ML20236D517

From kanterella
Jump to navigation Jump to search
Confirms 870706 Telcon Re 870804 Meeting W/Util at Region Ii.Meeting Requested to Discuss Recent Study Performed to Determine Reliability of Both RCIC & HPCI
ML20236D517
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 07/15/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8707300498
Download: ML20236D517 (1)


Text

.

.- -p

.n y

1985

Carolina'. Power and O ght Company-LATTN
Mr. E. E. Utley ;

'C Senior Executive'Vice Pres'ident Power. Supply and Engineering

..and Construction.

P.'~0. Box 1551-cRaleigh, NC: 27602a p

Gentlemen:

-A

SUBJECT:

CONFIRMATION OF. MEETING <- DOCKET NOS. 50-325 AND 50-324'

This confirms. the telephone conversation between_ C. Dietz. of your staff and P. E. Fredrickson of this officeL on. July 6.1987; concerning a meeting. to be conducted at
the Region.II office on August,4, 1987Lat.9:30.a.m.

You requested-this meeting to discuss the recent. study performed.tofdetermine the. reliability 4' of both the ' Reactor.. Core' Isolation ~ Cooling (RCIC) and High Pressure. Coolant Injection (H.PCI)! system.

'Should you have'any questions.regarding these arrangements, we_will be pleasedi to~ discuss them.

Sincerely,

/

Sj '

Add 'Y1 b m

Luis'A.-.Reyes, Director Division of Reactor Projects cc: tPT W. Howe, Vice President Brunswick Nuclear Plant LC'. R. Dietz, Plant ' General Manager

'bec:,BRC Resident Inspector l ocument Control Desk State of North Carolina

/dk

.i y

RII R11 RII RIINM-h SVias:vyg PFr r1ckson DVerrelli VBrownlee 7/g/87 7/g/87 7/d/87 7/H/87 8707300498Ohh241 PDR ADOCK O PDR A" O

P fp n