March 16, 1989 Docket No. 50-213 MEMORANDUM:
Lee H. Bettenhausen, Chief Project Branch 1 Division of Reactor Projects, Region 1 THRU:
John F. Stolz, Director Project Directorate I-4 Division of Reactor Projects I/II FROM:
Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II
SUBJECT:
TI 2515/65 (Rev I) - TMI ACTION PLAN REQUIREMENT FOLLOW-UP On February 13, 1989 I met with Chip Perkins (Northeast Utilities (NU)) to I
review NU's TMI file to provide the resident inspectors at Haddam Neck a status of the TMI Action Items referenced in TI 2515/65.
Enclosed is Appendix A from TI 2515/65 with the SER dates and where possible I have provided inspection reports where the item was verified, an amendment that closed the item or a status. Those items with question marks in the verify column need to be verified by the resident inspectors.
If there are any questions please call me at FTS 492-1313.
/s/
Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects I/II
Enclosures:
As stated cc:
T. Shediosky A. Asars q
i DISTRIBUTION Docket. File-PDRs Plant File S. Norris A. Wang J. Stolz
[MEMOLBETTENHAUSEN]
LA: DI-4 PM:PDI-4 PD.P
-4 AWang:Im[d JSto I
Sf rs 03/(5/89 03/Is/89 03//(g/89 0(
\\
8903230439 890316 PDR ADOCK 05000213 P
PNV
)
y
l j
APPENDIX A FROM TI 2515/65 (REV I)
TMI Action Title SER Verification Plan Item 1
I.A.1.1 Shift Technical Advisor
.1.1 On Duty 8/28/88 N/A
.1.3 Training 8/26/88 N/A I.A.I.2 Shift Supervisor Admin.
5/7/80
?
Duties 5/7/80
?
I.A.I.3 Shift Manning
.3.1 Limit Overtime 12/10/85 Amendment 71
.3.2.A Min. Shift Crew /
12/10/85 Implement. Reqmt.
I.A.2.1.4 Upgrade R0 & SR0 12/15/82 IR 82-19 Training & Qual./
Modify Training I.C.1 Short-Term Accident &
Proced. Review
.1.1 Small-Break LOCA 8/19/86
?
.1.2.B Inadequate Core Cooling /
9/86 IR 87-02
.1.3.B Revise Procedures 4
.1.3.B Transients & Accidents /
9/86
?
Revise Procedures I.C.2 Shift Relief & Turnover 5/7/80
?
Proced./ Implement Shift Turnover Checklist I.C.3 Shift Supervisor Responsib.
5/7/80
?
Define Supvr. & Oper.
Responsibilities I.C.4 Control Room Acces/ Establish 5/7/80 N/A Authority Limit Access
q r
i TMI Action
- Title SER Verification Plan Item-l I.C.5 Feedback of Operating 2/8/82 NEO 5.08 Experience /Licente to
-l
~
Implement Procedures
\\
I.C.6 Verify Perf. of Operating 2/8/82 IR 83-27 Activities / Revise Perform-j ance Procedures l4 I.D.2 Plant Safety Parameter Display Console
.2.2 Installed 10/21/88
?
.2.3 Fully Implemented 10/21/88
?
II.B.1 Reactor Coolant System Vents
?
.1.2 Install Vents 6/5/84 IR 88-15
.1.3 Procedures ISAP IR 88-15, 87-02 l
1 II.B.2 Planting Shielding
.2.2 Plant Modifications / Modify 7/26/83 IR 83-12
.2.3 Equipment Qualification 8/85
?
l II.B.3 Post-accident Sampling i
l f
l
.3.1 Interim System 6/5/84
?
.3.2 Plant Modification / Modify 6/5/84
?
k l
II.B.4 Training for Mitigation Core Damage l
.4.2 Implement Program 12/15/82 IR 82-12
.4.3.A Initial 12/15/82 IR 82-12
.4.2.B Complete 12/15/82 IR 82-12 II.D.3.1 Valve Position Indication 5/7/80
?
Install DF Indic, of Valve l
Position II.E.1.1 Auxiliary Feedwater System Eval.
.1.1 Short Term 11/9/82
?
.1.2 Long Term 11/9/82
?
j i
l 1
3-9 TMI Action Title SER Verification Plan-Item,
II.E.1.2 Aux. F/W Initiation & Flow
.2.1 Initiation 10/5/82
?
.2.1.A Control Grade 10/5/82
?
.2.1.B Safety Grade / Implement 10/5/82
?
.2.2 Flow Indication 10/5/82
?
.2.2.A Control Grade 10/5/82
?
.2.2.C Safety Grade / Implement 10/5/82
?
1 II.E.3.1.1 Emergency Power for 5/7/80
?-
Pressurizer Htrs/ Upgrade Power Supply II.E.4.1 Dedicated Hydrogen Penetration
.4.1.1.B
. Recombined Procedures Reviewed 5/7/80
?
& Upgraded
.4.1.2 Install 9/3/81
?
II.E.4.2 Containment Isolation i
Dependability i
.2.1-4 Imp. Diverse I' solation 5/7/80
?
.2.4.B Containment Pressure Setpoint/ 12/18/81 N/A
{
Modifications i
.2.6 Containment Purge Valves /Impl.
10/4/82 N/A 4
.2.7 Radiation Signal on Purge 10/4/82 N/A
]
Valves J
II,F.1 Accident Monitoring
.1.1.A Noble Gas Monitor / Interim 11/23/81 10/83 Inspection
.1.1.B.2 Long Tenn/ Implement 11/23/81 10/83 Inspection
.1.2.A Iodine / Particulate Sampling 11/23/81 10/83 Inspection (Interim)
.1.2.B Long Term / Implement 11/23/81 10/83 Inspection
.1.3 Containment High Range Monitor 1/15/82
?
.1.4 Containment Pressure 7/9/85 EQ open
.1.5 Containment Water Level 7/9/85 EQ open
.1.6 Containment Hydrogen Open (ISAP)
II.F.2 Instr. for Detect. of Inadeq.
12/16/86
?
Core Cooling
.2.1.A Subcooling Meter / Meter Installed 12/16/86
?
& Proced. Developed
.2.3 Install Level Instruments 10/21/88
?
I
~
TMI Action.
Title SER Verification Plan Item i
II.G.1.1.
Power Suppl. for Press. R/V, B/V 5/7/80
?
LVL Ind./ Upgrade to Emergency Sources II.K.1 IE Bulletins
.1.1 79-05,79-05A, 79-05B (B&W)
N/A
N/A
.1.3 79-06,79-06A, 79-06A, Rev. 1 (W) 6/84 N/A
.1.4 79-08 (BWR)
N/A II.K.3 Final Recommendations, B&O Task Force
.3.1.B Auto PORY Isolation-Test / Install 9/9/83 N/A
.3.5.B Auto Trip of RCPS/ Modify Open (MPAG-01)
.3.9 PIC Controller N/A
.3.10 Proposed Anticipatory Trip 11/30/81 IR 87-02 3
Modification i
.3.12.B Anticipatory Trip on Turb. Trip /
Open
?
Modify (ATWS)
.3.2.5 Power on Pump Seals Open (ISAP)
III.A.I.2 Upgrade Emergency Support Fac./
.2.1.A TCS and EOF 6/23/86 Full scale
.2.1.B OSC 6/23/86 emergency
.2.3 Modifications 6/23/86 exercises '85,
'86 and '88 reports III.D.1.1.1 Primary Coolant Outside Contain-5/7/80 Amendment 73 ment / Leak Reduction III.D.3.3 Inplant Radiation Monitoring
.3.1 Provide Means to Detect Radio-6/29/82 10/83 Inspection Iodine
.3.2 Mod, to Accurately Measure 7/20/82
?
Iodine III.D.3.4 Control Room Habitability /
ISAP Modification (OPEN) 3