ML20236D619
| ML20236D619 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/17/1989 |
| From: | Widell R FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 2F0389-15, 2F389-15, NUDOCS 8903230192 | |
| Download: ML20236D619 (2) | |
Text
,
1
)
6
[q I
{
Power i
CORPORATION l
March 17, 1989 l
)
Document. Control Desk U.
S.
Nuclear Regulatory Commission i
Washington, D.C.
20555 l
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 l
NUREG 0737,. Supplement 1 l
Detailed Control Room Design Review (DCRDR)
Dear Sir:
t t
Florida Power Corporation (FPC) is submitting this letter to correct response number 4 in our letter dated October 18, 1988.
FPC performed a review of all indicating lights on the main control board which are normally off.
Eight safety-related indicating lights with single filament bulbs without test capability and normally off were found.
We stated that these indicating lights also had associated annunciator j
points.
FPC has subsequently identified that two of the eight indicating lights do not have associated annunciator points; namely Diesel Generator A Parallel Block and Diesel Generator B Parallel Block indicating lights.
The tabulation of lights versus associated annunciator description is as follows:
Indicatina Licht Annunciator Description DG A Block Close Actuated-3205 4KV ESA Cross - Tio Blocked
)
(Window SSF-A2-3-4)
N DG A Block Close Actuated-3207 l
800 y@a DG A Block Close Actuated-3211
\\
0 So DG B Block Close Actuated-3206 4KV ESB Cross - Tie Blocked gg (Window SSF-A2-7-4) i.
Os o o8 DG B Block Close Actuated-3208 l
@Gg DG B Block Close Actuated-3212 P@}
oc
. GENERAL OFFICE: 3201 Thirty fourth Street South a
P.O. Box 14042
]
l g.
~ March.17,.1989-l
- 3F0389-15 l
Page 2
'l l
.)
I
^
In f order..'to correct this deficiency FPC plans to add' two indicating lights, one for Diesel Generator A Parallel Allowed and one'for Diesel Generator B Parallel Allowed.
The Parallel' Block.or Parallel-Allowed indicating. light for each Diesel Generator.would remain lit'at all'-
times.
The schedule'for the' installation.'of.these'two new lights is Refuel-7.
Should there be any questions, please contact this office.
Sincerely, q
l l
Rolf C. Widell, Director Nuclear Operations Site Support l
RCW/EMG/sdr-
)