MONTHYEARML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 ML20198J0921997-09-18018 September 1997 Safety Evaluation Authorizing Licensee & Suppls & 16 Request for Approval of Alternative Reactor Vessel Weld Exam,Per 10CFR50.55a(g)(6)(ii)(A)(5) for Plant, Unit 2 for Next 2 Operating Cycles ML20198H2351997-09-0808 September 1997 Safety Evaluation Approving Licensee 970311 Request for Use of ASME Code Case N-509 & Relief from ASME Code Section IX Requirements for Exam of Hpcip Studs for Plant,Units 1 & 2 ML20137A4831997-03-18018 March 1997 SER Re CP&L Review of Power Uprate Process & Commitment Preventing Operation at Uprated Power Levels for Plant, Units 1 & 2 ML20129E0821996-09-26026 September 1996 Safety Evaluation Supporting Request to Use Certain Portions of Later Edition of ASME Code for Inservice Leakage Testing Valves for Brunswick Steam Electric Plant Units 1 & 2 ML20056D6761993-07-28028 July 1993 Safety Evaluation Concluding That Interior Masonry Walls May Be Downgraded to non-fire Related ML20128K7711993-02-11011 February 1993 Safety Evaluation Granting Relief from Certain Inservice Testing Program Requirements for Several Pumps & Valves ML20198E5081992-11-23023 November 1992 Safety Evaluation Accepting Licensee 120-day Response to Suppl 1 to GL 87-02 ML20246D6811989-08-18018 August 1989 Safety Evaluation Supporting Installation & Design of Nitrogen Pneumatic Sys,Per Generic Ltr 84-09,by Adding New Check Valves to Existing Drywell Noninterruptible Instrument Air Lines ML20246C4201989-06-27027 June 1989 SER Accepting Util Response to Generic Ltr 83-28,Item 4.5.3 Re Reactor Trip Sys Reliability for All Operating Reactors ML20247P6201989-06-0101 June 1989 Safety Evaluation Supporting Util SAFER/GESTR-LOCA Analysis ML20247M1911989-05-25025 May 1989 Safety Evaluation Re Denial of Amend Request to Licenses DPR-71 & DPR-62 ML20246P9401989-05-10010 May 1989 Safety Evaluation Accepting Plant Second 10-yr Interval Inservice Insp Program ML20246J5531989-05-0909 May 1989 Safety Evaluation Concluding That Plant Can Be Safely Operated for Another 18-month Fuel Cycle in Configuration Following Reload 5,per Improvements,Insps & Repairs to Plant IGSCC ML20245D3761989-04-25025 April 1989 Safety Evaluation Supporting Licensee IGSCC Program for Refuel 7 Outage ML20236D5481989-03-17017 March 1989 Safety Evaluation Accepting Util Response to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys Reliability ML20236D5381989-03-17017 March 1989 Safety Evaluation Accepting Util 831107 Response to Generic Ltr 83-28,Item 2.2.1 Re Equipment Classification Programs for safety-related Components ML20236D4641989-03-15015 March 1989 Safety Evaluation Re Generic Ltr 83-28,Item 2.1 (Parts 1 & 2) Concerning Equipment Classification & Vendor Interface for Reactor Trip Sys Components ML20235Z2841989-03-0808 March 1989 Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Items 3.2.1 & 3.2.2 ML20235Z3451989-03-0808 March 1989 Safety Evaluation Supporting Util Compliance W/Atws Rule, 10CFR50.62 Re Power Testability Features of Alternate Rod Insertion Sys & Recirculating Pump Trip Design ML20235M5771989-02-16016 February 1989 Safety Evaluation Supporting Control Room Habitability Sys of Plant & Acceptability of Existing Tech Spec Re Control Room Pressurization Requirement ML20147G0661988-03-0202 March 1988 Safety Evaluation Supporting Proposed Functional Testing Plan for Snubbers ML20236D1311987-10-22022 October 1987 Safety Evaluation Re Util Request for Relief from Schedular Requirements for Performance of Visual Insp & Hydrostatic Test of CRD Withdrawal & Insert Lines.Granting of Request Recommended ML20235A7331987-09-18018 September 1987 Safety Evaluation Re Installation of Alternate Rod Injection (ARI) Sys & Adequacy of Plant Reactor Coolant Recirculating Pump Trip (RPT) Sys,In Compliance W/Atws Rule 10CFR50.62. ARI & RPT Acceptable NUREG-0661, Safety Evaluation Re Util 840831 Submittal of Addendum to Plant Unique Analysis Rept on Mark I Containment Mod Program.Safety/Relief Valve Load Cases C3.2 & C3.3 Adequately Addressed & Resolved1987-05-0707 May 1987 Safety Evaluation Re Util 840831 Submittal of Addendum to Plant Unique Analysis Rept on Mark I Containment Mod Program.Safety/Relief Valve Load Cases C3.2 & C3.3 Adequately Addressed & Resolved ML20212H5671987-01-16016 January 1987 Safety Evaluation Supporting Util Response to Generic Ltr 83-08 Re Restoring Safety Margins of Vacuum Breakers by Replacing