mc-
-
-
s
- y
1
,
u
..
,
.
,
.:, ; a'
_QT@
' .-
-
In Reply Refer To:
l
.
Docket:
50-298/89-08
]
Nebraska Public Power District
-
I
ATTN: George A. Trevors-
Division Manager - Nuclear Support
P.O. Box 499
'
. Columbus, NE 68602-0499.
Gentlemen:
This-refers to the inspection conducted by Nemen M. Terc of this office during
the period February 15-17, 1989, of activities authorized by NRC Operattog
License DPR-46, for Cooper Nuclear Station and to the discussion'of our
!
. findings _with Mr. G. R. Horn and other members of your staff at the conclusion
'of the inspection.
Areas examined during .the inspection included a. review of the operational.
status of the emergency preparedness program. Within this area, the inspection-
consisted of selective examination of procedures and representative records,
.
interviews with personnel, and observations by the NRC. inspector. The
inspection findings are documented in.the, enclosed incpection report.
Within the scope of this inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
Should you h' ave any questions concerning this inspection, we will be pleased
to discuss.them with you.
.
I
Sincerely,
,
J
CD.'
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-298/89-08
f.c's on next page:
<
f
,
!
C PS/ -
D:DRP
.
- RPB
C:S
PB'
C:RPB
Te
JEv
t
BMurray
able
Callan
/g/89
% /89
g/g/89
/(, /89
3/7/89
I
8903200132 890307
'
ADCOK 05000298
'
O
y
-
-
-
---
-- -
__
_ - - - - - - - _
-
__- _ -----__ - _ -
_-
_ - _ - _ _ _ _
_
_
_
j-
,
.
,
i-
.
\\
L:
'
.
.
'
.
1
Nebraska Public Power District
-2-
I
1
cc w/ enclosures:
Cooper Nuclear Station
!
ATTN: Guy Horn, Division Manager
!
,of Nuclear Operations
)
P.O. Box 98
l
'
Brownville, Nebraska 68321
Program Manager
FEMA' Region 7
.,
911 Walnut Street, Room 200
64106
Director
Nebraska Civil Defense Agency
1300 Military Road
1
Lincoln, Nebraska 68508
i
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE-35)
bec distrib. by RIV:
'
- RRI
- R. D. Martin, RA
- Section Chief (DRP/C)
Lisa Shea, RM/ALF
- RPB-DRSS
- MIS System
- RIV File
- Project Engineer, DRP/C
- RSTS Operator
- DRP
- P. O'Connor, NRR Project Manager (MS:
13-D-18)
- DRS
- R. Bangart
- R. Hall
- B. Murray
- J. Everett