ML20236B209

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request for Record.App a Record, Consisting of NRC to Util Requesting Addl Info Re IE Bulletin 85-003 Encl & Available in PDR
ML20236B209
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/21/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Graber L
NUS CORP.
References
FOIA-87-681 IEB-85-003, NUDOCS 8710260012
Download: ML20236B209 (2)


Text

_ _ _ -

U.S. NUCLEAR R ULATORY COMMISSION NAc Foia s.EoUEST NUMBEnt3)

F01A-87-681

[)

,\\,

siseonse Tyra M "^'

I l'**"^'

'l RESPONSE TO FREEDOM OF

  • g INFORMATION ACT (FOIA) REQUEST g gy g esese DOCKET NUMBERIS) W em4csw RtQUISTim Mr. Lyle Graber PART 1.-RECORDS RELEASED OR NOT LOCATED (See checked boxesl No agency records subsect to the request have been located.

No additonal agency records subject to the request have been located.

Agency records subsect to the request that are identified in Appendix are abnedy available for public irspection and copying in the NRC Public Docwnent Room, 1717 H Street, N W., Washington, DC.

Agency records ete set to the reuseet that are identified in Appendix A

.,e being m.de.venabie fo, pubne inspection and copying in the NRC Pubec occument s

N Room,1717 H Sweet, N.W., Weehington, DC, in a folder under this FOIA number and requester name.

The nonpropnetary version of the proposal (s) that you agreed to accept in a relephone corvversaten wth a member of my staff is now being made avalable for putsc irspecten and coying at the NRC Public Document Room,1717 H Street, N W., Washington, DC. in a folder under the FOIA number and requester name.

Enclosed is informaton on how you may obtain access to and the charges for copying records placed m the NRC Public Document Room,1717 H Street, N.W., Wasv$ ton, DC.

Agency records otbyset to the request are enclosed. Any applicable charge for copes of the records provided and payrnent procedures are noted in the comments secton.

Records subpoet to the request have been r&ed to another Federal egencyOes) for revww and direct response to you.

In view of NRC's response to this request, further action is being taken on appeal letter deced PART ll.A-INFORMATION WITHHELD FROM PUBUC OlSCLOSURE Certain informeten in the requested reemde is being withheld from public disclosure pursuant to the FOIA exemptione described in and for the reasons stated in Part II, sec-tions 8, C, and D. Any released portic.w of the documents for which only part of the record a being withheld are being made available for public inspection and copying in the NRC Pubac Document Room,17.7 H Street, N.W., Washington, DC, in a folder under the FOIA nurnber and requester name.

Comrnents

~

B710260012 871021 PDR FOIA GRABERB7-681 PDR yt. o#4cTom orvtsp 07 mugAmo Reconos tio A'

N d.,

v i.fs s

s hit NRC FORM 464 iPet n is asi

Re:

FOIA.87-681 APPENDIX

~A RECORDS MAINTAINED-!N THE PDR UNDER THE ABOVE RE00EST NUMBER

' NUMBER DATE ' '

DESCRIPTION l

1o 6/30/87.

Letter from NRC to Arizona Nuclear Power.

Project requesting additional.-information i

regarding IE Bulletin 85-03.

(2 pages) l 1

I l

l

1840 19e7 15:00 tA YclON V' W.C?

~

M3 &pW p,

(

f a

Docket Nos.

50-528 50-st9.

50-500 Arizone Nuclear Potder' Project.

P. O. Box 520M i Phoemdx. Arizona 88073-2034',

Attention:i E. E. Van Brunt 6 Jr. '

. Executive Vice Presidest-Project Director 8entlementi serto-45 5-43 5";; t.7-Operated Valte Coahon Mode The review.of your res Failures During Plaht nstantsDudtoImproperSwitchSettings."datedJune 30, 1986 and October 27.:1986. indicetes the<need for additianal information before the: program,to assaire valve operability can.be approved. The specific 1

'infovisation requests are included to the attechnent.

