ML20236G933
| ML20236G933 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 10/29/1987 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| RTR-NUREG-1045 NUDOCS 8711030351 | |
| Download: ML20236G933 (2) | |
See also: IR 05000298/1987001
Text
_____ _ _ _
_
r
.
OCT 2 91987
In Reply Refer To:
SAFEGUARDS INFORMATION
Docket:
50-298/87-01
Nebraska Public Power District
ATTN: George A. Trevors
Division Manager - Nuclear Support
P. O. Box 499
Columbus, NE
68601
Gentlemen:
Thank you for your letter of April 28, 1987, in response to our letter and the
attached Notice of Violation dated March 30, 1987. As a result of our review,
we find that additional information, as discussed with your Mr. M. Hamm (during
a telephone call on October 22, 1987) is needed.
Specifically, the response to
the violation of inadequate security organization screening does not address
the matter of psychological testing for the supervisors.
In addition, the
discussion on inadequate compensatory measures does not acknowledge the
violation or reflect consideration of guidance, such as NUREG 1045, concerning
compensatory measures.
Please provide the supplemental information within 30 days of the date of this
letter.
Sincerely,
UrIginal Signed My
L J. . Callan
'
L. J. Callan, Director
Division of Reactor Projects
cc:
Cooper Nuclear Station
ATTN: Guy Horn, Division Manager
of Nuclear Operations
P. O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc:
(see next page)
(
I
RIV:RPS
j
C:RPSB
AC:PS/C
D:
P
JAFKell
LAYand
GLMadse
LJCallan
g
{D/p/87
[049/
ll (M/87
10 /d/87
ENCLOSURE CONTAINS
SAFEGUARDS INFORMATION.
UPON SEPARATION THIS
8AFEGUARDS INFORMATIDH
PAGE IS DECONTROLL
8711030351 871029
I
/p
{
ADOCK c5000298
0
j
>
_ _ _ _ _ _ _ _ _ _ _ ____ ___
_-_
j
e
.
Nebraska Public Power District
-2-
bec w/ copy of licensee's response w/ safeguards:
RIV Security File
P. A. Starcher, RSGB/NRR
Resident Inspector
R. D. Martin, RA
R. L. Bangart, DRSS
Security Inspector
Chief, RPSB
RPSB Security File
1
bcc w/ copy of licensee's response w/o safeguards:
-DMB IE-04
D. Weiss, RM/ALF
-
Section Chief (PS/C)
RIV File
MIS
RSTS Operator
i
RPSB
R. E. Hall, DRSS
Project Engineer, PS/C
,
W. Long, NRR Project Inspector
]
-
I
ENCLOSURE CONTAINS
SAFEGUARDS INFORMATION.
UPON SEPARATION THIS
PAGE IS DECONTROLLED.
_
a
.
..
.
p rg
coorn m,cuansinn m
211- Nebraska Public Power District
"" """t=0;tMN=T^ "'"
4 -
.=_
+====,=-n,
_ ,
- -.
, , - - - - _
CNSS874192
April 28, 1987
Wh80 2 panted ff0m fDCl0$UTM,
!Ladie his Doccment a Decontrolled.
Nuclear Regulatory Commission
Document Control Desk
Washington, D.C.
20555
Subj ect: NPPD Response to Inspection Report 50-298/87-01, Appendix A
Gentlemen:
This letter is written in response to your letter dated March 30, 1987,
transmitting Inspection Report 50-298/87-01. Therein you indicated that
certain of our activities were in violation of NRC requirements.
l
Following are the statements of the violations and our responses in
accordance with 10CFR2.201.
In accordance with the provisions of 10 CFR Part 73.21, we request'that the
attached report be treated as safeguards information and withheld from
public disclosure.
Should you have any questions regarding this response, please contact me or
G.R. Horn at the site.
Sincerely,
,
,
,
(Y.1dL
'A
,
,
G. A. Trevors
Division Manager of
Nuclear Support
GAT:JM:bs
cc:
U.S. Nuclear Regulatory Commission
Regional Office, Region IV
NRC Resident Inspector
Cooper Nuclear Station
L
W-19044-870428
ADOCK 05000298
fe
G
e
__ _-