ML20236G933

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/87-01.Addl Info Re Psychological Testing for Supervisors Requested as Discussed W/M Hamm During 871022 Telcon
ML20236G933
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/29/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
RTR-NUREG-1045 NUDOCS 8711030351
Download: ML20236G933 (2)


See also: IR 05000298/1987001

Text

_____ _ _ _

_

r

.

OCT 2 91987

In Reply Refer To:

SAFEGUARDS INFORMATION

Docket:

50-298/87-01

Nebraska Public Power District

ATTN: George A. Trevors

Division Manager - Nuclear Support

P. O. Box 499

Columbus, NE

68601

Gentlemen:

Thank you for your letter of April 28, 1987, in response to our letter and the

attached Notice of Violation dated March 30, 1987. As a result of our review,

we find that additional information, as discussed with your Mr. M. Hamm (during

a telephone call on October 22, 1987) is needed.

Specifically, the response to

the violation of inadequate security organization screening does not address

the matter of psychological testing for the supervisors.

In addition, the

discussion on inadequate compensatory measures does not acknowledge the

violation or reflect consideration of guidance, such as NUREG 1045, concerning

compensatory measures.

Please provide the supplemental information within 30 days of the date of this

letter.

Sincerely,

UrIginal Signed My

L J. . Callan

'

L. J. Callan, Director

Division of Reactor Projects

cc:

Cooper Nuclear Station

ATTN: Guy Horn, Division Manager

of Nuclear Operations

P. O. Box 98

Brownville, Nebraska

68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc:

(see next page)

(

I

RIV:RPS

j

C:RPSB

AC:PS/C

D:

P

JAFKell

LAYand

GLMadse

LJCallan

g

{D/p/87

[049/

ll (M/87

10 /d/87

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION.

UPON SEPARATION THIS

8AFEGUARDS INFORMATIDH

PAGE IS DECONTROLL

8711030351 871029

I

/p

{

PDR

ADOCK c5000298

0

PDR

j

>

_ _ _ _ _ _ _ _ _ _ _ ____ ___

_-_

j

e

.

Nebraska Public Power District

-2-

bec w/ copy of licensee's response w/ safeguards:

RIV Security File

P. A. Starcher, RSGB/NRR

Resident Inspector

R. D. Martin, RA

R. L. Bangart, DRSS

Security Inspector

Chief, RPSB

RPSB Security File

1

bcc w/ copy of licensee's response w/o safeguards:

-DMB IE-04

D. Weiss, RM/ALF

-

Section Chief (PS/C)

RIV File

MIS

RSTS Operator

i

RPSB

DRP

DRS

R. E. Hall, DRSS

Project Engineer, PS/C

,

W. Long, NRR Project Inspector

]

-

I

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION.

UPON SEPARATION THIS

PAGE IS DECONTROLLED.

_

a

.

..

.

p rg

coorn m,cuansinn m

211- Nebraska Public Power District

"" """t=0;tMN=T^ "'"

4 -

.=_

+====,=-n,

_ ,

- -.

, , - - - - _

CNSS874192

April 28, 1987

Wh80 2 panted ff0m fDCl0$UTM,

!Ladie his Doccment a Decontrolled.

Nuclear Regulatory Commission

Document Control Desk

Washington, D.C.

20555

Subj ect: NPPD Response to Inspection Report 50-298/87-01, Appendix A

Gentlemen:

This letter is written in response to your letter dated March 30, 1987,

transmitting Inspection Report 50-298/87-01. Therein you indicated that

certain of our activities were in violation of NRC requirements.

l

Following are the statements of the violations and our responses in

accordance with 10CFR2.201.

In accordance with the provisions of 10 CFR Part 73.21, we request'that the

attached report be treated as safeguards information and withheld from

public disclosure.

Should you have any questions regarding this response, please contact me or

G.R. Horn at the site.

Sincerely,

,

,

,

(Y.1dL

'A

,

,

G. A. Trevors

Division Manager of

Nuclear Support

GAT:JM:bs

cc:

U.S. Nuclear Regulatory Commission

Regional Office, Region IV

NRC Resident Inspector

Cooper Nuclear Station

L

W-19044-870428

PDR

ADOCK 05000298

fe

G

PDR

e

__ _-