4
~
' Docket;No. 50-443 MAR i 81999
.Mr. Edwa'rd Brown Pre'sident & Chief' Executive q
Officer New Hampshire Yankee. Division Public Service Company of New j
Hampshire j
Post Office. Box 300-Seabrook, New Hampshire 03874~
' e
Dear Mr.-Brown:
SUB' JECT: COMPLETION OF LICENSING ISSUES AND CONFIRMATION OF COMMITt1ENTS As we have discussed with your' staff, several licensing issues in the NRC's-Seabrook: Safety-Evaluation Report and its supplements (SSER) were indicated to-be potential conditions of the license. Those so identified at the time of the Seabrook fuel load -license were included in that license. Since the fuel load license was issued, a number of ~ additional potential license conditions
-have be'en established.
At.this time, we'are considering documenting some of these licensing issues in SSER 8 along with your commitment to have the conditions met before issuance of i
the full power license -(i.e. a full power license will be issued after the NRC is satisfied that you mot the commitments).
SSER 8 will be issued concurrently with the five percent license.
Please provide the current status of the items listed in the Enclosure along with your completion commitment dates.
Please contact Victor Nerses if you have any questions.
Original Signed by:
Victor Nerses, Project Manager l
Project Directorate I-3 Division of Reactor Projects I/II v
Enclosure:
As stated j
cc/w enc.: See next page DISTRIBUTION:(pocke Q O MfNRC& Local PDRs, PDI-3 r/f, Glainas, BBoger, MRushbrook,VNerses,EJordan,BGrimes,ACRS(10),RWessman,JScintoOGC, BBerry OGC, JWiggins Rgn.I. TMarsh, WHodges, SMcCracken, SNewberry, LRouse, k%h
- DIR/PDI-3y:
DFG :PDI q j
- PDI.
g....:..
'NAME:MRupbrook~:p hmw :RWessman
.....:...g........:___........ :..___...____:____....____:...____.....:. __________:......_....
DATE ' *4/\\7/89
!$/19/89
- 3/t >/89
?
.J OFFICIAL RECORD COPY 8903E00307 890313 PDR ADOCK 05000443 f
am _
~
6 I
v.
l L :.. ;,
i L'
Edward A. Brown Seabrook Nuclear Power Station
.Public Service Company of New1 Hampshire
[y
~
cc:
.Tho' mas Dignan, - Esq'.
E. Tupper Kinder, Esq.
John A.:Ritscher,,Esq.
G. Dana Bisbee, Esq.-
-Ropes and Gray Assistant Attorney General'.
225 Franklin-Street Office of Attorney General Boston, Massachusetts' 02110 208 State House Annex Concord, New Hampshire 03301 Mr. Bruce.B. Beckley, Project Manager Public Service Company of New Hampshire Resident Inspector
. Post Office Box 330 US Nuclear Regulatory Commission
' Manchester, New Hampshire 03105 Post Office-Box 1149 Seabrook, New Hampshire '03874 Dr. Mauray Tye, President Sun Valley Association Mr. A. M.. Ebner, Project Manager 209 Summer Street United Engineers & Constructors Haverhill, Massachusetts 01830 Post Office Box 8223 Philadelphia, Pennsylvania 19101 i
Robert Backus, Esq.
Backus, Meyer and Solomon Steven Oleskey, Esq.
'116 Lowell Street Office of the Attorney General Manchester, New Hampshire 03106 One Ashburton Place P.O. Box 330 1
Diane Curran, Esq.
Boston, Massachusetts 02108-Harmon and Weiss 2001.S Street, NW Carol S. Sneider, Esq..
Suite 430 Office of the Assistant Attorney General Washington, D.C.
20009 One Ashburton Place P.O. Box 330
.l Philip Ahren, Esq.
Boston, Massachusetts 02108 Assistant Attorney. General State House, Station #6 D. Pierre G. Cameron, Jr., Esq.
Augusta, Maine 04333 General Counsel Public Service Company of New' l
Hampshire Mr. Edward A. Brown, President Manchester, New Hampshire 03105 i
and Chief Executive Officer New Hampshire. Yankee Division Mr. James M. Peschel j
Public Service Company of Public Service Company of New Hamsphire
.New Hampshire P.O. Box 300 Post Office Box 300 Seabrook, New Hampshire 03874 Seabrook, New Hampshire 03874 J
Seacoast Anti-Pollution League Regional Administrator, Region I 5 Market Street U.S. Nuclear Regulatory Commission Portsmouth, New Hampshire 03801 475 Allendale Road 25 Maplewood Ave.
King of Prussia, Pennsylvania 19406 Ms. Diana P. Randall Ashod N. Amirian, Esq.
