Text
,
-
-- ---- ___ _ _
WA 3 0 B87
>
In Reply Refer To:
Docket:
50-285/87-15
Omaha Public Power District
ATTN:
R. L. Andrews, Divisicn Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs. P. H. Harrell and
R. P. Mullikin of this office during the period June 1 through July 15, 1987,
of activities authorized by NRC Operating License DPR-40 for the Fort Calhoun
Station, and to the discussion of our findings with Mr. M. R. Core and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included followup on previously identified
items, followup on licensee event reports, operational safety verification,
plant tours, safety-related system walkdown, maintenance, surveillance,
security observations, radiological protection observations, in-office review
of periodic and special reports, containment local leak rate testing, fire
protection / prevention program, observation of activities during plant startup,
and followup on items completed prior to plant startup.
Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
Also during this inspection, it was found that certain of your activities
appeared to deviate from a commitment made to the NRC.
This item and reference
to the commitment is identified in the enclosed Notice of Deviation.
You are
requested to respond to this deviation in writing.
Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter.
One unresolved item was identified during this inspection that was related to
determination of the effect of tendon grease on the seismic gap fire seals.
This unresolved item is discussed in paragraph 13.
h
(
RI: FCS
PI/FCS
C: RPf/
C:RPB
PHHarrell/nc
RPMullikin
RHunte
JEGagl a [
7g/87
7hf/ y
SD(
y/zt;/87
9 /p /87
'
/
'\\
B708040419 870730
'
ADOCK0500g5
i
G
i
_ _ - _ - _ _ - .
. . _ _ -
,-
3
Omaha'Public Power District
-2-
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed inspection report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Oridoc! S!cnad Cy
J. E. Gagibrdo
J. E. Gagliardo, Chief
Reactor Projects Brancn
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Inspection Report
50-285/87-15
cc w/ enclosures:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
- RRI
R. D. Martin, RA
- R&SPB
- Section Chief (RPB/B)
- MIS System
- RIV File
DRSP
- RSTS Operator
- RSB
- Project Inspector
- D. Weiss, RM/ALF
- R. Hall
A. Bournia (NRR)
- w/766