9

/f "'%g?g UNITED STATES g

NUCLEAR REGULATORY COMMISSION '

y' j

WASHtNGTON, D. C. 20555

\\...../

GULF STATES UTILITIES COMPANY DOCKET N0. 50-458

)

4 RIVER BEND STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 16 License No. NPF-47 i

1.

The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A.

The application for amendment filed by Gulf States Utilities Company, dated September 8, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's regulations set forth in 10 CFR Chapter I; B.

The f acility will operate in conformity with the application, the

{

provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized j

by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the. Commission's regulations; 0.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have I

been satisfied.

{

2.

Accordingly, the license is amended by changes to license condition l

2.C(1), Attachment 1, Item 4 and the addition of new items 5, 6 and 7, and license condition 2.D of Facility Operating License No. NPF-47. and license condition 2.D are hereby amended to read as follows:

8711100003 871102 PDR ADOCK 05000458 P

PDR

?

[

ATTACHMENT 1 T0-NPF 47-1 Prior to achieving the condition indicated on or.before the date indicated,-

the following items shall be completed to the satisfaction of Pegion IV;;

j 1.

OUTSTANDING ITEMS TO BE ACCOMPLISHED PRIOR TO COMPLETION OF THE INITIAL TEST PROGRAM u

Verify the station electric distribution voltage analyses are in.

a.

accordance with the guidelines of Branch Technical-Position PSB-1, Position 4.

i b.

Perform an engineering evaluation and complete. modifications:on'.the battery powered lighting system used in areas of the plant outside the main control room required for ' safe shutdown and personnel evacuation to upgrade those areas identified as deficient with'regar'd to the requirements contained in FSAR Table 9.5-2.

)

2.

OUTSTANDING ITEM TO BE COMPLETED PRIOR TO THE FIRST-REFUELING OUTAGE-

)

)

a.

Complete and have operational the fuel building sampling system.

Off-loading of irradiated fuel prior to the first refueling outage shall be performed as described in GSU's letter dated June 13, 1985.

3.

OUTSTANDING ITEM TO BE COMPLETED PRIOR TO FIRST DESIGN USE OR PRIOR TO STARTUP FOLLOWING THE FIRST REFUELING OUTAGE (WHICHEVER IS FIRST) 4 I

a.

Complete a 1-oad test'which meets all the OSHA requirements for load handling capability on all remaining cranes and hoi ~sts not previously tested.

4.

OUTSTANDING ITEMS TO BE ACCOMPLISHED PRIOR TO'STARTUP.FOLLOWING'THE FIRST REFUELING OUTAGE a.

Repair or replace the control valves on HVAC chillers as delineated in the 10 CFR 50.55(e) report identified as DR-314.

5.

OUTSTANDING ITEM TO BE ACCOMPLISHED BY MAY 31, 1988 a.

Complete installation of equipment improvements to the security radio communications system.

6.

OUTSTANDING ITEM TO BE ACCOMPLISHED PRIOR TO START-UP FOLLOWING A SUBSEQUENT OUTAGE WITH A PLANNED DURATION OF SEVEN DAYS OR LONGER FOLLOWING MAY 31, 1988 l

a.

Conduct. testing to determine if adequate radio communication capability exists from appropriate plant areas.

7.

OUTSTANDING ITEM TO BE ACCOMPLISHED PRIOR TO START-UP FOLLOWING THE SECOND REFUELING OUTAGE a.

If during acceptance. testing it is determined that further modifica-tions and/or testing are required, this shall be performed during a subsequent outage of sufficient duration but prior to start-up.

following the second refueling outage.

i 1

1

) }

D.

GSU shall fully implement and maintain in effect all provisions of i

the Commission-approved physical security, guard training and qualifi-cation, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions.to 10-CFR 73.55 and all amendments and revisions made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The plans, which contain Safeguards Information protected under 10 l

CFR 73.21, are entitled:

" River Bend Physical Security Plan," with

(

revisions submitted through August 22, 1986;'" River Bend Station Guard Training and Qualification Plan" with revisions submitted j

through December 16, 1986; and " River Bend. Safeguards Contingency Plan" with revisions submitted through January 27, 1987.

l 3.

This license amendment is effective as of its date of issuance.

.j FOR THE NUCLEAR REGULATORY COMMISSION l

1 g(

(a lm

]

n

/

j c

Jose A. Calvo, Director 1

Project Directorate - IV j

Division of Reactor Projects - III, j

IV, V and Special Projects j

Office of Nuclear Reactor Regulation 1

Date of Issuance: Novcmber 2,1987

{

l l

j

_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ - _ _