Forwards Amend 96 to License DPR-61 & Safety Evaluation. Amend Revises Tech Specs to Provide long-term Acceptance Criteria for Steam Generator Tubes W/Defects in Rolled Region & to Update Bases for Criteria
ML20235S499
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/25/1987
From: Frank Akstulewicz
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20235S503 List:
References
TAC-67463, NUDOCS 8710090022
Download: ML20235S499 (3)


Text

_ _ _ _ _ _ _ _ .

September 25, 1987 Docket No.: 50-213 DISTRIBUTION Docket > File- EJordan NRC/ Local PDR JPartlow Mr. Edward J. Mroczka, Senior Vice President ISAPD File TBarnhart(4)

Nuclear Engineering and Operations DCrutchfield WJones Connecticut Yankee Atomic Power Company FSchroeder ACRS (10)

Post Office Box 270 MShuttleworth Tech Br Hartford, Connecticut 06141-0270 FAkstulewicz DHagan 0GC-Beth WJones

Dear Mr. Mroczka:

EButcher GPA/PA ARM /LFMB

SUBJECT:

TECHNICAL SPECIFICATIONS FOR STEAM GENERATOR TUBE PLUGGING IN THE TUBE SHEET REGION (TAC No. 65478)

Re: Haddam Neck Plant The Commission has issued the enclosed Amendment No. 96 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated June 1, 1987.

The license amendment revises Technical Specifications Section 4.10.D.1 to provide long-term acceptance criteria for the steam generator tubes with defects in the rolled region (bottom four inches of the tube) and to update the bases for this criteria. These changes will not affect repair criteria for flaw indications located outside of the roll expansion region. This license amendment will also modify the current requirement that "The plugging limit for sleeves will be determined prior to the 1987 refueling outage .for Cycle 15,"

to "The plugging limit for sleeves will be determined prior to the first refueling outage following sleeve installation," since, to date, no sleeves have been installed at the Haddam Neck Plant. This license amendment also revises Technical Specification Section 4.10.D.2 to delete the exclusion of tube row 37, column 73 in Steam Generator #2 from plugging, sipqe this tube has subsequently been plugged during a mid-cycle shutdown in J,Qly,1986.

V A copy of the Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.

Sincerely,

/s/

Francis M. Akstulewicz, Jr, Project Manager Integrated Safety Assessment Project Directorate Division of Reactor Projects III/IV/V and Special Projects

Enclosures:

1. Amendment No. 96 to License No. DPR-61
2. Safety Evaluation 8710090022 870925 cc w/ enclosures: PDR ADOCK 05000213 See next page P PDR y ***d LA:ISAPD PM:ISAPD T& 0 -Be. da D$hM MShuttlewofT FAkstule cz )( #d CCh9ng 09//_5/87 09/[/87 09/ /87 09//r/87 09/gg/87 0FFICIAL RECORD COPY l . . . . .

dI

- i

' sto o,, UNITED STATES

g. NUCLEAR REGULATORY COMMISSION

[ WASHINGTON, D, C. 20656 g

September 25, 1987 k*****/

. Docket No.: 50-213 Mr. Edward J. Mroczka, Senior Vice President j Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 <

Hartford, Connecticut 06141-0270 l

Dear Mr. Mroczka:

SUBJECT:

TECHNICAL SPECIFICATIONS FOR STEAM GENERATOR TUBE PLUGGING IN THE TUBE SHEET REGION (TAC No. 65478)

Re: Haddam Neck Plant The Commission has issued the enclosed Amendment No. 96 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated June 1, 1987.

The license amendment revises Technical Specifications Section 4.10.D.1 to provide long-term acceptance criteria for the steam generator tubes with I defects in the rolled region (bottom four inches of the tube) and to update j the bases for this criteria. These changes will not affect repair criteria for flaw indications located outside of. the roll expansion region. This license amendment will also modify the current requirement that "The plugging limit i for sleeves will be determined prior to the 1987 refueling outage for Cycle 15,"

to "The plugging limit for sleeves will be determined prior to the first refueling outage following sleeve installation," since, to date, no sleeves have been installed at the Haddam Neck Plant. This license amendment also revises Technical Specification Section' 4.10.D.2 to delete the exclusion of tube row 37, column 73 in Steam Generator #2 from plugging, since this tube has subsequently been plugged during a mid-cycle shutdown in July,1986. l A copy of the Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.

4 Sincerely, '

td%M b Francis M. Akstulewicz, r6 ject Manager Integrated Safety Assessment Project Directorate Division of Reactor Projects - III, IV, V .

and Special Projects .

Enclosures:

1. Amendment No.96to License No. DPR-61
2. Safety Evaluation cc w/ enclosures:

See next page l ~'

f Mr. Edward J. Mroczka l Connecticut Yarkee Atomic Power Company Haddam Neck Plant

. CC * -

Gerald Garfield, Esquire Kevin McCarthy, Director l Day, Berry & Howard Radiation Control Unit ,

Department of Environmental l Counselors at Law Protection City Place State Office Building Hartford, Connecticut 06103-3499 Hartford, Connecticut 06106 Superintendent Richard M. Kacich, Manager 1

Haddam Neck Plant. Generation Facilities Licensing RDF #1 Northeast Utilities Service Company Post Office Box-127E East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 Wayne D. Romberg Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270  ;

Hartford, Connecticut 06141-0270 I

Board of Selectmen ] ;

Town Hall j f Haddam, Connecticut 06103 State of Connecticut l Office of Policy and Management ATTN: Under Secretary Energy l Division 80 Washington Street Hartford, Connecticut 06106 ,

I Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC P. O. Box 116 .

East Haddam Post.0ffice 1 East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue l King of Prussia, Pennsylvania 19406 i

I s

e

~^" - - - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _