Text
. . , . . . - .
. _ _ _ -
_
_
Jo'M
'
..
g
,
FEB 131989
Docket / License:
50-336/DPR-65
. Northeast Nuclear-Energy: Company
ATTN: Mr. Edward J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations Group.
P.O. Box 270
Hartford, Connecticut'
06101-0270
Gentlemen:
Subject: Millstone 2 Routine Inspection 50-336/88-28 (11/24/88 - 1/10/89)
This forwards the report of the above subject routine resident safety inspection
of' Millstone. Unit 2.
The results of the inspection were discussed with Messrs.
Scace and Keenan of your staff..-
No violations were identified and no reply to this letter is required.
Inspection of maintenance found an effective program with a. low backlog (Report
Detail 7). .In maintenance training, however, we noted that the number of qualified
personnel . completing training courses and on-the-job training was low.
Also, a
few trainees did not obtain acceptable class examination grades, and no retraining:
schedule was available (Report Detail 7.7).
We believe additional management at-
tention to maintenance training is needed.
Good outage planning ;and scheduling (Report Detail 5.5) and an excellent fuel. re-
ceipt and inspection program (Report Detail 9) were in evidence. We also noted
that, due to personnel turnover, Instrument and Controls staffing was low and about
80 balance-of plant preventive maintenance surveillance had been removed from the
outage work schedule as a result (Report Detail 7.4).
Also, maintenance planners
appear to have a very high workload (Report Detail 7.9).
These considerations will
,
receive additional NRC review.
'
Your cooperation with us is appreciated.
Sincerely,
ORIGINAL SIGNED BY
LEE H. BETTENHAUSEN
l
Lee H. Bettenhausen, Chief
Projects Branch No. 1
Division of Reactor Projects
l
Enclosure: NRC Region I Inspection Report 50-336/88-28
.,
OFFICIAL RECORD COPY
IR MILL 2 88-28 - 0001.0.0
/9 0
8903020155 890213
j
-
{DR
ADOCK0500g6
gj
J
'
-
u
_ _ .
_ _
_ _ _
.
.,
- - }; f. ,
- ,-
[
'
.
<
.
.;
'
k'NortheastNuclearEnergyCompany-
2
FEB 131999
0
cc w/ enc 1:
.
.
.
..
W. D. Romberg,.Vice President, Nuclear Operations.
R. M. Kacich, Manager, Generation Facilities' Licensing
.D. O. Nordquist, Director of-Quality Services
S. E.'Scace, Station' Superintendent
Gerald Garfield, Esquire
Public' Document Room:(PDR)
Local Public-Document Room (LPDR)
Nuclear Safety Information Center'(NSIC)
NRC Senior Resident Inspector-
State of Connecticut.
bec w/ enc 1:
~ Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
DRP Section Chief
J. Shediosky, SRI, Haddam Neck
D. Jaffe, LPM, NRR
R. Bores, DRSS
R. Keimig, DRSS (See Detail 6.0)
'
T. Rebelowski, DRS (See Detail 7.0)
A. Shropshire, DRMA-(see Details 3.1, 8.0)
M. Shanbaky, DRS (see Detail 8.0)
J. Strosnider,'DRS (see Detail 12.1)
E. Baker, VIB/NRR (see Detail 5.3)
RI:DRP
RI:DRP
RI:DRP
RI:DRP
9, W
Os k
&
M
Habighorst/meo
Raymond
McC be
Bettenhausen
/89
1 16
7. (
2/f,./gc/
OFFICIAL RECORD COPY
IR MILL 2 88-28 - 0002.0.0
11/29/80
- _ __
__
--__--_-_--_-_D