00:43 FRC RI DOCKET ROOM FO.419 P002 g#
UNITEO STATES k
NUCLEAR REGULATORY COMMISSl N g
MEGM)N i j
478 ALLeNOALe ROAD e
- KING OF PRutel A.PeNNevLVANIA tedee
- 4 gy
....e Docket No. 50-54 01 DEC 1988 I
Cintichem, Inc.
ATTN: Mr. James J. McGovern Plant Manager P. O. Box 816 Tuxedo, New York 10987 Ge n t.i nen.
Subject:
Site Access for NRC Inspectors A letter was sent to all Nuclear Utility Executives from the NRC Executive -
Director for Operations on November 17, 1988 concerning a new rule which.
_.r_
__ became effective on October 25, 1988. The letter bears.directly on conver :-
sations we have held concerning NRC inspector's access to your facility.
~
A copy of the cover letter is provided as Attachment 1.
If you have not received the letter and would like copies of the enclosures to the letter please contact me at 215-337-5225.
Sincerely, f
f32 Edward C. W nzinger, Projects Branch No.
Division of Reactor s
Letter from,V. Stello (without enclosures) to Nuclear Utility i
Executives dated November 17, 1988 cc:
W. G. Ruzicka, Nuclear Operations Manager
$f44FR47918
.pupw ue 40 pp., in wuu iuun ru. 4w -
suuu.
~
i
[
ATTACHMENT 1 UNITt0 GT ATit NUCLE AR REGULA. TORY COMMl8811N '
.,f f
m e.nwovow.s.a.eente l
l
'a **
WOV111988 Nuclear Utility Executives Aentlemen:
l The purpose of this letter is to advise you of three issues of current regular tor / significance, specifically; a new rule effective October 25,1988,-
concerning the announcing of the presence of a3 NRC inspector at a nuclear power plants a revision to the NRC enforcement policy effective October 14.1 1988; and the recently proposed enforcement actions for sperator inattentive-ness at Philadelphia Electric Compary's Peach lettom Atomic Power Station.
The new rule on announcing the presence of an NRC inspector will modify j
10 CFR 50.70 and is as-follcws:
-The licensee or construction permit helder (nuclear power reactor only) shall ensure that the arrival and presence of
~~
an NRC inspector, who has been properly authorized f acility e
access as descrieec ir paragraph (b)(3) of th'is section, is not announced cr otherwise communicated by its employees or contractors to other perscr.s at the facility unless specifically requestec by the Nr.C inspector..
1 This rule should ensure.ttat hE: ir.spectors will be granted unannounced access tc licensee f acibties envitalert te that previcee a regular plant er:ployee.
This ruit providet that ne access contrel measures or other means Ny be cmployed by the licar.see or its contractors to intentionally give notice to other persons of the ar'ivel anc presence of a NRC inspector, unless the licensee is specifica11., recuestec to oc so by the inspecter.. There have beer instances it, tre past at several facilities that compromised the ability P prCat'1) 44 Cit: f M 1r1lt:U's 10 instect and accels, oh ar unannnunrPr.
1 basis, activities rt'iatte-tc tre license ce constructier. perrit when liter. set erployees et cortracter e..;1ey ees ir.'crne ettors at the f acility of tne prestr.ct c' tre h*: ir s;t etcr s.
"ris chargt to 10 CFR 50.7( is te cle'"
that NR: inspectors, bac;te at tte f acility, have irrnediate, unescortec access to ongoing activitics as sttst activitics are being performed withowt asiancet notification of the inspectier. This is especially impcrtant durir'5 non-norr al business hours e ar. operatir.g personnel might assuma NRC inspectors wowle not be on site. Recognizing ti.
of an inspector's presence,t possibility of 164dytetent er tuvel comniptigt the hkC expects tc reserve enforcement actier "or s ig t.1 f i c a r.
intertiotal sic'.stions of this rulr. An herest resper.se by ar.
employee to ar. ir.nocer.t incviry that he/she,nst saw an NR inspector is.not.
within the confines c' ttis rule.
Tn irrrene the inten.ives fe licerssst tc, scrutinize their operatiors with.
out depending on h;.' ir t'..er.ea.t. the Cercissict has revisec its Enforcement Folicy to provide t'e sit'f witr ac'citienti circumstances where discrettor car te ap;ite.c r.ct tc iss.e a civil par.4'ty f er sigt.ificant ticletters at s' l
._._.___m__
Wy
,p.
t f
9,g g9 g awcism. utility Fantal11ves ed where Severity Level III., For ersuple, civil penalties sight not be propo esult a licenser (destifies, fa&pris, and torrects safety deficiencies as s such as those isng1ving engineer.
It is importsnt 1tr emphastze that the Trincipal
. ~of pursuing a prograss to addrass past error incentives objective of this change.to the Enforcement Poliry is to provide or installation.
i for licensees to identffy, report, and servect safe
-ing, design Inclosedfor better evaluation of :the significance of.spfeguards violations..
initiative.
l with the tiotice your information is the revised NRC Enforcement Policy A ong 14,.1988.
that was published in the Tederal Retister on October ctions for As you are probably aware, the NRC recently Troposed enforc bloms at phile.
the long-standing and pervasive operatof inattentiveness Tre These actions delphia Electric Corcarj's Psact Ecttom Atoeic Pow the I have enclosed l
first ever proposee civil penalties for Itcensed operators.l d l hia Electric C
, a copy of the action pre;: set against Phi a e p These actions.are
~-
~
examples of the preocles actions against the aperators.to ensure that you l
being sent to you to er.pn1512s' yo:.r resprinsibi ity; lice e
and that your operaters are atteetive to. duty.
tne public healin erg safety.
i f these 1 tepe that this ir.fr watic* wili laad to a better understand r.; o l
recent, regulatery actiers.
l Lir.cerely, n f!
1 A r'/'
Al i
cter Stelje, J;/
Laacuttwa Director for Operrtin's Inclosures:
i:b:
4evisee hi: Infoace-et 1.
eff ective C>:te:e-N, 31!
Inforsevent Actions Asso:utet 2
with Peact..icito'. Ato-u Power Statist 4
se m__..m.m.__.__._
_____