The information requested in the attachment should be sent withth 30 days of the date of this letter to:.

Rich 6rdJ. Kiessel.i W

Division of OperationiEvents Ascessment Nuclear:Regulptory Commission -

Washington,D.C. 20555 i A copy of this response should.be sent to the regional office.

(

Sincerely.

)

\\

/Si '

.u Deneis F. Kirsch.. Director.

Div8 slam of Reacter Saflet$ end Pro,feck "..

' Regfeely

~'ggg k

t..

> ^

g,g),gggg,

1.

RAI f6r Palo Verde units 1. 2. and SI octe/ enclosure:i

)

8. Falkenberry 1 Q.v,weh g,gwgi

'd,tT;'yg g,

w+

g,,

RV/4g JE oj,.

{

'Mfhl ik hh b

NO.

~

l

~ -

{

W )TD PDR8NU 3 '

)

V

[EK /

' PATE

[

K R5CH 1,

)

NELFle***'

R 6/3o/87 6//#f87 6/ /

6/p /87 ;

8

']h(p (

m

w a

e-..~.

_,.7.,

7

, m., mu m v w. t.-

433 m mus. e.uo.

[h,c,..s *'7 7 w a l m, 13:es

,V Pageil of 1

'i

' 'g

(*

a

.l REQUEST; FOR 'ADDITIONAU IMFD1MATION (RAI) RE: a I

Reviev of Responses to'ActionrItes e of IE Bulletin 85-03 Licongeer Unit (s.).Palo. Verse 1,2,3 Arizona Nuclear'iPower Projeqt; Date of Response: 106-30 P. 0. Box 52034 -

10-27-86 i Phoents, Arizona 85072J2034:

Respondents.

F. E. Van Brunts Jr.

Ezeoutive Vic'e Fre'aident l' i

Project Dir.ector The information:provided intyour.responseito Action Item e of IE :

Bulletin 85-03 wus found to the deficient in some areas.,Please-i provide the.addi4Aonal information.necessary. to r.esolve the j

~ following comments < and questions:

]

1. Eastwater hammer due to talve1 closure heem considered in the determination of pressura dif fer.entials?

If not,.please.

.explais.,

q

2. Listed MOVs HV-30.through HV-33!and NY '.54.of the.AFW System are

+

4-inch globe valves, and. listed.MOVa 'EC-321,and HC-331 of.the t

j

(

HPSI. System are 3-inch globe vsLves.. We were advised.recently<

that the MOVATS' data; base does not include glo,be valves iwich orifice sises.less than 1.75 or more ithan.2.0 inches.- Wil:1 representative samplosiof these.three-inch and,four.-Anch globei valves be tested at full :dif ferential pressurei?

3. Please explain why thelfollowing M0fd in the AFW:systemsore not r

included.in the ltables tof the iresponse of iO6-30-86.:

(a) HV-1 and HV-4 are shown normally closed in a suction (line.

from the CST :to one iof the.caotor-driven pumps, in ZodetE-3 :

of Drawing 13-N-CTF4001, Rev 14 4

(b) EV-4142 'end NYW1143 (are shows in parallel in. a Line c

' ' ' bypassing discharge inf one cof the : motor-driven pumps it'o c

Steam Cenerator.1, in soner G-14 a'ad F-14 of Dra'ving s 13-M-8GR-002; Rev.17. *

(c) HV-1144'and HVW1145'are shown.in parallel in a crossover line between idischenge lines of athe motor-driven pumpse in Zone C-14 of iDrawing 13-N-8GPL002; Rev (17., _

b y

mnwp.-

ex M

/ -r -

s

4. Please expand'the proposed programifer action items b, e and.d 1:

of the > bulletin to include.a commitment to a trainin83 Program f or setting switchesi maintaining talve operators, using signature testing equipment iend interpreting 8 signatures.-

s, TOTA. R.05

,