Critical Parts W/Adequate Matls ML20207A8531986-11-0505 November 1986 Safety Evaluation Supporting Operation for Full Fuel Cycle W/O mid-cycle Insp for Crack Growth ML20215N3771986-10-30030 October 1986 Safety Evaluation Re Util 860320 Response to Generic Ltr 84-09, Recombiner Capability Requirements of 10CFR50.44(c)(3)(ii). Licensee Should Remove All Potential Oxygen Sources from Containments ML20203N0081986-09-17017 September 1986 Safety Evaluation Supporting Util 850919 Request for Relief from Installing Excess Flow Switch & Automatic Shutoff Valve in Diesel Fire Pump Fuel Line to Provide Protection in Event of Fuel Line Rupture ML20212N0201986-08-22022 August 1986 Safety Evaluation Denying Util 860325 Request for Relief from Inservice Insp Requirements of ASME Code Section XI, Table IWC-2500-1 for Volumetric Exam of HPCI Pump Studs ML20211G6081986-06-12012 June 1986 Safety Evaluation Supporting IGSCC Insp,Repair & Replacement Program During Dec 1985 Refueling Outage ML20205S2541986-06-0404 June 1986 Safety Evaluation Accepting Rev 2 to Nuclear Const Issues Group Spec 1, Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants, for non-ASME Code Welds ML20211A8281986-06-0303 June 1986 Safety Evaluation Re Rev 4 to Offsite Dose Calculation Manual.Rev Acceptable ML20198S7281986-05-29029 May 1986 Safety Evaluation Supporting 851203 Proposal to Modify Tech Spec 3/4.5.3 to Clarify Min Amount of Condensate Storage Tank Water Required to Ensure Operability of Core Spray Sys During Operating Conditions 4 or 5.Rev to Tech Specs Encl ML20133N4141985-10-23023 October 1985 Safety Evaluation Re Util 831107 & 850828 Responses to Generic Ltr 83-28,Items 3.1.2 & 3.2.1 & 850701 Request for Addl Info.Responses Re Vendor & Engineering Test Guidance & Testing Requirements After Maint Acceptable ML20134P5211985-08-28028 August 1985 Safety Evaluation Approving Use of ASME Code Case N-411 for Damping Curves ML20128M2911985-07-16016 July 1985 Safety Evaluation Supporting Licensee Response to Generic Ltr 83-28, Salem ATWS Event, Items 3.1.3 & 3.2.3 Re post-maint Testing 1999-08-05
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
. ,
' ' T,,[
ok UNITED STATES g '
g NUCLEAR REGULATORY COMMISStON -
a .- wasmNGToN, D. C.20665 N...../ '
tj
.q SAFETY'EVALVATION BY THE'0FFICE OF NUCLEAR REACTOR REGULATION-l BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1&2 DOCKET NOS. 50-324/325 REGARDING GENERIC LETTER 83-28, ITEM 2.2.1 EQUIPMENT CLASSIFICATION PROGRAMS FOR ALL SAFETY-RELATED COMPONENTS
1.0 INTRODUCTION
Generic; Letter (GL). 83-28 was issued by 'the Nuclear Regulatory Commission (NRC) .on July 8,1983.to indicate actions:to be taken _ by. licensees and l; applicants based on the generic implications of the Salem ATWS events.
Item 2.2.1 of that letter states that licensees and' applicants shall ing all describe in considerable safety-related components otherdetail their than program Reactor for_ classify (RTS) components Trip' System as safety-related on plant documents and in information handling systems-that are used to control plant activities' that may affect these components.
Specifically, the licensee / applicant's submittal was required to contain information describing: -(1) the criteria used to identify:these components as safety-related; (2) the information handling system which identifies l the components as safety-related; (3) the manner in which station l personnel use this information handling system to control activities l affecting these ' components; (4) management controls that are used to verify that the information handling system is prepared, maintained, validated, and used in accordance with approved procedures; and :(5) design verification and qualification testing requirements that'are part of the specifications for procurement of safety-related components.
The licensee for the Brunswick Steam Electric Plant, Units 1 and 2,. 1 submitted a response to GL 83-28, Item 2.2.1, in a submittal dated l November 7,1983. We.have evaluated that response as follows.
2.0 EVALUATION
.l In the evaluations which follow, the licensee's' responses-to the program and each of five sub-items are individually evaluated against-guidelines l developed by the NRC staff. Conclusions'are made regarding their '
individual and collective acceptability.
- 1. Identification' Criteria l Guideline: The licensee's response should _ describe the criteria used to identify safety-related equipment and components.