70 Collins Street Town Counsel for Merrimac Seabrook, New Hampshire 03874 376 Main Street Haverhill, Massachusetts 08130 Mr. T. Feigenbaum Public Service Company of New Hamsphire-i Post Office Box 330 Seabrook, New Hampshire 03874 x
i
a.
Edward A. Brown, Public Seabrook Nuclear Power Station Service, Company of New Hampshire CCi Mr. Calvin A. Canney, City Manager Mr. Alfred V. Sargent, City Hall Chairman 126 Daniel Street Board of Selectmen Portsmouth, New Hampshire 03801 Town of Salisbury, MA 01950 Board of Selectmen Senator Gordon J. Humphrey RFD Dalton Road ATTN: Tom Burack Brentwood, New Hampshire 03833 531 Hart Senate Office Building U.S. Senate Ms. Suzanne Breiseth, Washington, D.C. 20510 Board of Selectmen Town of Hampton Falls Drinkwater Road Mr. Owen B. Durgin, Chairman Hampton Falls, New Hampshire 03844 Durham Board of Selectmen Town of Durham Mr. Guy Chichester, Chaiman Durham, New Hampshire 03824 Rye Nuclear Intervention Committee Jane Spector c/o Rye Town Hall Federal Energy Regulatory 10 Central Road Commission Rye, New Hampshire 03870 825 North Capital Street, NE Room 8105 Chairman, Board of Selectmen Washington D. C. 20426 RFD 2 South dampton, New Hampshire 03827 Mr. R. Sweeney R. Scott Hill - Whilton Three Metro Center Lagoulis, Clark, Hill-Whilton Suite 610
& McGuire Bethesda, Maryland 20814 79 State Street Newburyport, Ma. 01950 Mr. Richard Strome, Director Ms. R. Cashman, Chairman New Hampshire Office of Emergency Board of Selectmen Management Town of Amesbury State Office Park South Town Hall 107 Pleasant Street Amesbury, Massachusetts 01913 Concord, New Hampshire 03301 Adjudicatory File (2)
Honorable Peter J. Matthews Atomic Safety and Licensing Board Mayor, City of Newburyport Panel Docket City Hall U.S. Nuclear Regulatory Commission Newburyport, Massachusetts 01950 Washington, D.C. 20555 Mr. Donald E. Chick, Town Manager Congressman Nicholas Mavroules Town of Exeter 70 Washington Street 10 Front Street Salem, Massachusetts 01970 Exeter, New Hampshire 03823 Mr. G. Thomas Mr. John C. Duffett Public Service Company of President and Chief Executive Officer New HampsF're Public Service Company of New Hampshire Post Office u x 330 1000 Elm St., P.O. Box 330 Seabrook, New 1mpshire 03874 Manchester, New Hampshire 03105
l-ENCLOSURE LICENSING ITEMS TO PE COMPLETED AND COMMITMENTS CONFIRMED 1).
Containment Systems (Section 6.2, SSER 7)
PSNH shall add an additional pressure isolation valve in series with each of the existing check valves separating the Residual Heat Removal (RHR) and Containment Building Spray (CBS) systems, or upgrade the CBS and RHR suction piping design pressure.
2)
Control Room Habitability (Section 6.4, SER, SSER 7, SSER 8) i PSNH shall complete the proposed modifications to the control room habitability system described in SSER 8 and shall propose conforming changes to Technical Specification 3/4.7.6.
3)
Radiation Data Management System (Section 7.5.2.2, SER, SSER 5 Qualified non-fuse dependent isolation devices shall be installed between the Class 1E portion of the Radiation Data Management System and the i
non-Class 1E portion and shall be operational.
4)
New Fuel Storage and Handling (Section 9.1 SSER 8) (Confirm Procedural Commitments)
{
The following criteria apply to the storage and handling of new fuel assemblies:
a.
No more than two fuel assemblies shall be out of approved shipping containers or fuel assembly storage racks at any one time, b.
PSNH shall maintain a minimum 12-inch edge-to-edge distance between fuel assemblies which are out of storage racks or shipping containers.
These criteria do not apply to those fuel assemblies in the process of being transported to or from the reactor vessel.
5)
Fire Protection (Section 9.5.1, SER, SSER 4, SSER 5, SSER 6, SSER 7 PSNH shall have the Heating, Ventilation and Air Condition System charcoal filter unit detection system and any associated modifications dictated by the fire hazards analysis complete and operable.
'o 7
m
~
6)
Process and Effluent Radiological Monitoring and Sampling Systems, TMI Action Plan Item II.F.1 (Section 11.5, SER, SSER 2, SSER 5)
PSNH shall demonstrate that the iodine / particulate sampling system is operable and will perform its intended function.
(This item may require power operation before calibration is complete).
f
)
i 4
l
}