Forwards Insp Rept 50-424/87-55 on 870908-10 & 21. Significant Failures to Comply W/Nrc Security Requirements Identified.Addl 20 Days Will Be Provided to Util for Determination of Corrective Actions Needed
ML20235W628
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/01/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20235W629 List:
References
NUDOCS 8710160336
Download: ML20235W628 (3)


See also: IR 05000424/1987055

Text

___ __ _-__

_

'

SAFEGUARDS INFORMATION

~~

00T 011987

U_SNRC-OS

IWI 0C1 h A D'02

Oocket No. 50-424

License No. NPF-68

l

Georgia Power Company

ATTH:

Mr. James P. O'Reilly

Senior Vice President

Nuclear Operations

P. 0 Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-424/87 55

This refers to the inspection conducted on September 8-10 and September 21,

1987, at the Vogtle Electric Generating Plant (VEGP).

The inspection consisted

of a review of certain secur:ty violations discovered and reported by your

staff.

As a result of this inspection, significant failures to comply with NRC

security requirements were identified.

These findings are of concern as they occurred after the Enforcement Conferences

on June 17, July 1, and August 20, 1987 at which time we discussed similar and

~

repetitive failures in the Vogtle Security Program and Georgia Power Company's

associated corrective action.

The NRC is in the process of determining the significance of these latest

findings and is considering whether additional enforcement action is appro-

priate.

In reaching this decision, we intend to consider information provided

by you in your response to the Notice of Violation and Proposed Imposition of '

Civil Penalty, dated September 4, 1987, particularly as it relates to the

corrective actions implemented or planned and other steps taken to prevent

further recurrence of these types of violations.

As discussed with you on September 30, 1987, since your response to the Notice

of Violation is due October 4,1987, we will provide an additional 20 days from

the date of your receipt of this letter and the enclosed Inspection Report, for

you to review your corrective actions for the purpose of determining whether any

additional corrective actions are necessary to assure that your ongoing efforts

encompass these events.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosures

to this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

8710160336 871001

PDR

ADOCK 0500

4

SA5Fc *"0NTAINs

UE,*hEcontaou

SAFEGUARDS INFORMATION

y ;,

- _ - _

--

-

- - - - - -

- - - - -

b! ' .. .

s

E'

SAFEGUARDS INFORMATION

OCT 011987 -

-Georgia Powe'r Company

2

..

' The responses directed by.this letter are not' subject to the clearance

procedures 'of the Office of Menagement and Budget as required by the Paperwork

Reduction Act of 1980, P.L. No.96-511.

Sincerely,

J. Nelson Grace

Regional Administrator

Enclosure:

1

- Inspection Report-

(Safeguards'Information)

- cc w/ enc 1:

P; D. Rice, Vice President, Project

. Director

3

C. W. Hayes, Vogtle Quality

l

Assurance Manager

. G. Bockhold, Jr., General Manager,

Nuclear' Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

J.'A. Bailey, Project Licensing

,

!

Manager

1

cc w/o enc 1:

j

B. W. Churchill, Esq., Shaw,

I

Pittman, Potts and Trowbridge

J

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

G. A. Linenberger, Jr., Administrative Judge

~ Atomic Safety and Licensing Board

Panel

bec,w/ encl:

(See page 3)

ENCLOSURE c0NTAINS

SAFEGUARDS INFORMATION

UPON SEPARATION THIS

I

" " ' ' " " " " * " '

SAFEGUARDS INFORMATION

.

_.m---m_

. _ _ _ _ _ - - - -


--

.

.

.

.

.

.

'

'r'

' _ '

' -

\\

/V

SAFEGUARDS INFORMATION

'

'

.-i ?

.

OCT 011987

a.,

-Georg1a Power Company

3:'

,

bec w/ enc 1:-L

~NRR/DRIS/SB'

ec w/ Inspection, Summary

b

m

. Document Control; Desk'.(RIDS IE04),'016

,

,

NRC.' Resident Inspector-

_ ' ,

' State of Georgia

,

r

s

o

-,

.

EJP$

..

.

RII ly (

{

RII

RII

RII

R77

WTobin

DMcGuify WC

e

JSt hr

MSinkule VLBrownlee LRehes

l_

9/p/87

9/p/87

9/jp/87 p/}/87

9/ /87

g/\\ /87

9/(/87

R

RII

sd

effw'

1

G en

s

MErn

l

9/ ,/87

9/ /87

.

Enclosure conAINs

l

3

SAFEGUARDS InronxArion

UPON SEPARAT

SAFEGUARDS INFORMATION

"""" " ION THI S

""'

1E_

_-- - - _ -----

-

- - - -

- - - - -

- - -

--