UNITED STATES 8
o,,
NUCLEAR REGULATORY COMMISSION g
aE WASHINGTON, D. C. 20555
...../
\\
Docket No.: 50-213 September 29, 1987 j
l Mr. Edward J. Mroczka, Senior Vice President Nuclear Engineering and Operations l
Connecticut Yankee Atomic Power Company l
Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Mroczka:
1
SUBJECT:
EXEMPTION FROM CERTAIN REQUIREMENTS OF 10 CFR PART 50, l
APPENDIX J J
Re:
Hadcam Neck Plant i
l The Cor; mission has issued the enclosed exemptions from the requ wents of 10 CFR Part 50, Appendix J, in response to your requests dated March 12, and I
l July 15, 1986. This action grants a permanent exemption for reverse direction I
testing of the auxiliary containment spray penetration. Type C testing of the steam generator blowdown and auxiliary feedwater penetrations were determined to be outside the. scope of Appendix J and, therefore, no Type C testing is q
required for these penetrations.
In addition, the Connission has granted exemptions for temporary relief from:
(1) the Type C testing requirements of Appendix J for the reactor coolant charging sys?.em, containment sump to residual heat removal system and the high pressure safety injection system penetrations; (2) to permit reverse direction testing of the refueling cavity purification, pressurizer relief drain and the reactor coolant pump seal water return penetrations; (3) to permit water versus air testing of 20 additional containment pene-trations; and (4) to permit high pressure testing for the raactor coolant I
system (RCS) sampling, neutron shield fill and RCS loop fill penetrations.
The NRC has concluded, in accordance with 10 CFR 50.12, that the granting of the permanent exemption is justified because compliance is not necessary to l
achieve the underlying purpose of the rule and the granting of the exemptions 0090017 870929 l
p ADOCK 05000213 PDR Y
j Mr. E. J. Mroczka September 29, 1987 j
o for temporary relief are justified because you are making a good faith effort to l
comply with the rule. The enclosed exemption is being forwarded to the Office of the Federal Register for publication. Also enclosed is a copy of the Safety l
Evaluation.
Sincerely, g,spw_1 etomalef m,zaaL brdok2%Df.6 Dennis M. Crutchfield, Director Division of Rea. tor Projacts - III, IV, V and Special Prcjects 1
Office of Nuclear Reactor Regulation l
l
Enclosures:
1 1.,
Exemption j
2.
Safety Evaluation j
i cc.: See next page l
DISTRIBUTION _
(Doci:et File CThomas
'ISAPReadiny MShuttleworth 3
NRC PDR FAkstulewicz Local PDR TMurley/JSneizek DCrutchfield ERossi ORAS OGC - Bethesda EJordan BGrimes JPartlow NThompson l
TBarnhart(4)
ACRS (10)
- See previous concurrence
- LA:ISAPD:DRPSP
'"ISAPD:DRPSP
- ISAPD:DRPSP
- SPLB MShutt1 worth:lt FAkstulewicz AWang JCraig 09/ /87 06/12/87 06/15/87 07/11/87
- D:ISAPD:DRPSP
- 0GC
- ADP CThomas FSchroeder D
chfield 07/23/87 09/16/87 09/21/87 09/2987 i
l l
1 l
.i
q Mr. Edward J. Mroczka
.Haddam Neck Plant
. Connecticut Yankee Atomic Power Company cc: Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford,-Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Richard M. Kacich, Manager Haddam Neck Plant Generation Facilities Licensing RFD #1 Northeast. Utilities Service Company Post Office Box 127E Post Office Box 270
)
l East Hampton, Connecticut 06424 Hartford, Connecticut 06141-0270 Wayne D. Romberg Donald O. Nordquist, Director Vice' President, Nuclear Operations Quality Services Department Northeast Utilitics Service Company Northeast Utilities Service Department Post Office Box 270 Post Office Box 270 i
Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 i
Board of Selectmen Town Hall Haddam, Connecticut 06103 Bradford S. Chase, Under Secretary Energy Division Office of Policy and Management 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC P. O. Box 116 i
East Haddam Post Office East Haddam, Connecticut 06423 i