ML20236B306

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/87-21 & 50-414/87-21.Repts Redistributed to Compensate for Administrative Oversight
ML20236B306
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/23/1987
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20236B310 List:
References
NUDOCS 8707290052
Download: ML20236B306 (1)


See also: IR 05000413/1987021

Text

_

._

_

,

.

,

I

)

-

..8

j

l

July 23, 1987

Docket Nos. 50-413, 50-414

l

License Nos. NPF-35, NPF-52

i

l

Duke Power Company

tATTN: Mr. H. B. Tucker, Vice Pres? dent

,

Nuclear Production Department

!

l

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-413/87-21 AND 50-414/87-21

Due to an administrative oversight, NRC Inspection Report Nos. 50-413/87-21 and

(

50-414/87-21 was improperly distributed.

To compensate for this oversight,

this report is being redistributed.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(original signed by G. Belisle)

Caudie A. Julian, Chief

Operations Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report and Transmittal

Letter dated 7/16/87

cc w/ encl:

L(, W. Hampton, Station Mananer

Se'nior Resident Inspector - McGuire

bec w/ encl:

LX. N. Jabbour, NRP,

V-WRC Resident Inspector

Document Control Desk

State of South Carolina

l

RII

IJ t

RI

RII

RII

'

t

,/

-

i

G lisle:btm

A<

g

M h mlock

Peebles

C

an

7/2f/87

7/27/87

7/ 23/87

7/p /87

7//)/87

1

ho? l0@cx osooo,33

52 B70723

0

PDR

N

c____--_____-