__

INSTRUNENTA7!0N g

3/4.3.8 TUR81NE OVERSPEED PROTECTION SYSTEN 3

LINITING CONDITION FOR OPERATION 3.3.8 At least one turbine overspeed protection system shall be OPERABLE.

APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.

~

l ACTION:

With one turbine control valve, or one turbine stop valve per high pressure turbine steam lead inoperable and/or with one tudine low a.

pressure stop valve or intercept valve per low pressure turbine steam lead inoperable, restore the inoperable valve (s) to OPERABLE

^

status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or close at least one valve in the affected steam lead (s) or isolate the turbine from the steam supply within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With the above required turbine overspeed protection system otherwise b.

inoperable, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> isolate the turbine from the steam supply.

SURVEILLANCE REQUIREMENTS 4.3.8.1 The provisions of Specification 4.0.4 are not applicable.

4.3.8.2 The above required turbine overspeed protection system shall be demonstrated OPERABLE:

At least once per 7 days by cycling each of the following valves l

a.

through at least one complete cycle from the running position and observing valve closure:

1.

Four high pressure turbine stop valves, 2.

Six low pressure turbine low pressure stop valves, i

3.

Four high pressure turbine control valves, and 4.

Six low pressure tusine intercept valves.

At least once per 18 months by performance of a CHANNEL CALIBRATION b.

(

of the turbine overspeed protection instrumentation.

I At least once per 40 monthf by dismantling and inspecting at least c.

one of each of the above valves and performing a visual and surface inspection of all valve seats, disks, >.nd stems and verifying no If unacceptable flaws or unacceptable flaws or excessive corrosion.

excessive corrosion are found, all other valves of that type shall be inspected.