Forwards Safety Insp Rept 50-336/88-28 on 881124-890110.No Violations Noted
ML20235P259
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/13/1989
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20235P262 List:
References
NUDOCS 8903020155
Download: ML20235P259 (2)


See also: IR 05000336/1988028

Text

..,...-.

. _ _ _ - _ _

'

g Jo'M

..

,  :

FEB 131989

Docket / License: 50-336/DPR-65

. Northeast Nuclear-Energy: Company

ATTN: Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group.

P.O. Box 270

Hartford, Connecticut' 06101-0270

Gentlemen:

Subject: Millstone 2 Routine Inspection 50-336/88-28 (11/24/88 - 1/10/89)

This forwards the report of the above subject routine resident safety inspection

of' Millstone. Unit 2. The results of the inspection were discussed with Messrs.

Scace and Keenan of your staff..-

No violations were identified and no reply to this letter is required.

Inspection of maintenance found an effective program with a. low backlog (Report

Detail 7). .In maintenance training, however, we noted that the number of qualified

personnel . completing training courses and on-the-job training was low. Also, a

few trainees did not obtain acceptable class examination grades, and no retraining:

schedule was available (Report Detail 7.7). We believe additional management at-

tention to maintenance training is needed.

Good outage planning ;and scheduling (Report Detail 5.5) and an excellent fuel. re-

ceipt and inspection program (Report Detail 9) were in evidence. We also noted

that, due to personnel turnover, Instrument and Controls staffing was low and about

80 balance-of plant preventive maintenance surveillance had been removed from the

outage work schedule as a result (Report Detail 7.4). Also, maintenance planners

,

appear to have a very high workload (Report Detail 7.9). These considerations will

'

receive additional NRC review.

Your cooperation with us is appreciated.

Sincerely, *

ORIGINAL SIGNED BY

l

LEE H. BETTENHAUSEN

Lee H. Bettenhausen, Chief

Projects Branch No. 1

Division of Reactor Projects

l

Enclosure: NRC Region I Inspection Report 50-336/88-28

.,

OFFICIAL RECORD COPY IR MILL 2 88-28 - 0001.0.0

- /9 0

8903020155 890213 j

{DR ADOCK0500g6

'

gj J

u _ _ .

-

__ _ _ _

. .,

[.;

'

;,- <
- }; f. ,

.

.

'

k'NortheastNuclearEnergyCompany- 2 FEB 131999

0

cc w/ enc 1: .

. . ..

W. D. Romberg,.Vice President, Nuclear Operations.

R. M. Kacich, Manager, Generation Facilities' Licensing

.D. O. Nordquist, Director of-Quality Services

S. E.'Scace, Station' Superintendent

Gerald Garfield, Esquire

Public' Document Room:(PDR)

Local Public-Document Room (LPDR)

Nuclear Safety Information Center'(NSIC)

NRC Senior Resident Inspector-

State of Connecticut.

bec w/ enc 1:

~ Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

DRP Section Chief

J. Shediosky, SRI, Haddam Neck

D. Jaffe, LPM, NRR

R. Bores, DRSS

'

R. Keimig, DRSS (See Detail 6.0)

T. Rebelowski, DRS (See Detail 7.0)

A. Shropshire, DRMA-(see Details 3.1, 8.0)

M. Shanbaky, DRS (see Detail 8.0)

J. Strosnider,'DRS (see Detail 12.1)

E. Baker, VIB/NRR (see Detail 5.3)

RI:DRP RI:DRP RI:DRP RI:DRP

9, W

Habighorst/meo

Os k

Raymond

&

McC be

MBettenhausen

/89 1 16 7. ( 2/f,./gc/

OFFICIAL RECORD COPY IR MILL 2 88-28 - 0002.0.0

11/29/80

- _ __ __ --__--_-_--_-_D