Equipment for Normal Operating Conditions ML20140E7411997-04-18018 April 1997 Notice of Violation from Insp on 970317-21.Violation Noted: on 960209,licensee,through Deliberate Action of Three Individuals,Allowed Badge/Key to Leave Protected Area W/O Being Under Observation & Control of Security Force ML20148F9791997-04-0404 April 1997 Notice of Violation from Insp on 960729-0802.Violation Noted:R Stewart Deliberately Failed to Provide Complete & Accurate Info During Preemployment Process & Include History of Criminal Convictions on Personal History Questionnaire ML20137T0311997-03-24024 March 1997 Notice of Violation from Insp on 970112-0222.Violations Noted:Licensee Failed to Prescribe Quality Related Clearance Tagging Activities Into Appropriate Procedure That Compliance Procedure 115 Nuclear Plant Tags ML20137E5291997-03-12012 March 1997 Notice of Violation from Insp on 961206.Violation Noted: in April 96 Licensee Made Change to Facility Described in Fsar,Which Involved Three USQ W/O Prior Commission Approval ML20137E4441997-02-28028 February 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:Procedures Were Not Implemented & Maintained to Detailed Requirements Necessary to Implement Security Plan for Plant Operations ML20135C7071997-02-21021 February 1997 Notice of Violation from Insp on 960805-09.Violation Noted: Fuel Handling Event Involving Fuel Assembly N8C6 Was Not Recorded in Operating Logs or Refueling Log & Main Fuel Handling Bridge Was Not Verified for Indexing ML20134P3951997-02-0505 February 1997 Notice of Violation from Insp on 961201-970111.Violations Noted:Rcs Cooldown Rate Allowed to Exceed Limits Specified in PTLR for Approximately One Hour,During Unit Cooldown ML20132C7991996-12-0505 December 1996 Notice of Violation from DOL Recommended Decision & Order, & Investigation by NRC OI Completed on 960924. Violation Noted:Licensee Discriminated Against Ta James, Former Security Escort & Firewatch ML20135C3921996-11-27027 November 1996 Notice of Violations from Insp on 961006-1102.Violations Noted:No Licensee Sp Included Channel Check for Motor Driven Emergency Feedwater Pump Discharge Pressure Gauge ML20129H7261996-10-30030 October 1996 Notice of Violation from Insp on 960908-1005.Violation Noted:Failure of Clearance for Work Request Nu 0337713 to Require Tripping Fuel Racks Prior to Opening Air Supply Isolation Valve Resulted in Inadvertent Start of Generator ML20129A1561996-10-0404 October 1996 Notice of Violation from Insp on 960811-0907.Violation Noted:Technician Failed to Follow Requirements of PT-366, Resulting in Inadvertent Initiation of Control Room Emergency Ventilation Sys & Escort Lost Contact W/Visitor ML20134C3091996-09-12012 September 1996 Notice of Violation from Insp on 960714-0810.Violation Noted:Failure to Take Prompt Corrective Actions to Address Discrepancies Identified in Feb 1995 During make-up Sys Audit ML20149J2031994-02-16016 February 1994 Notice of Violation from Insp on 930825.Violation Noted: DA Tritt Discharged from Employment on 871203,for Engaging in Protected Activities (88-ERA-29) ML20059C0791993-12-10010 December 1993 Notice of Violation from Insp on 931108-12.Violations Noted: Surveillance Procedure SP-182,rev 10, Reactor Bldg Structural Integrity Surveillance Program Not Implemented as Described ML20058P6781993-12-0303 December 1993 Notice of Violation from Insp on 931101-19.Violation Noted: Facility Licensee Physician Made Determination That Two Operators Eyesight No Longer Met Min Stds Required by 10CFR55.33(a)(1) ML20057B4201993-09-10010 September 1993 Notice of Violation from Insp on 930628-0730.Violation Noted:Design Control Measures Had Not Assured Design Bases Were Properly Translated Into Min Terminal Voltage Specified by Battery Svc Test Surveillance Procedure SP-523,Rev 28 ML20057C3231993-09-0909 September 1993 Notice of Violation from Insp on 930711-0814.Violation Noted:Measure Did Not Assure Corrective Actions Preclude Repetition of Reactor Coolant Sys Overcooling Event of 930305 ML20056E9861993-08-0909 August 1993 Notice of Violation from Insp on 930606-0710.Violation Noted:Mut Hydrogen Regulator Adjusted W/O Required Safety Evaluation Being Performed ML20126F1881992-12-11011 December 1992 Notice of Violation from Insp on 921018-1114.Violation Noted:Dg Inoperable for Two H During Performance of Surveillance procedure,SP-907B.Required Breaker Alignment & Power Availability Verifications Not Performed ML20062D9451990-11-0707 November 1990 Notice of Violation from Insp on 900918-1005.Violation Noted:On 900918,containment Integrity for Unit Not Maintained While in Mode 1 in That Valve Dhv 43 Did Not Fully Shut After Performing Cycling & Disabling Evolution ML20059G6001990-08-31031 August 1990 Notice of Violation from Insp on 900707-0810.Violation Noted:Valve Realignment Sequence Violated in That Air Dryer Bypass Valve Closed First Instead of Last While Releasing Work Request 90-07-036 ML20247Q1791989-09-13013 September 1989 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Noncompliance noted:safety-related Motor Control Ctrs in Auxiliary Bldg Had Not Been Demonstrated to Be Qualified for Environ Conditions ML20246Q3321989-09-0101 September 1989 Notice of Violation from Insp on 890708-0804.Violations Noted:Channel Functional Test Not Performed on Containment Hydrogen Monitors & Six Manual Valves Associated W/Emergency Containment Not Verified Closed Every 31 Days ML20246N7571989-08-21021 August 1989 Notice of Violation from Insp on 890710-14.Violations Noted: Verification of Remote Position Indicators at Remote Shut Down Panel Not Being Performed & Record of Results for Relief Valve BSV-19 Vacuum Function Testing Did Not Exist ML20245K2891989-08-11011 August 1989 Notice of Violation from Insp on 890619 & 20.Violation Noted:No Surveillance Procedure Written or Implemented to Test Automatic Start Logic Paths for motor-operated Emergency Feedwater Pump ML20245K0331989-08-0101 August 1989 Notice of Violation from Insp on 890603-0707.Violation Noted:On 890621,several Cells of Station Batteries a & B Had Electrolyte Levels Greater than Max Level Mark & Four Unqualified Personnel Assigned Duty on Fire Brigade ML20246K7251989-07-0707 July 1989 Notice of Violation from Insp on 890531-0602.Violations Noted:Operator Failed to Have Procedures Present for Performing Actions Not Routine & Rev 80 to General Plant Operating Procedure OP-02 Re Plant Heatup Inadequate 1999-01-04
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000302/19990051999-09-13013 September 1999 Insp Rept 50-302/99-05 on 990704-0814.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000302/19990041999-07-27027 July 1999 Insp Rept 50-302/99-04 on 990523-0703.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19990031999-06-0404 June 1999 Insp Rept 50-302/99-03 on 990411-0522.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation.Major Areas Inspected:Aspects of Licensee Maint, Operations,Engineering & Plant Support IR 05000302/19990021999-05-0606 May 1999 Insp Rept 50-302/99-02 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000302/19990011999-03-29029 March 1999 Insp Rept 50-302/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000302/19980101999-01-0404 January 1999 Insp Rept 50-302/98-10 on 981025-1205.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Insp Also Included Results of Physical Security Specialist ML20199D6161999-01-0404 January 1999 Notice of Violation from Insp on 981025-1205.Violation Noted:Its Requirements for Valve Position Verifications Not Met as Evidenced by Listed Examples IR 05000302/19980131998-12-16016 December 1998 Insp Rept 50-302/98-13 on 981116-20.No Violations Noted. Major Areas Inspected:Area of Plant Support by Regional Safeguards Specialist.Physical Security Program Was Evaluated IR 05000302/19980121998-12-0101 December 1998 Insp Rept 50-302/98-12 on 981013-16.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for Crystal River Unit 3 IR 05000302/19980091998-11-13013 November 1998 Insp Rept 50-302/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19980081998-10-0606 October 1998 Insp Rept 50-302/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000302/19980071998-08-31031 August 1998 Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19983011998-07-31031 July 1998 NRC Operator Licensing Exam Rept 50-302/98-301,including Completed & Graded Tests,For Tests Administered on 980629-0702 IR 05000302/19980061998-07-20020 July 1998 Insp Rept 50-302/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000302/19980041998-06-0808 June 1998 Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20249A2941998-06-0808 June 1998 Notice of Violation from Insp on 980322-0509.Violation Noted:As of 980423,licensee Had Not Complied W/Requirements of Procedure CP-111,in That,Only Two of Discrepancies Identified in Ioc NL97-0262,had Been Documented IR 05000302/19980991998-06-0404 June 1998 SALP Rept 50-302/98-99 for 961006-980509 ML20216H8941998-04-0808 April 1998 Insp Rept 50-302/98-03 on 980208-0321.