ML20236C605
| ML20236C605 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/16/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| Shared Package | |
| ML20236C608 | List: |
| References | |
| NUDOCS 8710270268 | |
| Download: ML20236C605 (2) | |
See also: IR 05000424/1987056
Text
1
.
f
hcicd
>
'l
OCT 161987
b
Docket No. 50-424
License No. NPF-68'
8, 6
!$
m
Georgia Power Company
er
c3
ATTN:
Mr. James P. O'Reilly
5
>
-Senior Vice President-Nuclear
w
Operations
@
P. O. Box 4545
aU
Atlanta, GA 30302
Gentlemen:
J
SUBJECT:
NRC INSPECTION REPORT NO. 50-424/87-56
This refers to - the Nuclear Regulatory Commission (NRC) inspection conducted
by Messrs. J. F. Rogge,
C. W. Burger, and
R. J. Schepens on September 4 -
(
October 7,1987.
The inspection included a review of activities authorized
i
'
for. your Vogtle facility.
At the conclusion of. the inspection, the findings
were discussed with those members of your staff identified in the enclosed
inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection. findings indicate that certain activities violated NRC require-
ments.
The violations described in the enclosed Inspection Report are under
consideration for escalated enforcement action.- Accordingly, no Notice of
Violation for these violations are being issded at this time, and no response
is required,
However, please be advised that the characterization of the
violations described in the enclosed Inspection Report may change as a result
of further NRC review. You will be advised by separate correspondence of the
results of our deliberations on this matter.
Additionally, an enforcement
conference has been scheduled for October 21, 1987, in the Region II offices.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8710270268 971016
ADOCK 05000424
.l. IRLSON C . .'
O
J. Nelson Grace
Regional Administrator
Enclosure:
(See page 2)
'\\
B6 cl
- _ _ - _ _ _ _ _ _ _
-
-.
i
.
.. -
1
j
..;
e
i
Georgia Power Company
2
f
OCT 101987
j
i
.
.
i
Enclosure:
!
NRC Inspection Report
cc w/ enc 1:
P. D. Rice, Vice' President, Project
Director
C. W. Hayes, Vogtle Quality
!
Assurance Manager
.G. Bockhold, Jr., General Manager,
Nuclear Operations
L. Gucwa, Manager, Nuclear Safety
j
and Licensing
_
J. A. Bailey, Project Licensing
j
'
Manager
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
J. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
D. Kirkland, III, Counsel,
Office of.the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
M. B. Margulies, Esq., Chairman,
!'
Atomic Safety and Licensing Board
Panel
Dr. O. H. Paris, Administrative Judge
j
Atomic Safety and Licensing Board
Panel
G. A. Linenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
Panel
bec w/ enc 1:
I
E. Reis, OGC
M. Miller, NRR
M. Sinkule, RII
NRC Resident Inspector
!
Document Control Desk
(
'
State of Georgia
i
<
i
RII
RII
RII
RII
RII
RII,pyg
y&
iulb,,sy
p4p; i
da)
-
,
VLBrownfeei
,y,
LAReyes
GRJenk ns
FBalmiin:ht
MVSinkule
TAPeebl s
10/16/87
10/ -/87
10/jp/87
10/g/87
10/g/87 10//f/87
l
I
1
________-_-____d