ML20235T223
| ML20235T223 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 10/01/1987 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8710090298 | |
| Download: ML20235T223 (1) | |
See also: IR 05000369/1987013
Text
e-
6-
dM
,
t
-
DCT 01 M87
[P!ke Power Company
g/ATTfD fir. H. B. Tucker, Vice President
Nuclear Production Departruent
422' South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-369/87-13 AND 50-370/87-13
Thank you for your response of September 8,1987, to our Unresolved Item
concerning activities conducted at your McGuire facility. The Unresolved Item
was concerned with how your post-accident radioiodine and-particulate sampling
system met the requirements of NUREG-0737, Table II.F.1-2, Sampling and
Analysis or fleasurement of High-Range Radiciodine and Particulate Effluents in
Gaseous Effluent Streams.
Af ter we have performed a thorough review of your
response, we will infonu you of the results of our evaluation.
We appreciate your cooperation in this matter.
Sincerely,
Oi W1 OGNED PY
DOU:'. 5 M. C U p.g
.
Douglas M. Collins, Chief
Radiological Protection Branch
Division of Radiation Safety
cc:
L. McConnell, Station Manager
/
bcc k IRC Resident Inspector
D. Hood, NRR
Document Control Desk
State of North Carolina
>
l
I
RII
Rll
Rll
i
M
L g(
no
l
JKale(
ka'G1
D
l
rsen
9// /87
9/tr)/87
9/Jo/87
l
t
/,
l
?Dk lfflK 050003sy
8 B71001
0
f
1
\\
ZEeI
l