ML20235W331
| ML20235W331 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/16/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20235W335 | List: |
| References | |
| NUDOCS 8707230530 | |
| Download: ML20235W331 (2) | |
See also: IR 05000313/1987018
Text
- _ _ _ .
.-
_
_
- - _ _
,
.
,
3 01. 1 6 1987
l
l
In Reply Refer To:
'
Dockets:
50-313/87-18
50-368/87-18
Arkansas Power & Light Company
ATTH:
Gene Campbell, Vice President -
Nuclear Operations
P. O. Box 551
l
Little Rock, Arkansas 72203
l
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson and
C. C. Harbuck of this office during the period June 1-30, 1987, of activities
authorized by NRC Operating Licenses OPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine and
other members of your staff at the conclusion of the inspection.
i
Areas examined during the inspection included operational safety verification,
l
maintenance, surveillance, followup on previously identified items, snd
followup on Information Notices. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
.
With personnel, and observations by the NRC inspectors.
The findings are
!
cocumented in the enclosed inspection report.
Curing this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
Two unresolved items are identified in Paragraph 4 of the enclosed inspection
report.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
Paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:SR
RI
pi
PI '
C-
'
WDJohnson
fpCCHarbuck
MEM - y
DRHunjer
E g) ardo
-N
T # /87
]/p/87
7 ;> /87
/
7/ f'/87
7//
87
3
f
,
h' '
p;a72n8=8180sa
O
_ _ - -
__
__.
-
p
w
,
1.
Arkansas Power & Light Company
-2-
'Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Dricinal S1 pass ty
J. P.. Jaudon
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A -: Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/87-18
50-368/87-18
cc w/ enclosures:
J. M. Levine, Executive Director
' Site Nuclear Operations
Arkansas Nuclear One
Rt. 3, Box 137G
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
- RRI
Robert D. Martin, RA
- EP&RPB
- Section Chief (RPB/B)
- D. Weiss, RM/ALF
- RIV
DRSP
- RSB
- MIS SYSTEM
- RSTS Operator
- Project Inspector
- R. Hall
Bob Lee (NRR)
George Dick (NRR)
- w/766
_ _ _ _ _ _ _ _ _ .
-
_
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _