Text
.
1 4
/
o UNITED STATES
~g
["'
g g
NUCLEAR REGULATORY COMMISSION 7,,
,e WASHINGTON, D. C. 20$55 r
JUL 811987 Docket Nos.: 50-369 and 50-370 1
Mr. H. B. Tucker, Vice Proident-Nuclear Production Department Duke Power Company 422 South Church Street Charlotte, North Carolina 28242 ll-
Dear Mr. Tucker:
Subject:
Relief from Hydrostatic Test Requirements for UHI Cappin McGuire Nuclear Station, Units 1 and 2 (TACS 65133/65134 By letter dated April 7,1987, you requested relief from the hydrostatic testing requirements of ASME Code Section XI for portions of the Safety Injection systems for McGuire Nuclear Station, Units 1 and 2.
The request results from modifications involving capping of the four Upper Head Injection (UHI) penetrations at the reactor vessel head.
Removal of the UHI system and capp(Unit 1) and 38 (Unit 2).ing of the penetrations were previously authorized by Licens 57 Paragraphs IWA-4400 and IWB-5000 of ASME Boiler and Pressure Vessel Code,Section XI, 1980 Edition through the Winter 1980 Addenda, require a test pressure of 2295 psig at a temperature of 500*F or higher, increasing to a maximum of 2500 psig at 100*F or less. Relief was requested based upon your inability to achieve the specified pressure and temperature.
- Instead, you proposed 100% radiographic and 100% PT examinations upon completion of all pressure boundary welds, PT examination of all root pass welds, inservice leak testing during Mode 3, and a 10 year hydrostatic test.
The staff has determined that the Code requirements are not practical in this case because the temperatures and radiation levels encountered by test per-sonnel would be excessive, because fuel damage could result, and because the number of design pressure cycles allowed during plant life are limited. The proposed combination of weld design, nondestructive examinations and leakage tests of the capped penetrations will provide an acceptable level of structural integrity. Our Safety Evaluation Report is enclosed.
A
!Pa*IBau!!e'%9 P
Mr. H. B. Tucker s McGuire Units 1 and 2 as requested, pursuant to relief is authorized by law and will not endanger life or property or the This common defense and security and is otherwise in the public interest given d consideration to the burden upon the licensee that could result if the req ments were imposed on the facility.
Since ely, W
0,'
B.
.Y ngbloo, Director Pr ject Directorate II-3 Divisio of Reactor Projects-I/II
Enclosure:
As stated cc: See next page D
w
[.
1 l
l Mr. H. B. Tucker JUL 311987
)
b.
Accordingly, relief from the hydrostatic test requirements is granted for l
McGuire Units 1 and 2 as requested, pursuant to 10 CFR 50.55a(g)(6)(1). This relief is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest given due consideration to the burden upon the licensee that could result if the require-ments were imposed on the facility.
l l
Sincerely,
]
N6\\
B. J. Youngblood, Director l
Project Directorate 11-3
)
Division of Reactor Projects-I/II
Enclosure:
As stated cc: See next page Distribution:
Docket File 4 -
NRC PDR Local PDR PRC System PD23 Peading MDuncan DHood BJYoungblood ACRS (10)
OGC-Bethesda SVarga/Glair.as JPartlow l
EJordan l
l l
>9 L l
n<
MDurida'k/DRP-I/II Oqg theada PD. TI D P-I/II PD#II-3/DRP-I/II PD#II-DHood/mac rf BJY ungblood 07/7 ; /87 07g]/87 0/
/87 07/ f /87