Forwards Insp Rept 50-285/87-21 on 870914-18.Violations Noted.Enforcement Conference Scheduled for 871015 to Discuss Violations,Per 870925 Telcon
ML20235T598
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/07/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20235T600 List:
References
EA-87-200, NUDOCS 8710130144
Download: ML20235T598 (2)


See also: IR 05000285/1987021

Text

'>

>

OCT

T1987

In Reply Refer To:

Docket:

50-285/87-21

EA 87-200

Omaha Public Power District

ATTN:

R. L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

Omaha, Nebraska

68102

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Baer of this office during

the period September 14-18, 1987, of activities authorized by NRC Operating

License DPR-40 for the Fort Calhoun Station, and to the discussion of our

findings with Mr. W. G. Gates and other members of your staff at the conclusion

of the inspection.

Areas examined during the inspection included the radiological environmental

monitoring and external occupational exposure control programs.

An allegation

concerning personnel exposures during maintenance activities was also reviewed.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspector.

The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

apparent violation of NRC requirements.

The results of the inspection are

documented in the enclosed inspection report.

As discussed in the telephone

conversation between Mr. Blaine Murray of this office and Mr. Gary Gates of

your staff on September 25, 1987, we have scheduled an enforcement conference

in our office at 10:00 a.m. on October 15, 1987, to discuss these apparent

violations.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

8710130144 871007

p[ydDd Signed y

PDR

ADDCK 05000285

p'-J.E.kd'g9b'edo, Chief

Reactor Projects Branch

Enclosure:

(see next page)

RIV:FRPS

C:FRPS

C: RPSB

D:0

/B

LAYand

RLB

, ,

REBaer/dp

[gMurray

rt

D

er

/ /87

g()/s/87

p/f/87

gy'

& /.3 /87

' 87

/

C:RPIk

AC

E0

ff

JEGaglia@do

MEEp[erson

r

DAPowers

to / 4 /87

@ A /87

to /6 /87

y

k

h

/y'

__ _

.

. a .,

.

1

~ Omaha Public Power District

-2-

I

i

Enclosure:

Appendix - NRC Inspection Report

50-285/87-21

l

l

cc w/ enclosure:

)

W. G. Gates, Manager

Fort Calhoun Station

P. O. Box 399

Fort Calhoun, Nebraska

68023

l

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D. C.

20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc to DMB (IE06)

bcc distrib. by RIV:

  • RPB
  • RRI

R.D. Martin, RA

RPSB

  • Section Chief (RPB/B)
  • MIS System

i

l

  • RIV File

DRSP

. RSTS Operator

  • RSB
  • Project Inspector, RPB
  • D. Weiss, RM/ALF
  • R. Hall
  • T. Bournia, NRR Project Manager
  • R. E. Baer
  • B. Murray_

R. L. Bangart

  • D. A. Powers
  • M. E. Emerson (2)
  • w/766

,

i

.

1

'

.

______1_.