Ack Receipt of 861202 Proposed Amend to Physical Security Plan in Response to Miscellaneous Amends & Search Requirements.Response to Encl Comments Requested within 30 Days of Ltr Receipt
ML20235V433
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 10/01/1987
From: Boyle M, Jaffe D
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
TAC-65187, TAC-65320, TAC-65340, NUDOCS 8710150153
Download: ML20235V433 (6)


Text

,-

I OCT' 01 1987 Docket No. 50-245/336/423_

Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering & Operations P.0, Box 270 Hartford, Connecticut 06141-0270 Dear Mr.

Mroczka:

SUBJECT:

MISCELLANEOUS AMENDMENTS / SEARCH REQUIREMENTS MILLSTONE NUCLEAR POWER STATION (TAC #65187/65340/65320)

This is to acknowledge receipt of the Northeast Nuclear Energy Company letter, dated December 2, 1986, which transmitted a proposed amendment to the Millstone Nuclear Power Station Physical Security Plan, in response to the Miscellaneous Amendments _and Search Requirements.

The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval.

The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.

It is requested that you provide your response:to these comments within 30 days from receipt of this letter.

The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

i Should you have any questions concerning the enclosed comments, please contact the reviewer, Gene McPeek, at (301) 492-4968.

Sincerely, 0710150153 871001 DR ADOCK 0500 5

g Michael Boyle, Project Manager.

David H. Jaffe, Project Manager Intergrated Safety Assessment Project Directorate Project Directorate I-4 Division of Reactor Projects III,.IV, V Division of Reactor Projects - I/II and Special Projects Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical Security Plan Comments RSGB rf.

Sec rf GMcPeek CBuracker (2) cc w/ enclosure:

Region I SNorris/PShuttleworth m

~

See next page M8oyle/DJaffe Doi:ket~ File: 50-245/336/423 P RFerguson NRC'PDR

{

PDM,hrln PDNSAP[

Case File Local PDR j

,y RErickson wo/ enc 1 PStarcher PShufleworth j

RFer s W

LBush wo/enci 9/ /7

' f6/ l /87 V

m

.........g{......'.....

f. : R SGdc

PD/ISAhR l

0FC (RSGB '

RSGB
RSG
PD I-4

/7

P l

"#["

f$fI.'.....C8gra 3_r__j_

_____!_E

__ {

MB?{e_____ ______ ?_

l LB s R

on f

DATE:9#3/87

$ 9///87

$9/)3/87

$ 9/M/87

9/8/87 l0///87 10 / / /87 t

i

)

-=

c 1

s'.

Mr; Edward J. Mmczta Millstone Nuclear Power Station.

Northeast duclear Energy Company Unit No. 1-CC*

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control-Unit-Counselors at' Law Department of Environmental 1

Protection

-City Place State 0ffice Building' Hartford, Connecticut ;06103-3499 Hartford, Connecticut 06106 i

Bayne D. Romberg Vice. President, Nuclear Operations Richard M. Kacich, Manager

-'Northecst Utilities' Service.. Company

. Generation' Facilities Licensing Post Office Box 270 Northeast Utilities Service Company

Hartford, Connecticut 06141-0270 Post Office Box 270 Hartford, Connecticut 06141-0270 Bradford S. Chase, Under Secretary 6

Energy' Division

.0ffice of Policy and Management J. Stetr, Plant Superintendent 80 Washington Street Millstone, Unit 1

-Hartford, Connecticut 06160 Northeast Nuclear Energy Company P.O. Box 128 Waterford, Connecticut. 06385 Regional Administrator, Region 1 Donald 0. Nordquist, Director

U.S. Nuclear Regulatory Commission Quality Services Department 631 Park' Avenue Northeast Utilities Service Company King.of Prussia, Pennsylvania 19406 Post Office Box'270 Hartford, Connecticut 06141-0270 Northeast Nuclear Energy Company ATTfu Superintendent Millstone Nuclear Power Station P. 0. Box 128 Waterford, Connecticut 06385-J Resident Inspector c/o U.S. NRC Millstone Nuclear Power Station P..O.' Box'811 Niantic, Connecticut 06357 First Selectman of the Town of Waterford

)

. Hall of Records 200 Boston Post Road

)

Waterford, Connecticut 06385

]

I l

I

(

1

a d

4 Mr.' Edward J. Mroczka Millstone Nuclear. Power Station-

'l Northeast Nuclear Energy Company-Unit No. 2 cc:

Gerald Garfield, Esq.

Mr. Si Scace Day, Berry & Howard Superintendent' Counselors at Law Millstone Nuclear Power Sta' tion

. City Place

'P. O. Box 128-Hartford, Connecticut '06103-3499' Waterford, Connecticut 06385

-Regional Administrator, Region.I 3

U.S. Nuclear Regulatory Comt 3 fion-10ffice of Executive Director.vor-Operations 631. Park Avenue-King of. Prussia,' Pennsylvania 19406

! Mr. Charles Brinkman, Manager Washington Nuclear Operations C-E Power Systems 1

Combustion Engineering. Inc.

