Forwards Biweekly Listings of Generic Communication Being Considered or Under Development by NRC Staff.Listing Includes All Proposed Generic Communications Reported by 890215
ML20235M103
Person / Time
Issue date: 02/16/1989
From: Berlinger C
Office of Nuclear Reactor Regulation
To: Jacobs R
INSTITUTE OF NUCLEAR POWER OPERATIONS
References
NUDOCS 8902280121
Download: ML20235M103 (6)


Text

_

p l 3 '7 l

'4

FEB 16199g Mr. Rick Jacobs

. Instituteof Nuclear Power Operations j

Suite 1500, 1100' Circle 75 Parkway i

Atlanta', Georgia 30339-3064

Dear Mr. Jacobs:

Enclosed for your information is our biweekly listing of generic comuni-

' cations being considered or under development by the NRC staff. These include Bulletins (type' coded BL on the list), Information Notices (IN) and Generic Letters;(GL). Temporary Instructions, that cover the special NRC inspection effort resulting from certain generic communications, are listed with the type code TI. This listing includes all proposed generic communications that had been reported to us by February 15, 1989.

Sincerely, Original Signed By

^" 4. Berlinger Carl H. Berlinger, Chief Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation

Enclosure:

As stated DISTRIBUTION w/ enclosure:

JLieberman, OE All NRC Division Directors All NRC Branch Chiefs CERossi, NRR CHBerlinger, NRR 0GCB' members PDR

,,,,y NCentraliFilesa.&

"DCS DOEA R/F OGCB R/F DKirkpatrick R/F

'LDerderian, DOE RBarber, DOE

,4g' QC C

0

/plg3,Il0 I

OGCB:D0 :NRR C/0GC 0 A:NRR I

I DCKirkpatrick CHBerlinger j

02//6 /89 02//6/89

,g sfsff$c?!.}

W ORIM o

7 FEB i 6 1989 -

Page,No.

1

,02/16/09' 6;

PROPOSED GENERIC COMMUNICATIONS 4~

IN: PREPARATION-WITHIN THE NRC TP. ORIGIN.

SUBJECT CONTACT PHONE ISSUE OFFICE DATE IN NRR/DRIS ENVIRONMENTAL QUALIFICATION Steve (301) 02/28/89 RVIB OF LIMITORQUE MOV ACTUATOR Alexander 492-0995 TERMINAL BLOCKS & MARATHON 1600 TERMINAL BLKS GL REGION HEAT EXCHANGER FOULING.

Vern Hodge (301) 03/15/89 II 492-1169 IN NRR/ DEST ERRORS IN CALIBRATION OF Joe Joyce (301) 04/28/89 SICB LEAD / LAG AND RATE CIRCUITS IN 492-3265 REACTOR PROTECTION SYSTEMS.

GL NRR/DLPD SAFETY PARAMETER DISPLAY Dick (301) 03/01/89 SYSTEM - ACCEPTABLE METHODS Eckenrode 492-1014 OF IMPLEMENTING REQUIREMENTS GL RES/DE SAFETY RELATED MOTOR OPERATED Owen (301) 02/22/89 EIB VALVE TESTING AND INSPECTION Rothberg 492-3924 IN RES/EME LIMITORQUE SMA SPRING Jerry (301) 02/24/89 DEFORMATION Weidenhamer 492-3839 GL NRR/DOEA CHANGE IN FORMAT FOR NRC Vern Hodge (301) 03/01/89 OGCB GENERIC COMMUNICATIONS 492-1169 GL NRR/ DEST SUPPLEMENT TO GENERIC LETTER Shou-Nien (301) 05/01/89

EMEB 87-11 DEALING WITH ARBITRARY Hou 492-0904 INTERMEDIATE PIPE RUPTURE REQUIREMENTS GL NRR/ DEST INSERVICE INSPECTION OF Robert (301) 02/28/89 EMTB PRESSURE RETAINING WELDS IN Hermann 492-0911 THE REACTOR VESSEL GL AEOD LICENSEE COMMITMENTS FOR John (301) 03/15/89 EMERGENCY RESPONSE DATA Jolicoeur 492-4155 SYSTEM (ERDS) IMPLEMENTATION GL NRR/ DEST NRR RECOMMENDATION ON ISI OF Chen P.

Tan (301) 02/28/89 ESGB MARK I & II STEEL 492-0829 CONTAINMENTS, REFUELING CAVITIES & ASSOC DRAINAGE SYS GL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P.

(301) 07/31/89 SELB B-56, DIESEL RELIABILITY Chopra 492-0835 GL NRR/ DEST INSERVICE TESTING FOR PUMPS Ted (301) 02/28/89 EMEB AND VALVES Sullivan 492-0901 l'

Y.

Page.No.

2

',02/16/89 PROPOSED GENERIC COMMUNICATIONS Y

IN PREPARATION WITHIN THE NRC TP ORIGIN.

SUBJECT CONTACT PHONE ISSUE OFFICE DATE GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 03/28/89 OTSB SPECIFICATION IMPROVEMENT--

492-1189 REMOVAL OF COMPONENT LISTS IN NRR/DRIS INADEQUATE FIRE DAMPER Joe (301) 02/17/89 VIB OPERABILITY TESTS UNDER AIR Petrosino 492-0979 FLOW CONDITIONS IN NRR/DRIS' POTENTIAL MANUFACTURER Joe (301) 02/28/89

.VIB DEFECTS IN CUTLER HAMMER E-30 Petrosino 492-0979 SWITCHES MANUFACTURED PRIOR TO A CERTAIN DATE GL NRR/ DEST MINIMUM EDGE DISTANCE FOR John Ma (301) 03/01/89 j

ESGB INSTALLATION OF ANCHORS IN 492-1376 1

CONCRETE IN AEOD THE REPORTING OF SAFETY VALVE Mary S.

(301) 02/17/89 AND SAFETY-RELIEF VALVE Wegner 492-7818 EVENTS PURSUANT TO 10 CFR 50.73 GL NRR/DREP CHANGE IN THE REGULATORY John (301) 02/28/89 PRPB LIMIT FOR OCCUPATIONAL Buchanan 492-1097 EXPOSURE OF THE SKIN TO BETA RADIATION FROM HOT PARTICLES GL NRR/DOEA-VOLUNTARY ENTRY INTO R.

J.

(301) 05/15/89 OTSB TECHNICAL SPECIFICATION 3.0.3 Giardina 492-1188 GL RES/DSIR ASME SECTION 3 REPLACEMENTS Robert (301) 04/10/89 EIB Kirkwood 492-3928 GL RES/IEB RESOLUTION OF: GI/70, PORV R Kirkwood 492-3928 06/01/89

& RPSIB AND BLOCK VALVE RELIABILITY, E Throm

-3911 AND GI/94, ADDITIONAL LOW TEMP OVERPRESS PROTECTION FOR LWRS TI NRR/ DEST INSPECTION OF IMPLEMENTATION Ted (301) 03/15/89 EMEB OF BULLETIN TO EXTEND IEB Sullivan 492-0901 85-03 "MOV COMMON MODE FAILURES DURING PLANT TRANSIENTS TI NRR/ DEST INSPECTION OF COMPLIANCE WITH T.

E.

(301) 03/01/89 SRXB BULLETIN 88-04:

Collins 492-0897

" SAFETY-RELATED PUMP LOSS"

,Page,No.

3

.02/16/89 PROPOSED GENERIC COMMUNICATIONS g

IN PREPARATION WITHIN THE NRC TP-ORIGIN.

SUBJECT CONTACT PHONE ISSUE OFFICE DATE TI NRR/DRIS INSPECTION OF IMPLEMENTATION Ed Baker (301) 02/24/89

'RVIB OF BULLETIN 87-02: FASTENER 492-0959 TESTING TO DETERMINE CONFORMANCE WITH MATERIAL SPECS TI'NRR/DRIS FOLLOW-UP OF RESPONSES TO Ed Baker (301) 03/31/89 RVIB BULLETIN 88-05: NONCONFORMING 492-0959 MATERIALS PROVIDED BY PSI /WJM TI NRR/ DEST REVIEW OF LICENSEE RESPONSES Warren Lyon (301) 02/17/89 SRXB TO GENERIC LETTER 88-17 ON 492-0G91 OPERATION WITH LOWERED REACTOR COOLANT SYSTEM INVENTORY GL NRR/DLPQ DEVELOPMENT AND Don (301) 03/01/89 LOAB IMPLEMENTATION OF PROGRAM TO Brinkman 492-3216 IDENTIFY NONCONFORMING MATERIALS & EQUIPMENT BEFORE INSTALLATION IN REGION I CONTAMINATION AND DEGRADATION Jaime (301) 02/24/89 OF SAFETY RELATED BATTERY Guillen 492-1170 CELLS

]

IN NRR/DREP SAFETY SIGNIFICANCE OF Sammy Diab (301) 03/15/89 PRAB NUCLEAR POWER PLANT AIR 492-1075 COOLING SYSTEMS IN REGION LOW TEMPERATURE OVERPRESSURE M Shymlock (404) 03/01/89 II PROTECTION VALVE SURVEILLANCE 331-5542

(

TESTING IN AEOD/IRB EMERGENCY COMMUNICATION Bill (301) 02/28/89 SYSTEM Reckley 492-9916 BL NRR/ DEST INTERGRANULAR STRESS CORR Dave (301) 04/01/89 EMTB CRACKING OF HIGH-HARDNESS Sellers 492-0930 STUDS IN ANCHOR DARLING S350W SWING CHECK VALVES OR SIMILAR VLVS GL NRR/DOEA REMOVAL OF 3.25 LIMITATION OF Tom Dunning (301) 03/01/89 o

OSTB SPEC 4.0.2 FOR REFUELING 492-1189 SURVEILLANCE GL NRR/DOEA LINE ITEM TECH SPEC Tom Dunning (301) 03/15/89 OTSB IMPROVEMENT - ALTERNATIVE FOR 492-1189 SPEC 4.0.2 - 3.25 LIMITATION l

t I

w

,Page.No.

4 02/16/09 PROPOSED GENERIC COMMUNICATIONS g

IN PREPARATION WITHIN THE NRC

\\

TP ORIGIN.

SUBJECT CONTACT PHONE ISSUE i

OFFICE DATE IN REGION TIMELINESS OF FIRE BRIGADE Joe Ulie (312) 02/28/89 III

RESPONSE

790-5274 IN REGION WEIGHT AND CENTER OF GRAVITY J.

A.

(312) 02/28/89 III DISCREPANCIES FOR COPES Gavula 790-5761 VULCAN AIR OPERATED VALVES IN REGION EXTERNALLY INDUCED CHLORIDE J.

F.

(312) 02/28/89 III STRESS CORROSION CRACKING OF Schapker 790-5562 STAINLESS STEEL PIPE IN NRR/DOEA SUPPLEMENT 1 TO IN 86-101:

Walton (301) 02/28/89 OEAB LOSS OF DECAY HEAT REMOVAL Jensen 492-1190 CAPABILITY EVENTS DURING CAVITY PUMPDOWN GL NRR/DOEA SERVICE WATER SYSTEM PROBLEMS Vernon (301) 03/15/89 OGCB AFFECTING SAFETY-RELATED Hodge 492-1169 EQUIPMENT IN REGION I POTENTIAL FAILURE CONDITION Roy Mathew (215) 03/31/89 OF GE 4.16KV MAGNE-BLAST TYPE 337-5194 BREAKERS IN NRE/DOEA ENEWJ 01/20/89 ANO-1 EVENT, Rick (301) 02/17/89 OEAB INVOLVING CHECK VALVE FAILURE Kendall 492-3140 THAT ALLOWED RCS LEAKAGE TO HPI PIPING OUTSIDE CONTAINMENT IN NRR/DOEA ENEWJ PROBLEMS WITH CIRCUIT Rick (301) 03/10/89 DEAB BREAKER ANTI-PUMP CIRCUITRY Kendall 492-3140 PREVENTING AUTO INITIATION OF SAFETY FUNCTIONS IN NRR/DDEA ENEWJ HIGH ENVIRONMENTAL Tom Greene (301) 03/10/89 DEAD TEMPERATURES AT NUCLEAR POWER 492-1176 l

PLANTS l

IN NRR/DOEA ENEWJ INSTRUMENT DEFICIENCIES T.

Silko (301) 02/28/89 DEAB DISCOVERED AS A RESULT OF 492-0981 GENERIC LETTER 88-14 i

IN NRR/ DEST ENEWJ SUBSTANDARD FASTENERS Ray (301) 03/31/89 RVIB SUPPLIED BY HARDWARE Cilimberg 492-3220 SPECIALTIES IN NRR/ DEST ENEWJ ANOMALY IN FULL LENGTH S.

L.

Wu (301) 03/03/89 SRXB HAFNIUM CONTROL RODS 492-1172

i e

Page.No.

5

{

O2/16/89

]

g PROPOSED GENERIC COMMUNICATIONS l

,g IN. PREPARATION WITHIN THE NRC l

TP ORIGIN.

SUBJECT CONTACT PHONE ISSUE OFFICE DATE IN NRR/DOEA'ENEWJ SUPP 1 TO IN 88-73 Jaime (301) 03/03/89 OGCB DIRECTIONAL-DEPENDANT LEAK Guillen 492-1153 CHARACTERISTICS OF CONTAINMENT PURGE VALVES I

IN REGION ENEW3 FAILURE OF LIMITORQUE John (312) 04/01/89 III VALVE OPERATOR HOUSINGS Harrison 790-5635 l

IN REGION ENEW3 SUPPLEMENT 1 TO.IN Robert (404) 04/15/89 l

II 88-86: OPERATING WITH Schin 331-6913 MULTIPLE GROUNDS IN DIRECT CURRENT DISTRIBUTION SYSTEMS l

1 l

FEB f 6 '1999 l

l

.i Mr. Rick Jacobs I

Institute of Nuclear Power Operations l

Suite 1500, 1100 Circle 75 Parkway Atlanta, Georgia 30339-3064 l

Dear Mr. Jacobs:

l 1

Enclosed for your information is our biweekly listing of generic communi-cations being considered or under development by the NRC staff. These include Bulletins (typecodedBLonthelist),InformationNotices(IN)andGeneric j

Letters (GL). Temporary Instructions, that cover the special NRC inspection effort resulting from certain generic communications, are listed with the type code TI. This listing includes all proposed generic communications that had i

been reported to us by February 15, 1989.

Sincerely.

Original Signed By

' ' 4. Dc inar Carl H. Berlinger, Chief Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation

Enclosure:

As stated DISTRIBUTION w/ enclosure:

JLieberman, OE All NRC Division Directors All NRC Branch Chiefs CERossi NRR CHBerlinger, NRR 0GCB members

~

PDR tral Files 7

DOEA R/F OGCB R/F 1/' / F~

DKirkpatrick R/F LDerderian, DOE g9 RBarber DOE QCf Q&

C/0GCB.DOEA:NRR OGCB:00EA:NRR DCKirkpatrick CHBerlinger 02//6 /89 02//k/89 20: is ? G.'et Cf7'

.FEB i 61989 Pega No.

11

'02/16/89.

j PROPOSED G$NERIC COMMUNICATIONS

]

t' IN-PREPARATION WITHIN THE NRC l

TP' ORIGIN.

SUBJECT CONTACT PHONE ISSUE l

OFFICE DATE i

IN NRR/DRIS ENVIRONMENTAL QUALIFICATION Steve (301) 02/28/89 RVIB OF LIMITORQUE MOV ACTUATOR Alexander 492-0995 TERMINAL BLOCKS & MARATHON 1600 TERMINAL BLKS GL REGION HEAT EXCHANGER FOULING, Vern Hodge (301) 03/15/89 II 492-1169 IN NRR/ DEST ERRORS IN CALIBRATION OF Joe Joyce (301) 04/28/89 SICB LEAD / LAG AND RATE CIRCUITS IN 492-3265

~ REACTOR PROTECTION SYSTEMS.

GL NRR/DLPD SAFETY PARAMETER DISPLAY Dick (301) 03/01/89 SYSTEM - ACCEPTABLE METHODS Eckenrode 492-1014 OF IMPLEMENTING REQUIREMENTS GL RES/DE.

SAFETY RELATED MOTOR OPERATED Owen (301) 02/22/89 EIB VALVE TESTING AND INSPECTION Rothberg 492-3924

'IN RES/EME LIMITORQUE SMA SPRING Jerry (301) 02/24/89 DEFORMATION Weidenhamer 492-3839 GL NRR/DOEA CHANGE IN FORMAT FOR NRC Vern Hodge (301) 03/01/89 OGCB GENERIC COMMUNICATIONS 492-1169 GL NRR/ DEST SUPPLEMENT TO GENERIC LETTER Shou-Nien (301) 05/01/89 EMEB 87-11 DEALING WITH ARBITRARY Hou 492-0904 INTERMEDIATE PIPE RUPTURE REQUIREMENTS GL NRR/ DEST INSERVICE INSPECTION OF Robert (301) 02/28/89 EMTB PRESSURE' RETAINING WELDS IN Hermann 492-0911 THE REACTOR VESSEL GL AEDD LICENSEE COMMITMENTS FOR John (301) 03/15/89 EMERGENCY RESPONSE DATA Jolicoeur 492-4155 SYSTEM (ERDS) IMPLEMENTATION GL NRR/ DEST NRR RECOMMENDATION ON ISI OF Chen P.

Tan (301) 02/28/89 ESGB MARK I & II STEEL 492-0829 CONTAINMENTS, REFUELING CAVITIES & ASSOC DRAINAGE SYS GL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P.

(301) 07/31/89 SELB B-56, DIESEL RELIABILITY Chopra 492-0835 GL NRR/ DEST INSERVICE TESTING FOR PUMPS Ted (301) 02/28/89 EMEB AND VALVES Sullivan 492-0901

.. g,

Pago No.

2 02/16/89 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.

SUBJECT CONTACT PHONE ISSUE OFFICE DATE GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 03/28/89 OTSB SPECIFICATION IMPROVEMENT -

492-1189 REMOVAL OF COMPONENT LISTS IN NRR/DRIS INADEDUATE FIRE DAMPER Joe (301) 02/17/89 VIB OPERABILITY TESTS UNDER AIR Petrosino 492-0979 FLOW CONDITIONS IN NRR/DRIS POTENTIAL MANUFACTURER Joe (301) 02/28/89 VIB DEFECTS IN CUTLER HAMMER E-30 Petrosino 492-0979 SWITCHES MANUFACTURED PRIOR TO A CERTAIN DATE GL NRR/ DEST MINIMUM EDGE DISTANCE FOR John Ma (301) 03/01/89 ESGB INSTALLATION OF ANCHORS IN 492-1376 CONCRETE IN AEOD THE REPORTING OF SAFETY VALVE Mary S.

(301) 02/17/89 AND SAFETY-RELIEF VALVE Wegner 492-7818 EVENTS PURSUANT TO 10 CFR 50.73-GL NRR/DREP CHANGE IN THE REGULATORY John (301) 02/28/89 PRPB LIMIT FOR OCCUPATIONAL Buchanan 492-1097 EXPOSURE OF THE SKIN TO BETA RADIATION FROM HOT PARTICLES GL NRR/DOEA VOLUNTARY ENTRY INTO R.

J.

(301) 05/15/89 OTSB TECHNICAL SPECIFICATION 3.0.3 Giardina 492-1188 GL RES/DSIR ASME SECTION 3 REPLACEMENTS Robert (301) 04/10/89 EIB Kirkwood 492-3928 GL RES/IEB RESOLUTION OF: GI/70, PORV R Kirkwood 492-3928 06/01/89 t< RPSIB AND BLOCK VALVE RELIABILITY, E Throm

-3911 AND GI/94, ADDITIONAL LOW TEMP OVERPRESS PROTECTION FOR LWRS TI NRR/ DEST INSPECTION OF IMPLEMENTATION Ted (301) 03/15/89 EMEB OF BULLETIN TO EXTEND IEB Sullivan 492-0901 85-03 "MOV COMMON MODE FAILURES DURING PLANT TRANSIENTS TI NRR/ DEST INSPECTION OF COMPLIANCE WITH T.

E.

(301) 03/01/89 SRXB BULLETIN 88-04:

Collins 492-0897

" SAFETY-RELATED PUMP LOSS"

Pase No.-

3 02/16/89~

PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC Lg TP. ORIGIN.

SUBJECT CONTACT PHONE ISSUE OFFICE-DATE TI NRR/DRIS INSPECTION OF IMPLEMENTATION Ed Baker (301) 02/24/89 RVIB OF-BULLETIN 87-02: FASTENER 492-0959

-TESTING TO DETERMINE CONFORMANCE-WITH MATERIAL L

SPECS TI NRR/DRIS FOLLOW-UP OF RESPONSES TO Ed Baker (301) 03/31/89 RVIB-BULLETIN 88-05: NONCONFORMING 492-0959 MATERIALS PROVIDED BY PSI /WJM L

TI NRR/ DEST. REVIEW OF LICENSEE RESPONSES Warren Lyon (301) 02/17/89 SRXB TO GENERIC LETTER 88-17 DN 492-0891 OPERATION WITH LOWERED REACTOR COOLANT SYSTEM INVENTORY GL NRR/DLPQ DEVELOPMENT'AND Don (301) 03/01/89 LQAB IMPLEMENTATION OF PROGRAM TO Brinkman 492-3216 IDENTIFY NONCONFORMING MATERIALS & EQUIPMENT BEFORE INSTALLATION IN REGION I CONTAMINATION AND DEGRADATION Jaime (301) 02/24/89 OF SAFETY RELATED BATTERY Guillen 492-1170 CELLS IN NRR/DREP SAFETY SIGNIFICANCE OF.

Sammy Diab (301) 03/15/89 PRAB-NUCLEAR POWER PLANT AIR 492-1075 COOLING SYSTEMS IN REGION LOW TEMPERATURE OVERPRESSURE M Shymiock (404) 03/01/89 II PROTECTION VALVE SURVEILLANCE 331-5542 TESTING IN AEDD/IRB EMERGENCY COMMUNICATION Bill (302) 02/28/89 SYSTEM Reckley 492-9916 BL NRR/ DEST INTERGRANULAR STRESS CORR Dave (301) 04/01/89 EMTB CRACKING OF.HIGH-HARDNESS Sell er s 492-0930 STUDS IN ANCHOR DARLING S350W SWING CHECK VALVES OR SIMILAR VLYS GL NRR/DDEA REMOVAL OF 3.25 LIMITATION OF Tom Dunning (301) 03/01/89 OSTB SPEC 4.0.2 FOR REFUELING 492-1189 SURVEILLANCE GL NRR/DOEA LINE ITEM TECH SPEC Tom Dunning (301) 03/15/89 OTSB IMPROVEMENT - ALTERNATIVE FOR 492-1189 SPEC 4.0.2 - 3.25 LIMITATION 1

i I

l*

Page No.

4:

C' 02/16/89 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC 1

l TP ORIGIN.

SUBJECT-CONTACT PHONE ISSUE OFFICE DATE IN REGION' TIMELINESS OF FIRE BRIGADE Joe Ulie (312) 02/28/89-1 III

RESPONSE

790-5274 IN' REGION WEIGHT AND CENTER OF GRAVITY J.

A.

(312) 02/28/89 III DISCREPANCIES FOR COPES' Gavula 790-5761 I

VULCAN AIR OPERATED VALVES IN REGION EXTERNALLY INDUCED CHLORIDE J.

F.

(312) 02/28/89 III STRESS CORROSION CRACKING OF Schapker 790-5562 STAINLESS STEEL PIPE IN NRR/DOEA SUPPLEMENT 1 TO IN 86-101:

Walton (301) 02/28/89-DEAB LOSS OF DECAY HEAT REMOVAL Jensen 492-1190 CAPABILITY EVENTS DURING CAVITY PUMPDOWN GL NRR/DOEA SERVICE WATER SYSTEM PROBLEMS Vernon (301) 03/15/89 OGCB AFFECTING SAFETY-RELATED Hodge 492-1169 EQUIPMENT IN REGION I POTENTIAL FAILURE CONDITION Roy Mathew (215) 03/31/89 OF GE 4.16KV MAGNE-BLAST TYPE 337-5194 BREAKERS IN NRE/DOEA [NEW3 01/20/89 ANO-1 EVENT, Rick (301) 02/17/89 OEAB INVOLVING CHECK VALVE FAILURE Kendall 492-3140 THAT ALLOWED RCS LEAKAGE TO HPI PIPING OUTSIDE CONTAINMENT IN NRR/DOEA [NEW3 FROBLEMS WITH CIRCUIT Rick (301) 03/10/89 OEAB BREAKER ANTI-PUMP CIRCUITRY Kendall 492-3140 PREVENTING AUTO INITIATION OF SAFETY FUNCTIONS IN NRR/DOEA [NEW3 HIGH ENVIRONMENTAL Tom Greene (301) 03/10/89 DEAB TEMPERATURES AT NUCLEAR POWER 492-1176 PLANYS IN NRR/DOEA ENEW3 INSTRUMENT DEFICIENCIES T.

Silko (301) 02/28/89 DEAB DISCOVERED AS A RESULT OF 492-0981 GENERIC LETTER 88-14 IN NRR/ DEST [NEW3 SUBSTANDARD FASTENERS Ray (301) 03/31/89 RVIB-SUPPLIED BY HARDWARE Cilimberg 492-3220 SPECIALTIES IN NRR/ DEST [NEW3 ANOMALY IN FULL LENGTH S.

L.

Wu (301) 03/03/89 SRXB HAFNIUM CONTROL RODS 492-1172

m_--_-___

...f

'Psga-No.

'5

.02/16/89 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC 1

TP ORIGIN.

SOBJECT CONTACT PHONE ISSUE OFFICE DATE IN NRR/DDEA ENEW3 SUPP 1 TO IN 88-73 Jaime (301)

'03/03/89 OGCB DIRECTIONAL-DEPENDANT LEAK Guillen 492-1153 CHARACTERISTICS OF CONTAINMENT PURGE VALVES IN REGION ENEW3 FAILURE OF LIMITORQUE John (312) 04/01/89

~

.III VALVE OPERATOR HOUSINGS Harrison-790-5635

.IN REGION ENEW3 SUPPLEMENT 1 TO IN Robert (404) 04/15/89 II 88-86: OPERATING WITH Schin 331-6913 MULTIPLE GROUNDS IN DIRECT CURRENT DISTRIBUTION SYSTEMS 4