Forwards Insp Repts 50-348/89-02 & 50-364/89-02 on 890111-0210.Activities Appearing to Violate NRC Requirements Identified in Rept But Not Cited
ML20235W020
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/24/1989
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20235W024 List:
References
NUDOCS 8903100462
Download: ML20235W020 (2)


See also: IR 05000348/1989002

Text

_ - _ - _ _ _ _ _ _ _ _ -

_

--

'

3. . .

'g

'

'

E

FEB 2 41989

+

l.

'

l

Doc'ket Nos. 50-348,:50-364

License Nos. NPF-2 and.NPF-8

.

1

j

'

Alabama Power Company

ATTN:

Mr. W. G.:Hairston, III

.

Senior Vice President-Nuclear

,

l

. Operations

")

P. O. Box 2641

j

Birmingham, AL 35291-0400

j

.

'!

, Gentlemen *

1

' SUBJECT:

NRC ' INSPECTION REPORT N05. -50-348/89-02- AND 50-364/89-02

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

~

G. F. Maxwell on January 11 - February 10, 1989.. The inspection included a

review of activities authorized for your Farley facility.

At the conclusion of

the'. inspection, the findings were- discussed with those members of your staff

'ideritified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

l

these; areas. . the inspection consisted of selective examinations of procedures

'

and representative _ records, ' interviews with personnel, and observation of-

activities-in progress.

Thefenclosed' inspection report identifies activities that appeared to violate

NRC requirements but are not cited; therefore, no response is required.

l

In . accordan:e with Section 2.790 of the NRC's " Rules- of Practice," 'Part 2,

-l

-Title 10,-Code of Federal Regulations, a copy of this letter and its enclosures will

!

be placed in the NRC Public Document Room.

l

Should you have any questions concerning this letter,'please contact us.

j

Sincerely,

(orip olyd by Duueelli

l

l

David M. Verrelli, Chief

!

Reactor Projects Branch 1

Division of Reactor Projects

l

Enclosure:

(See page 2)

i

8903100462 390

348 -

PDR

ADOCK O

p,gy

G

I \\

'

'

120l

_ __ -_ _ _ _ .

- - _ _ _ _ _ _ _ _ _ _ _ - _ - - _ - _ - _ _ _ - _ -

u

_

_ _ _ - _ .

- _ _ _ _ _ _ _ _ _ _ _ - _ _ _ .

_ - -

. _ _ _

. _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ - -

- - _ .

_.

_ - _ ,

"<-

..

a *

~

k

Alabama Power Company

2.

' FEB.2 4 19g9 -

l

(?-

\\

'

[

e

Enclosurej

L(

NRC Inspection Report

li

.cc w/ enc 1:

B.;M..Guthrie, Executive Vice President

R. P.' Mcdonald,-Executive Vice President:

J..D.'Woodard, Vice President -

Nuclear Generation

.D.'N. Morey,-General Manager -

'

Nuclear.P1 ant

J..W. McGowan, Manager, Safety Audit

and Engineering Review-

S. Fulmer, Supervisor-Safety

' Audit and Engineering. Review

. State of Alabama

4

bec w/ encl:

'

NRC Resident Inspector

,

E.~ Reeves, Project Manager, NRR

DRS Technical' Assistant

Document Control Desk