Ack Receipt of Util Transmitting Proposed Amend to Facility Physical Security Plan.Comments on Physical Security Plan Changes (Miscellaneous Amends & Search Requirements) Encl
ML20236J305
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/22/1987
From: Silver H
Office of Nuclear Reactor Regulation
To: Wilgus W
FLORIDA POWER CORP.
References
TAC-65483, NUDOCS 8711050251
Download: ML20236J305 (3)


Text

i l 'j..,, ' x l ? ' t P Q. Q W p ve M / Swf"'

OCT' Il 1987 y

'(DocketNo.!50-302-Mr. W. S..Wilgus Vice President - Nuclear Operations-1 Florida Power Corporatio'n ATTN: Manager, Nuclear Licensing P. O. Box 219 Crystal. River,-Florida l32629

Dear Mr. Wilgus:

SU8 JECT:

MISCELLANEOUS AMENDMENTS / SEARCH REQUIREMENTS l

-CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT (TAC #65483) l l

This is to acknowledge receipt of the Florida Power Corporation letter, dated December 2, 1986, which transmitted a proposed amendment to.the Crystal River Unit 3 Nuclear Generating Plant Physical Security Plan, i

in response.to the Miscellaneous Amendments and Search Requirements.

The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval.

The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.

It is requested that you provide your response to these comments within 30 days from receipt of this letter.

The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Should you have any questions concerning the enclosed comments, please contact the reviewer, Do'n Carlson, at (301) 492-7242.

Sincerely, sP, 8711050251 871022 Harley Silver, Project Manager DR ADOCK 05000302 Project Directorate II-2 p

OR Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical Security Plan. Comments RSGB rf Sec rf DCarlson Cluracker (2) cc w/ enclosure:

Region II

..DMiller._..

See next page HSilver

, Docket.Eile 50-302?

Case File NRC PDR RErickson wo/ encl Local PDR LBush wo/ encl PStarcher n

<0-J. Gibson A J bl.

h _!

0[ _

."[0$_$[_____"._________5

_ $ _". _ _ J _ _

$[.____._________

DATE: $ 9/jt/87

$9/JP/87

$9/ /87

$9/p 7

$/I/87_____ _$W/$87$

.Y' i'

y(5 L i k-

- -5 r

L & pi; Crystal River Unit ~ No. 3 Nuclear 4-Mr. W. S. Wilgus Florida Power Corporation Generating Plant.

cc:

Mr. R. ' W.2 Neiser State Planning and Development

. Senior Vice' President Clearinghouse and General-Counsel Office of Planning and. Budget Florida Power Corporation Executive Office of the Governor P.

0.. Box 140421,

The Capitol Building St.
Petersburg,! Florida 33733 Tallahassee, Florida 32301 l

.Mr.-P. F..McKee Mr. F.'Alex Griffin, Chairman-Director, Nuclear Plant Operations Board of County Commissioners Florida Power. Corporation Citrus = County' i

P. 0. Rox 219 110 North Apopka Avenue Crystal. River, Florida 32679 Inverness, Florida 36950

Mr.--Robert:R. Borsum Mr. E. C. Simpson Director, Nuclear Site

' Babcock & Wilcox

- Florida Power Corporation Support Nuclear Power Generation Division Suite'?20, 7910 Woodmont Avenue P.O. 80x 914 Bethesda, Maryland. 90814

. Crystal River, Florida 3?629

~

Resident Inspector U.S'. Nuclear Regulatory Commission

-15760 West'Powerline Street -

- Crystal River, Florida 32629 I

Regional Administrator, Region II U.S. Nuclear Regulatory Commission

.101 Marietta Street N.W.,. Suite 2900

., Atlanta,-Georgia ~ 30323:

Jacob Daniel Nash Office of Radiation Control' Department.of Health and 1

Rehabilitative Services 1317 Winewood Blvd.

' Tallahassee, Florida 32399-0700 Administrator Department.of Environmental Regulation Power Plant Siting Section

.. State of Florida 2600 Blair Stone Road Tallahassee, Florida 3?301

-Attorney. General Department of Legal Affairs l

The Capitol.

Tallahassee, Florida 3?304 1

i I'

l 1

a.

-- o i

j I

.e l

Docket No. 50-302 ENCLOSURE 1

l (MISCELLANE0US AMENDMENTS AND SEARCH REQUIREMENTS) l COMMENTS ON PHYSICAL SECURITY PLAN CHANGES q

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT i

Explicitly stipulate that in a plant safety emergency, reasonable action may be taken to suspend any safeguards measures in accordance with 10 CFR 50.54(x) and (y) when this action is immediately needed to protect the public health s

and safety and no action consistent with license conditions and technical l

specifications that can provide adequate or equivalent protection is l

immediately apparent.

Reference 10 CFR 73.55(a) and Generic Letter 87-08 (Q&A #2).

Security Plan

Reference:

Page 60, Section 9.3.1.

Safeguards j

Contingency Plan

Reference:

Page 4 of 82, Section 1.3.3.

In Section 5.9 of the physical security plan, delete the part relating to j

" personnel (non-safety related) emergencies" and state that vital area access controls will not be dropped for life threatening situations not involving public health and safety.

Reference 10 CFR 50.54(x) and (y) and i

Generic Letter 87-08 (Q&A #3).

I Provide a commitment that the search requirements will be implemented within 60 days after Commission approval of the proposed revisions.

Reference 10 CFR 73.55(d)(1).

Provide a specific commitment that the vital area access list will be reapproved by the cognizant manager / supervisor at least esery 31 days.

Reference 10 CFR 73.55(d)(7)(1)(A).

Security Plan

Reference:

Page 29a, 1

Section 5.2.1.

I Provide a commitment to positively control, in accordance with the current approved access lists, all points of personnel and vehicle access to vital areas.

Section 5.1 of the physical security plan should be expanded to i

include vital areas.

Reference 10 CFR 73.55(d) (7)(1)(B).

l Provide a specific commitment to ensure prompt access to vital equipment I

to accommodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.

Indicate how this prompt access I

will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means).

Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Provide a commitment to annually review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety.

Reference 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.

Security Plan

Reference:

Page 79, Chapter 13.

Specifically. indicate what components of the secondary power supply system will be protected as vital.

Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).