Forwards Insp Repts 50-456/87-14 & 50-457/87-14 on 870412-0620.No Violations Noted
ML20235R479
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/09/1987
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20235R481 List:
References
NUDOCS 8707210338
Download: ML20235R479 (2)


See also: IR 05000456/1987014

Text

DM6

'

3,

..

,

i

JUL 0 91987 -

.

'

l

. .

. ..

!

Docket No. 50-456

. Docket No. 50-457

Commonwealth Edison' Company-

)

'

i

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

l

' Chicago, IL 60690

'

Gentlemen:

l

This refers to'the routine safety. inspection conducted by Messrs. T. M. Tongue,

'

W. J. Kropp, T. E. Taylor and R. Wharton of this office on April'12 through

l

June 20, 1987,- of activities at the Braidwood Station, Units 1 and 2, authorized

i

by NRC Operating Permit No. NPF-70 and Construction Permit No. CPPR-133 and to

l

1

l

the discussion of our findings with'Mr. E. E. Fitzpatrick and others of your..

staff-at the conclusion of the. inspection.

!

The enclosed copy of our inspection report identifies areas exarrined during

the. inspection.

Within these areas, the inspection consisted of a selective

l

examination of procedures and representative records, observations, and

!

. interviews with personnel.

l

<

l

No violations of NRC requirements were identified during the course of this

j

inspection.

i

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

'

NRC's Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

h

D

.

0

W. S. Little, Director

,

Braidwood Project

Enclosure:

Inspection Reports

No. 50-456/87014(DRP); and'

)

J

No. 50-457/87014(DRP)

See Attached Distribution)

RII

kl

RII[

/

'

,ke/ims

Lit 1

H tzman

e1

I}n

1 F 0,'

t

,g

IEOl

.. . _ _

>-.

.,

Commonwealth Edison Company

2

Distribution

cc w/ enclosure:

l

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

'

G. Berry, OGC

J. Stevens, NRR

'

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, ASLAP

The Honorable D.. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

-

i

__

_J