ML20235N049
| ML20235N049 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 02/15/1989 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20235N051 | List: |
| References | |
| NUDOCS 8903010002 | |
| Download: ML20235N049 (2) | |
See also: IR 05000461/1988030
Text
m..
-
-
.j
'
. i
,
' ' '
k2 Meg .
UNITED STATES
O*
NUCLEAR REGULATORY COMMISSION
g
,
. .
[-
g
nEctON811
.
, -
.. 5
- -- [
o
cLEN ELLYN, ILUNOIS 601 H
g
.....
.
FEB 15 L
.1
i
i
Docket No. 50-461
Illinois Power Company
ATTN: Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. P. L. Hiland
and S. P. Ray of this office on December 6, 1988, through January 27, 1989, of
activities at Clinton Power Station authorized by NRC Operating License
No. NPF-62, and to the discussion of our findings with Mr. D. P. Hall and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
d
'During this inspection, certain of your activities appeared to be in violation
of NRC requirements as described in the enclosed Notice. A written response
is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
)
R. C. Knop, Chief
Reactor Projects Branch 3
Enclosure:
Inspection Report
No. 50-461/88030(DRP)
See Attached Distribution
e
i
!
Sbk $bS$cks3
_
_ _ _ _ _ _ - - - _ _ _ _ _ _ _ _ _ .
- _ .
_ __
_ - -
.
1
'
.
,
.
.
.
-
3
.
.
.
,
'
ers
"
EEB 15 W69
Illinois Power Company
2
Distribution
cc w/ enclosure:
D. P. Hall, Vice President
J. S. Perry, Assistant
Vice President
R. D. Freeman, Manager,
Nuclear Station
Engineering Department
- DCD/DCB?(RIDS)7^*
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Pub 1'ic
.
Utilities Division
H. S. Taylor, Quality Assurance
Division, Sargent & Lundy
-Engineers
David Rosenblatt, Governor!s
Office of Consumer Services
,
_Sheldon Zabel, Esquire,
Schiff, Hardin, & Waite
L. Larson, Project Manager,
General Electric Company
Chairman of DeWitt County
Illinois Department of
Nuclear. Safety-
D. Schopfer, Project Manager,
Sargent & Lundy Engineers
.
_-_________ ____ - _
>