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20216H8871998-04-0808 April 1998 Notice of Violation from Insp on 980208-0321.Violation Noted:On 980220,Axial Power Imbalance Alarm Was Inoperable for Approx 3.5 Hours & Axial Power Imbalance Was Not Verified to Be within Acceptable Operating Limits ML20248L6171998-03-16016 March 1998 Notice of Violations from Insp on 980126-30.Violations Noted:Test Program for ECCS Operating in Piggyback Mode Did Not Demonstrate That Sys Would Perform Satisfactorily in Service IR 05000302/19980021998-03-13013 March 1998 Insp Rept 50-302/98-02 on 980126-30.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering.Emergency Operating Procedures Were Also Reviewed ML20216E9611998-03-0404 March 1998 Insp Rept 50-302/98-01 on 980104-0207.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216E9291998-03-0404 March 1998 Notice of Violation from Insp on 980104-0207.Violations Noted:On 980203 Licensee Failed to Accomplish Required Posting of Bulletin Boards ML20203F5561998-02-23023 February 1998 Notice of Violation from Insp on 971021-24,1208-12 & 980105-09.Violations Noted:Implementation of Validation Program Did Not Adequately Demonstrate Usability of Emergency Procedures ML20203F5631998-02-23023 February 1998 Insp Repts 50-302/97-12 on 971020-24,1208-12 & 980105-09. Violations Noted.Major Areas Inspected:Adequacy of EOPs Development Process PNO-II-98-005, on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 9802051998-02-0202 February 1998 PNO-II-98-005:on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 980205 PNO-II-98-004, on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License1998-01-30030 January 1998 PNO-II-98-004:on 980130,Region II Administrator Informed FPC That NRC Was Satisfied W/Completion of FPC Actions Specified in Cal, & Concurred That Plant,Unit 3 Could Operate IAW License IR 05000302/19970191998-01-29029 January 1998 Insp Rept 50-302/97-19 on 971130-980103.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-003, on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release1998-01-22022 January 1998 PNO-II-98-003:on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release ML20199G6761998-01-16016 January 1998 Notice of Violation from Insp on 971201-16.Violation Noted: as of 971211,licensee Health Physics Supervisors Failed to Identify & Correct Personnel Contamination Repts That Were Not Completed IAW Requirements of Procedure HPP-104 ML20199G6861998-01-16016 January 1998 Insp Rept 50-302/97-20 on 971201-16.Violations Noted.Major Areas Inspected:Operations,Radiological Protection,Maint & Surveillance Programs IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000302/19970181998-01-0606 January 1998 Insp Rept 50-302/97-18 on 971117-21 & 1201-12.No Violations Noted.Major Areas Inspected:Plant Support ML20198N6271997-12-29029 December 1997 Insp Rept 50-302/97-19 on 971026-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198N6211997-12-29029 December 1997 Notice of Violation from Insp on 971026-1129.Violation Noted:On 971105,licensee Failed to Perform Adequate Se,Per 10CFR50.59 for Functional Test Procedure for B Emergency Diesel Generator Power Upgrade & Radiator Replacement Mods ML20198P2251997-12-29029 December 1997 Insp Rept 50-302/97-21 on 971203.Violations Noted.Major Areas Inspected:Noncompliances in Design control,10CFR50.59, Procedural Adequacy,Reportability & Corrective Actions.No Notice of Violation Being Issued in This Case ML20199A2091997-12-22022 December 1997 EN-97-116:on 971229,informs Commission That Staff Intends to Exercise Enforcement Discretion in Accordance W/Section VII.B.2 of Enforcement Policy & Not Issue NOV or Proposed Imposition of Civil Penalty to Util for Violations PNO-II-97-063, on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified1997-12-19019 December 1997 PNO-II-97-063:on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified IR 05000302/19973011997-12-17017 December 1997 NRC Operator Licensing Exam Rept 50-302/97-301 Including Completed & Graded Test for Test Administered on 971118. Exam Results:Sro Candidate Passed Written Exam ML20203A1911997-12-0404 December 1997 Notice of Violation from Insp on 971006-24.Violation Noted:Work Request Numbers 333797 & 333798,issued in Mar 1997 to Install Stem Protectors on Actuators Were Closed W/O Performing Work ML20203A2061997-12-0404 December 1997 Insp Rept 50-302/97-14 on 971006-24.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20202D7301997-11-24024 November 1997 Notice of Violation from Insp on 970921-1025.Violation noted:10CFR50.59 SE Had Not Been Performed as Required within 90 Days on Wds Piping non-conforming Condition IR 05000302/19970161997-11-24024 November 1997 Insp Rept 50-302/97-16 on 970921-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-97-059, on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities1997-11-18018 November 1997 PNO-II-97-059:on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities ML20212B9061997-10-16016 October 1997 Notice of Violation from Insp on 970817-0920.Violations Noted:Scaffolding Control Program Does Not Contain Measures to Assure That Deviations from Design Quality Std for safety-related Equipment Installed Have Adequate Control IR 05000302/19970131997-10-16016 October 1997 Insp Rept 50-302/97-13 on 970817-0920.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000302/19970151997-10-14014 October 1997 Partially Withheld Insp Rept 50-302/97-15 on 970922-26 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Plant Support by Regional Safeguards Inspector ML20211Q2581997-10-14014 October 1997 Notice of Violation from Insp on 970922-26.Violation Noted:On 970820,individual Was Terminated & Authorized Access Was Not Removed from Plant Security Computer Until 970905 ML20211E4891997-09-12012 September 1997 Notice of Violation from Insp on 970713-0816.Violations Noted:On 970728,licensee Personnel Performed quality-related Work to Restore once-through SGs During Reduced RCS Inventory Operation Without Written & Approved Procedure ML20211E5791997-09-12012 September 1997 Insp Rept 50-302/97-11 on 970713-0816.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support 1999-09-13
[Table view] |
Text
-
l ENCLOSURE 1 NOTICE OF-VIOLATION
' Florida. Power Corporation Docket No. 50-302.
Crystal River Unit 3 License No. DPR-72 During the Nuclear Regulatory Commission (NRC) inspection conducted on June 12 - July 9,1987, violations of NRC requirements were identified. The
. violations involved failure to perform a surveillance test required by the Technical Specifications (TS), failure to adhere to. plant procedures, failure to perform an adequate. Inservice Testing (IST) program, failure to conduct a proper review and approval of Inservice Inspection (ISI) program procedures,
.and failure to retain records of the ISI program. In accordance with the
" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1966), the violations are listed below:
A-. TS 4.8.2.1.2' requires that whenever a transformer is used to supply.
power to a 120 volt AC vital bus instead of the normal source of power, the transformer shall be demonstrated operable within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Contrary to the above, from 10:43 AM on July 2, 1987, until 5:15 PM on July 3, 1987 (approximately 30.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />), a transformer was utilized to supply power to the 120 volt AC Vital Bus 3A and this transformer was not demonstrated to be operable and functioning properly within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, i This is a Severity Level IV Violation (Supplement I).
B. TS 6.8.1 requires the establishment and implementation of written procedures . for those activities recommended in Appendix "A" of Regchtory Guide 1.33, November 1972, and for surveillance activities of safety-related equipment.