(Item 2.2.1.1)
M[2ggy $$
- P l
t Evaluation:
{ The licensee's response included from Volume XI, Book 2 of the Plant Operating Manual, the criteria used to identify safety-related equipment and components.
Conclusion:
The criteria used is acceptable.
- 2. Information Handling System Guideline: The licensee's response should confirm that the equipment classification program includes an information handling system that is used to identify safety-related equipment and components. Approved procedures which govern its development, maintenance, and validation should exist. (Item 2.2.1.2)
Evaluation:
The licensee's response indicates that the information handling system is the means by which the Q-list is maintained. The Q-list ..
identifies the portion of. systems, instruments, and the special components of systems that are safety-related.' The Q-list is part of the Plant Operating Manual, a controlled document, which was developed under the guidance of ANSI 52.1-1978 and the information contained in the Final Safety Analysis Report (FSAR). This system will continue to be used until a new detailed, computerized classification database is established and implemented.
Conclusion:
The licensee's response meets the staff requirements and is l
. a acceptable.
- 3. Use of Information Handling System Guideline:' The licensee response should confirm that their equipment class 1Heation program includes criteria and procedures which govern the use of the information handling system to determine that an activity. is safety-related and that safety-related procedures for maintenance, surveillance, parts replacement and other activities defined in the introduction to 10 CFR Part 50, Appendix B, are applied to safety-related components. (Item 2.2.1.3).
Evaluation:
l The licensee's response describes plant procedures which govern '
maintenance, modification, and procurement activities. These . .
procedures require that safety-related components be identified and l
)
I
)
l t . .
specific instructions for Q-listed components be included on Work Requests and Authorizations. Where no procedure exists governing an activity performed on a safety-related component, the Maintenance Engineer prepares safety-related instructions in accordance with approved plant procedures. Procurement procedures ensure that Q-listed parts and materials are appropriately identified, procured, and handled. Plant modification activities are controlled by an approved engineering procedure which requires that safety-related equipment be identified as Q-list and that the requirements of the corporate QA Manual and other applicable documents be implemented in the modification procedures.
Conclusion:
The licensee's response describes a program that is acceptable.
- 4. Management Controls Guideline: The licensee / applicant should confirm that management controls used to verify that the procedures for preparation, <
validation, and routine utilization of the information handling system have been, and are being, followed. (Item 2.2.1.4)
Evaluation:
The licensee's response states that procedures and instructions that affect Q-list (safety-related) components are controlled documents that receive certain management reviews and approvals prior to implementation of new or revised versions to assure technical correctness and conformance to applicable requirements. In addition, periodic QA surveillance and audits are performed to assure management that these documents are properly prepared, revised, and implemented in the plant.
Conclusion:
This description of the licensee's program of management controls meets the staff requirements and is acceptable.
- 5. Design Verification and procurement Guideline: The licensee / applicant's response should document that past usage demonstrates that appropriate design verification and qualification testing is specified for the procurement of safety-related components and parts. The specifications should include qualification testing for expected safety service conditions and provide support for licensee's receipt of testing documentation which supports the limit of life recommended by the supplier. If such documentation is not available, confirmation that the present program meets these requirements should be provided. (Item 2.2.1.5)
i Evaluation: l The licensees's response stated that procurement documentation for safety-related (Q-listed) replacement parts and components are given i two separate reviews by different plant groups to assure the i inclusion'of appropriate specifications, QA requirements, design l l review requirements, and qualification testing requirements in these l
- documents. For safety-related parts, certification requirements and l 10 CFR Part 21 provisions are required to be included on the l procurement documents. l l
Conclusion:
This information describes the licensee's program which meets staff ;
requirements and is acceptable.- )
i
- 6. "Important To Safety" Components Guideline: GL 83-28 states that licensee / applicant equi) ment i classification programs should include (in addition to tie !
safety-related components) a broader class of components designated .!
as "Important to Safety." 'However, since the generic letter does i not require licensce/ applicant to furnish this information as part {
of their response, our review of this sub-item will not be performed. 1 (Item 2.2.1.6)
- 7. Program Guideline:
Licensees / applicants should confirm that an equipment classification program exists which provides assurance that all safety-related components are designated as safety-related on plant documents such I as drawings, procedures, system descriptions, test and maintenance ;
instructions, operating procedures, and information handling systems so that personnel who perform activities that affect such safety-related components are aware that they are working on safety-related components and are guided by safety-related procedures and constraints. (Item 2.2.1)
Evaluation: >
The licensee's response to these requirements included information that described their program for classification of safety-related equipment and components. This program contained all the features required to meet the staff concerns for this issue.
CONCLUSION:
The licensee's program classification of safety-related equipment and i components is acceptable.
Principal Contributor: N. Trehan Dated: