i
4
.
JUL
6 1987
Docket No. 50-309
Maine Yankee Atomic Power Company
ATTN: Mr. J. B. Randazza
Vice President
Nuclear Operations
83 Edison Drive
Augusta, Maine 04336
Gentlemen:
Subject:
Inspection Report No. 50-309/87-11
A routine safety inspection of your annual emergency preparedness exercise was
conducted by Mr. Thomas of this office, and other members of an NRC team, on
June 8-10, 1987 at the Maine Yankee Atomic Power Plant, Wiscasset, Maine.
Discussions of our findings were presented by Mr. Thomas to you and others of
your staff at the conclusion of the inspection.
Areas examined during this inspection included observation of the annual
exercise and followup of findings identified during previous emergency
preparedness inspections and exercises as described in the NRC Region I
inspection report which is enclosed with this letter.. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel and observation of the emergency exercise
by team members.
Within the scope of this inspection, no violations were observed.
It'was
determined that your emergency response actions were adequate to provide
3
protective measures for the health and safety of the public.
i
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
Original signed By:
Rwm e sacnny
i
fThomasT. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosure: NRC Region I Inspection Report No. 50-309/87-11
l
hh70706bOOgg9
870717
OFFICIAL RECORD COPY
IR MY 87-11 - 0001.0'.0
G
06/25/87
!
\\ \\
rd d
_ _ _ _ - - _ - - _ _ _ - - _ - _ _ _ _ _ _
_ _ ___ - __ _ _
__
. _ _ _ _ _ _ _ _
-
_ _ _ _
_
.
Maine Yankee Atomic Power Company
2
.
cc w/ encl:
C. E. Monty, President
C. D. Frizzle, Assistant Vice President / Manager of Operations
J. H. Garrity, Plant Manager
P. L. Anderson, Project Manager
G. D. Whittier, Licensing Section Head
J. A. Ritsher, Attorney (Ropes and Gray)
1
Phillip Ahrens, Esquire
j
Public Document Room (PDR)
l
Local Public Document Room (LPDR)
l
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maine
FEMA Region I
,
i
bcc W/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
i
DRP Section Chief
M. McBride, RI, Pilgrim
H. Eichenholz, SRI, Yankee
P. Sears, LPM, NRR
j
1
Robert J. Bores, DRSS
1
1
l
i
l
[
RI:DRSS
RI:DR i
R
Thomas /gc
Lazar V
Ma in
1/6/P
6/ N/87/ y/
}/G/87
6/
,7
.
OFFICIAL REQ 0RD' COPY
IR MY 87-11 - 0001.1.0
L
06/25/87
l
L