Forwards Insp Rept 50-267/87-15 on 870615-19.No Violations or Deviations Noted
ML20235T522
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/14/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20235T525 List:
References
NUDOCS 8707220166
Download: ML20235T522 (2)


See also: IR 05000267/1987015

Text

..

.

___

,

t

i

L

JUL l 41987

L

l

In Reply Refer To:

Docket:

50-267/87-15

,

l

Public Service Company of Colorado

ATTN:

Robert 0. Williams, Jr.

'Vice President, Nuclear Operations

P. O. Box 840

Denver, Colorado

80201-0840

Gentlemen:

This refers to the inspection conducted by Messrs. J. B. Baird and

C. A. Hackney of this office during the period June 15-19, 1987, of activities

authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear

Generating Station, and to the discussion of our findings with you and members

of your staff at the conclusion of the inspection.

Areas examined during the inspection included operational status of the

emergency preparedness program, changes to the emergency preparedness program,

shift staffing and augmentation, and licensee audits.

Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

J. P. Jaudon

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-267/87-15

cc:

(see next page)

RIV:TAhl/

EPA LE4/-

C:NMEPd

C:RPB/ M/3

C: RF

JBBaird/tw

CAHackney

WLFisher

PJaudon

Ga lia do

7 / 6 /87

7 /f /87

7 /f 0/87

/ty/87

7/ / /87

(

4

8707220166 870714

PDR

ADOCK 05000267

l

{

G

PDR

.

'

4

s

-

Public Service Company of Colorado

-2-

cc w/ enclosure:

l

Manager, Nuclear Production Division

'

Fort St. Vrain Nuclear Station

16805 WCR 19

Platteville, Colorado

80651

P. Tomlinson, Manager, Quality

Assurance Division

(same address)

<

Colorado Radiation' Control Program Director

Colorado Public Utilities Commission

bcc to DMB (IE35)

bec distrib. by RIV:

  • RPB

DRSP

  • RRI

R. D. Martin, RA

'

  • Section Chief (RPB/A)
  • RSB
  • Section Chief (RSB/ES)
  • Project Inspector, RPB

RPSB

  • D. Weiss, RM/ALF-
  • MIS System
  • R. Hall
  • RSTS Operator

NRR Project Manager

  • RIV File
  • Inspector (s)
  • W. L. Fisher

R.

L.- Bangart

D. B. Matthews, NRR

FEMA Region 8

  • w/766

I

i

_ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ - - - - - _ _ _ - _ _ _ - - -