7910 Woodmont Avenue Bethesda, Maryland.20814 Mr. Lawrence Bettencourt, First Selectman Town of Waterford

Hall of Records - 200 Boston Post Road Waterford, Connecticut 06385 Northeast Utilities Service Company ATTN:. Mr. Richard 'Kacich i

Generation Facilities Licensing j

Post-Office Box 270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Radiation Control Unit Department of Environmental Protection State Office Building Hartford, Connecticut 06106 Mr. ' William Raymond U.S. NRC P. O. Box 615 Waterford, Connecticut 06385-0615 l

Office of Policy & Management

,e ATTN: Under Secretary Energy l

Division 80 Washington Street

)

Hartford, Connecticut 06106 q

~

l 1

u 1

i

, ' ' y' y

1 Mr. E. 'J. Mroczka --

Millstone Nuclear Power' Station.

. Northeast Nuclear Energy Company -

Unit No. 3

')

.i

~.

~

2

. cci Gerald Garfield,- Esq.

Ms. Jane Spector.

Day, Berry & Howard Federal Energy Regulatory Comission-

~ City Place

. 06103-3499 Room 8608C 825 N.' Capitol Street, NE

' Hartford;-Connecticut' Washington, D.C.. 120426 Mr. Maurice R. Scully, Executive.

Director-

.Mr..Kevin McCarthy, Director Connecticut Municipal Electric

-Radiation Control Unit Energy Cooperative Department of Environmental. Protection 268 Thomas Road State Office Building Groton, Connecticut. 06340 Hartford, Connecticut 06115 Robert W. Bishop, Esq.

Burlington. Electric Department'

-Corporate Secretary-c/o Robert E. Fletcher,.Esq.

Northeast Utilities 271 South Union Street-Post Office Box 270 Burlington, Yemont 05402 Hartford, Connecticut 206141

.Mr. William J. Raymond.

Senior Resident Inspector Office U. S. Nuclear Regulatory Commission Millstone III

.P. 0. Box 811 Niantic,, Connecticut 06357-08 Mr. Michael L.- Jones, Manager Project Management Department Massachusetts Municipal Wholesale Electric Company Post Office Box 426 Ludlow, Massachusetts 01056 Regional Administrator U. S. NRC, Region I 631 Park Avenue-King of Prussia, Pennsylvania 19406 l

Mr. Karl Abraham i

Public Affairs Office, Region I U. S. Nuclear Regulatory Commission, King of Prussia, Pennsylvania 19406 1

u Docket No. 50-245/336/423 ENCLOSURE COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)

MILLSTONE NUCLEAR POWER STATION Provide a schedule for implementing the amended safeguards requirements within 180 days after Commission approval of the preposed security plan.

Reference 10 CFR 73.55.

State that vital area access controls will not be dropped for life threatening situations not involving public health and safety.

Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).

Provide a commitment that the search requirements will be implemented within 60 days after Commission approval of the proposed revisions.

Reference 10 CFR 73.55(d)(1).

Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior to re-entry into the protected area if they have not been j

under direct observation or accompanied by another member of the security I

force.

Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).

)

Revise the statement on page 6-8 that "only bona fide" Federal, State, and local

)

law enforcement personnel "on official duty" are exempt from the required equipment searches upon entry to the protacted area.

Reference 10 CFR

)

73.55(d)(1).

]

l Revise the commitment to positively control, in accordance with the current approved access lists, all points of vehicle access to vital areas.

Reference j

10 CFR 73.55(d)(7)(i)(B).

{

)

Provide a commitment to ensure prompt access to vital equipment to accommodate

]

the potential need for rapid ingress or egress of individuals during emergency j

conditions or situations.

Indicate how this prompt access will be ensured

)

(e.g., by issuing override keys to appropriate operators and security force i

members at the start of each shift, or by other acceptable means).

Reference i

10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Revise the commitment on page 15-1 from biannual to periodically (annually) review physical security and contingency plans and procedures to evaluate their potential in; pact on plant and personnel safety.

Reference 10 CFR 73.55(d)(7)

(ii)(B) and Regulatory Guide 5.65.

0

, Revise the commitment on page 6-17 that all keys, locks, combinations, and related access control devices used to control access to protected and vital-areas shall be changed or rotated at least every 12 months by deleting the reference to 13 months from the plan.

Reference 10 CFR 73.55(d)(9).

Provide a specific commitment that the secondary power supply systems for both the alarm annunciator equipment and non portable communications equipment shall be located within a vital area.

Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #16).

Indicate what specific components of.ne secondary power supply system will be protected as vital.

Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A l

  1. 18).

Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.

Reference 10 CFR 73.70(d).