Safety Evaluation Supporting Amend 117 to License DPR-16
ML20235R521
Person / Time
Site: Oyster Creek
Issue date: 09/30/1987
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20235R520 List:
References
NUDOCS 8710080085
Download: ML20235R521 (3)


Text

j-..

A Atogk UNITED STATES f

g NUCLEAR REGULATORY COMMISSION j

WASHINGTON, D. C. 20555

'a

\\...../

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION, SUPPORTING AMENDMENT NO.117 TO PROVISIONAL OPERATING LICENSE NO. DPR-16 GPU NUCLEAR COPP0 RATION AND JERSEY CENTRAL POWET& LIGHT COMPANY, 0YSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219 l

1.0 INTRODUCTION

By letter dated June 19, 1987, GPU Nuclear Corporation (GPUN or licensee) requested an amendment to the Provisional Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek). The proposed amendment would change the administrative controls section of the Technical Specifications to reflect organizational changes to the corporate and Oyster Creek site organizations of GPU Nuclear Corporation. The proposed Amendment would also change Section 6.10.1.c of the Technical Specifications to be consistent with 10 CFR 50.73 teminology.

2.0 EVALUATION 1.

GPU Nuclear Corporation

[

GPU Nuclear has revised the corporate structure by deleting the organizational divisions under the Vice President Nuclear Assurance and Vice President l

Radiological and Environmental Controls and creating organizational divisions under a Vice President Quality and Radiological Controls and Vice President Planning and Nuclear Safety.

i The current responsibilities of the Vice President Radiological and Environ-mental Controls, and Vice President Nuclear Assurance have been transferred to the new position of Vice President Quality and Radiological Controls. The current responsibilities of Nuclear Safety Assessment have been transferred to the new position of Vice President Planning and Nuclear Safety; and the current responsibilities of the Director Training and Education have been transferred to the Vice President Administration. These changes are shown in revised Figure 6.2-1.

We have reviewed the requested changes and found them acceptable as they have not deleted any functional units that support the operation of Oyster Creek and the organization meets the acceptable criteria of Section 13.1.1 of NUREG-0800, the Standard Review Plan.

8710080085 e70930 PDR ADOCK 05000219 P

PDR

~

. 2.

Onsite Organization A.

The following organization titles of the onsite organizat. ion have been changed.

1)

Manager Plant Administration to Manager-Plans and Programs 2)

Maintenance and Construction Director Oyster Creek to Maintenance, Construction, and Facilities Director-0yster Creek 3)

Operational Maintenance, PM and Surveillance Manager to Preventative Maintenance Program Manager 4)

Radiological Support Manager, OC to Radiological Health Manager-0C i<

5)

Manager Maintenance Engineering to Manager-Plant Engineering (Electrical /I&C) 6)

Manager Support Engineering to Manager-Plant Engineering (Mechanical) 1 7)

Manager Operations Engineering to Manager-Plant Engineering (Operations) 8)

Core Manager to Core Engineering Manager B.

The position of Core Engineering Manager now reports to the Vice President Technical Functions rather than the former position of Manager Operations Engineering.

):

l?

These changes are shown on revised Figure 6.2.2 We find these title changes acceptable as they are administrative changes only. The Core Engineering Manager change is a reassignment of function within the unit organization and is also administrative change.

3, Editorial Changes The licensee has requested editorial changes to pages 6-4, 6-6, 6-7, 6-12, and 6-14 to reflect the revised organization and title changes.

We find these changes acceptable as they are editorial changes to reflect the revised organization.

4.

Record Retention The licensee has requested that Section 6.10.1.c (page 6-19), which reads

" Reportable Occurrence Reports" be changed to "All Licensee Event Reports."

We find this change acceptable as it is consistent with 10 CFR 50.73 tenninology.

i.

3.0 ENVIRONMENTAL CONSIDERATION

This amendment involves changes which are administrative in nature in that they revise organizational responsibilities and titles in the administrative section of the Technical Specifications. Accordingly, the amendment meets ~

the eligibility (criteria for categorical exclusion set forth inPursuant to 10 CFR 51.22 10 CFR 51.22(c) 10).

statement or environmental assessment need be prepared in connection with the issuance of this amendment.

4.0 CONCLUSION

We have concluded, based on the considerations discussed above, that: (1)

.l there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (2) such i

activities will be conducted in compliance with.the Commission's regulations and the issuance of this amendment will not be inimicel to the common defense and security or to the health and safety of the public.

Dated: September 30, 1987 Principal Contributor:

F. A11enspach 4