Regulatory Guide 1.33, Appendix A, Section A.3, recommends a proce-dure for equipment control.
Compliance procedure CP-115, In-Plant Equipment Clearance and Switching Orders, was written to meet the requirements of Regulatory Guide 1.33 and specifies in step 5.3.6.h that the return-to-normal position of the valve, switch, or breaker after removal of a tag shall be obtained from the applicable procedure.
1 Surveillance procedure SP-650, ASME Code Safety Valves Test, step i' 8.2.4 requires that the steam system be at a pressure in the range of 885-910 psig for in place testing of Main Steam Safety Valves (MSSV).
Surveillance procedure SP-333, Control Rod Exercises, steps 9.1.57 )
through 9.1.60, provide the steps needed to restore the control rod drive system to the normal configuration.
8708100484 870005 PDR ADOCK 05000302 G PDR
Florida Power Corporation 2 Docket No. 50-302 Crystal River Unit 3 License No. DPR-72 I
Contrary to the above:
- 1. On June 19, 1987, procedure CP-115 was not implemented lin i that an equipment clearance. directed valve SWV-14 to be l restored to a position contrary to .that required by ~ the appropriate system operating procedure. This resulted in the valve being restored to the incorrect position- upon removal of the tag.
~2. On July 7, 1987, procedure SP-650 was performed to test a-MSSV in place with a steam system pressure of 920 psig.
- 3. On July 3,1987, . procedure SP-333 was not implemented. in -
that . steps 9'.1.57 through 9.1.60 were not performed while i restoring the control rod drive - system . to the normal configuration.
This is a Severity Level IV Violation (Supplement I). 1 C. TS 4.0.5.b requires the performance of IST of ASME Code Class 1, 2 and 3 pumps and valves in accordance with Section XI of the ASME Boiler and Pressure Vessel Code pursuant to the requirements of 10 CFR 50,-Section 50.55a(g).
In letters dated June 4,1982, June 14,1983, July 1,1985, and October 22, 1985, the NRC directed the licensee to implement their proposed IST program pursuant to the requirements of 10 CFR-50.55a(g).
Contrary to the above, as of July 9, 1987, the proposed IST-program was not properly implemented in that two pumps and' thirty valves identified in the program as requiring testing were not being tested.
This is a Severity Level IV Violation (Supplement 1).
D. TS 6.8.2.b requires procedures for surveillance and test activities and changes thereto be reviewed and approved by an intradapartmental qualified reviewer and an interdisciplinary qualified reviewer .in interfacing departments prior to implementation. This TS also requires that the Plant Review Committee (PRC) review the 10 CFR 50.59 evaluation within 14 days of approval.
ISI activity .. procedures are listed as a surveillance and test activity under TS 4.0.5.b.
Contrary to the above, as of July 9, 1987, procedures used to conduct the 1980 Outage #3 ISI program, the 1983 Outage #5 ISI program, and changes to the 1985 Outage #6 ISI program were not reviewed and approved prior to implementation as required by TS 6.8.2.b. In addition., the 10 CFR 50.59 evaluation reviews were not performed by the PRC.
This is a Severity Level IV Violation (Supplement I).
1
Florida Power Corporation 3 Docket No. 50-302 Crystal River Unit 3 License No. DPR-72 t
t E. TS 6.10.2.h requires records of ISI performed pursuant to the TS be retained for the duration of the Facility Operating License.
Contrary to the above, as of July 8,1987, records delineating hydrostatic testing boundaries for ISI tests performed in the 1980 Outage #3 and the 1983 Outage #5 were not retained. As a result the adequacy of four hydrostatic tests performed in the 1980 Outage #3 could not be determined. '
This is a Severity Level IV Violation (Supplement I).
' Pursuant to the provisions of 10 CFR 2.201, Florida Power Corporation is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including:
(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the-results achieved; (4) corrective steps which will be taken to avoid further '
viclations; and (5) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
FOR THE NUCLEAR REGULATORY COMMISSION (Original signed by L. Reyes)
Luis A. Reyes, Director Division of Reactor Projects Dated at Atlanta, Georgia this 5th day of August 1987
-